Attachment 0001 - AED Req.pdf
PDF 6 KB Posted
- Attached to
- Overhaul of the CH-47 Drive Adapter Assembly
- Solicitation number
- W58RGZ-20-R-0068
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11/12/2019
M146PRID 145D3407-7Part Number
1615-01-140-6703NSN CH-47System
DRIVE ADAPTER ASSEMBLYNomenclature
YAdequate DMWR Available?
DMWR-55-1615-322DMWR ID
11/11/2016DMWR Date
DMWR Chg #
YPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
- DMWR 55-1615-322 dated 11 November 2016 is in IADS.
- Magnetic particle inspection is a critical characteristic. Magnetic particle inspection shall be done as per ASTM E1444 for cracks. None allowed.
- Component plating amd subsequent bake is a critical characteristic and is required per the overhaul process. Contractor shall acquire proper plating facilities and/or equipment to perform the outlined procedures.
- Shot peening coverage is a critical characteristic. An AMCOM/CCDEVCOM approved source shall be utilized when shot peening is a critical process. Approved sources shall be obtained from AMCOM.
- Balance of the assembly within limits and recording by serial number and part number is a critical characteristic.
- The applied torque during assembly is a critical characteristic as follows. Torque nut/bolt (P/N BACN10RJ9N) onto bolt (P/N 114D3053-3) to 1000 to 1100 inch-pounds (wet). Turn nut only. Hold bolt head firmly to prevent bolt from turning. Lubricate all threads with MIL-PRF-7808 or MIL-PRF-23699 oil.
Identify Any Special Processes, Test Procedures, and/or Instructions
YCritical Safety Item?
Per coordination with Cargo Division, there are no emerging airworthiness issues, new ECP affecting CSI, concerns over reliability, durability issues that would affect the overhaul of the subject item in its current configuration.
Special Airworthiness Considerations
FCDD-AMA-M-Sustainment has verified the CSI/NST status through the ARISE CIM on 25 June 2019 and the NHA is CSI and NST. The subcomponents are CSI and Non-NST. Endurance, Fatigue, and Interchange are not required for overhaul. Updated NHA table in ARISE database. No other changes. DEM
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
The Prime or OEM is required to submit a Frozen Plan 30 days after contract award to Engineering Directorate (ED) and Aviation Engineering Directorate (AED). The Frozen Plan will be reviewed and require approval by ED and AED prior to government acceptance of contract deliverable assets.
Other Requirements / Comments (Part II)
The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEOs D2106, D2107, and D2108.
Other Requirements / Comments (Part III)
FCDD-AMA-M-Sustainment has re-verified the CSI/NST status through the ARISE CIM on 7 August 2019 and the NHA is CSI and NST. The subcomponents are CSI and Non-NST. Endurance, Fatigue, and Interchange are not required for overhaul. No changes made. DEM
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
YDoes QE-STD-2 Apply?
Y
Additional CSI Requirements
CSI Contains CSI Replacement Parts? YEngineering Testing Required?
The Contractor shall flow down the Critical Characteristics and QE-STD-1 to all Suppliers of CSIs.
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
01/01/1987Approved Date
M&O AED REQUIREMENTS DATA
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
1615-01-140-6703NSN CH-47System
Special Post-Contract Award Requirements
RStatus
Correlation Performance Study Requirements
1615-01-140-6703NSN CH-47System
C4598
D1718
D2106
D2107
D2108
D2128A
D2133A
D2145
D2148
D2212
D2213
D2214
D2215
D2216
D2217
D2218
D2219
D2220A
D2221
D2222
D2223
D2224
D2225B
D2226A
D2227
D2228
D2229
D2230
D2231
D2232
D2233
D2234
D2235
D2236
D2237
D2238
D2283
D2466
D2501
D2517
D2556
D2576
D2579
D2584
D2598
D2635
See Table 2-1 Special Tools and Equipment and Table 2-2 Inspection and Test Equipment.
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
File details come from the government source that posted it. Updated .