Attachment_0001_-_Performance_Requirements_Summary_-_15MAR18.pdf

PDF 42 KB Posted

Attached to
Preventative Maintenance, Calibration and On-Site Repair of twelve (12) Zeiss Coordinate Measuring Machines
Solicitation number
W58RGZ17R0259
Issued by

About this file

Attachment 0001 - Performance Requirements Summary for the Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1:

Performance Requirements Summary

PWS

Paragraph Task

Performance Standard

Acceptable Quality Levels

(AQL)

Surveillance Method/By Whom

C.1.2, C.5.1, C.5.3. All

On-site Annual Calibration and Preventativ e Maintennce to Zeiss Coordinate Measuring Machines

(CMM)

specified in

PWS.

The contractor shall perform on-site Annual Calibration and Preventative Maintenance to Zeiss CMMs IAW OEM Standards and scheduled within 20 days of calibration due date 100% of scheduled time.

0% failure to perform on-site Annual Calibration and Preventative Maintenance to Zeiss CMMs IAW

OEM

Standards and scheduled at least within 20 days advance of calibration due date.

100% Inspection- COR will review on-site Annual Calibration and Preventative Maintenance to Zeiss CMMs IAW

OEM

standards and schedule at completion.

C.1.2, C.5.1, C.5.4.1

On-site repairs to Zeiss CMMs as specified in

PWS.

The contractor shall respond to request within 36 hrs after notification and have qualified technical representative on site with in 48 hrs after response to notification to perform on-site repairs 100% of required time.

0% failure to respond to request within 36 hrs after notification and have qualified technical representati ve on site with in 48 hrs after response to notification to perform on-site repairs

100% Inspection- COR will review response times after notification.

C.1.2, C.5.1, C.5.4.2

On-site preparation and set up for CMM relocation as specified in PWS.

The contractor shall respond to request within 36 hrs after notification and have qualified service technician on site with in 96 hrs after response to notification to perform preparation and set up of CMM relocation 98% of required time.

2% failure to respond to request within 36 hrs after notification and have qualified service technician on site with in 96 hrs after response to notification to perform preparation and set up of CMM relocation .

100% Inspection- COR will review response times after notification.

C.1.2, C.5.1, C.5.5 All

Parts and Materials support as specified in

PWS.

The contractor shall provide parts and materials support with non-asbestos containing parts and warrentied thirty (30) days on labor and six (6) months on parts 100% of the time.

0% failure to provide parts and materials with non-asbestos containing parts and warranty thirty (30) days on labor and six

(6) months on parts

100% inspection- COR will review parts and materials for non-asbestos and warranty periods for parts and labor at each occurrence.

C.5.6.2 All, Provide an on-site specific safety plan as specified in PWS.

The contractor shall provide an on-site specific safety plan within 30 days after contract award with required content 100% at timeframe required.

0% failure to provide an on-site specific safety plan within 30 days after contract award with required content .

100% inspection- COR will review time of safety plan submittal and content IAW

PWS.

C.1.12, C.1.12.1, C.1.12.2, C.1.12.3, C.1.12.4, C.5.6.3 All, C.5.6.4, C.5.6.5 All

Adherence to CCAD regulations (Safety, Security, Fire and Environmen tal as specified in

PWS.

The contractor shall be in adherence to CCAD Regulations (Safety, Security, Fire and Environmental) as specified in PWS 100% of the time at each visit.

0% failure to adherence to CCAD regulations (Safety, Security, Fire and Environment

al) during each on-site visit

100% Inspection- COR will review on site adherence to

CCAD

regulations during each visit