Attachment 0001 - AED Requirements AX9M9025AX.pdf
PDF 7 KB Posted
- Attached to
- HEAD ROTARY WING, MAIN
- Solicitation number
- W58RGZ-19-R-0190
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/09/2018
2018H052PRID 7-311411003-625Part Number
1615-01-512-0889NSN AH-64 D/ESystem
HEAD ROTARY WING, MAINNomenclature
YAdequate DMWR Available?
DMWR-1-1615-312DMWR ID
07/09/2010DMWR Date
1DMWR Chg #
YPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
Special Processes include: Fluorescent Penetrant Inspection, Shot Peen, Surface Finish Inspection, Magnetic Particle Inspection and Fixed process control for finishing holes, edges and surfaces of stainless steel laminates. Test Procedures: WP 0080.
Measurement and Test Equipment calibration instructions: WP 0001. Facility Requirements: WP 0003.
Identify Any Special Processes, Test Procedures, and/or Instructions
YCritical Safety Item?
(1) Safety of Flight, H-64-17-SOF-02, Visual inspection of the lower Nut, P/N 7-511411161-3 on the outboard Strap Pack Bolt for Strap Packs, P/Ns 7-311411146-5/-7, and 7-511411146-ALL.
(2) A new Strap Pack is to be fielded in the near future P/N 7-611411146-101.
(3) AED is currently working with Boeing on a new collar to be installed on Strap Pack assemblies. Testing is being scheduled in the near future. At this time the collar does not have a P/N. This should be an AVIM or AVUM task and should be put into the Main Rotor Hub DMWR once it is approved.
Special Airworthiness Considerations
AED Notes: AEM Sustainment has verified the CSI and NST data through the ARISE CIM database on 03/23/2018. This Assembly is CSI and NST. Contains subcomponents that are CSI and NST. Engineering Testing Fatigue, Endurance, and Interchange is not required for Overhaul. Additionally, there is a new QE-STD 2 dated 19June 2017. MW.
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
Special Post-Contract Award Requirements
The Prime or OEM is required to submit a Frozen Plan 30 days after contract award to Engineering Directorate (ED) and Aviation Engineering Directorate (AED). The Frozen Plan will be reviewed and require approval by ED and AED prior to government acceptance of contract deliverable assets.
Other Requirements / Comments (Part II)
The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEOs E1846, E1847, 1848B, E1849A, E1850, E1851A.
Other Requirements / Comments (Part III)
AED Notes: AEM Sustainment has re-verified the CSI and NST data through ARISE CIM database on 05/08/2018. These were the changes made to the data. Added PNs 7-311411155 and 7-311411155-9. MW.
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
YDoes QE-STD-2 Apply?
Y
Additional CSI Requirements
CSI Contains CSI Replacement Parts? YEngineering Testing Required?
The Contractor shall flow down the Critical Characteristics and QE-STD-1 to all Suppliers of CSIs.
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
08/16/2004Approved Date
M&O AED REQUIREMENTS DATA
Correlation Performance Study Requirements
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
1615-01-512-0889NSN AH-64 D/ESystem
RStatus
1615-01-512-0889NSN AH-64 D/ESystem
E1349
E1392
E1459
E1471A
E1479C
E1480A
E1513
E1515A
E1516
E1520B
E1521
E1522
E1523
E1524
E1525
E1526
E1527
E1528
E1529A
E1530
E1531
E1532
E1533
E1534B
E1536
E1537A
E1538
E1539
E1540
E1541A
E1542
E1543
E1544A
E1545
E1547
E1577
E1616
E1618
E1632A
E1649
E1672
E1673
E1677A
E1678
E1680
E1692A
E1698A
E1715
E1761A
The listed workpackages provide a listing of critical tools and test/equipment that require AED approval for substitution. WP 0009, WP 0085, WP 0090, WP 0091, WP 0092, WP 0093, WP 0094, WP 0095, WP 0097, WP
0098.
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
1615-01-512-0889NSN AH-64 D/ESystem
E1846
E1847
E1848B
E1849A
E1850
E1851A
E2010
E2046
E2055
E2109A
E2117
E2144
E2162
E2184
E2206
E2212
E2289
E2305
T7672
T7673A
T7675
T7678A
T7722
T7723A
File details come from the government source that posted it. Updated .