Final_Solicitation_W58RGZ-16-R-0143.pdf

PDF 162 KB Posted

Attached to
Overhaul/Repair of the AH-64 (A/E) Power Supply
Solicitation number
W58RGZ-16-R-0143
Issued by

About this file

Solicitation

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W58RGZ-16-R-0143

X

2017APR21

2017MAY26

DOA1

2017APR21 SEE SCHEDULE

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

ANDREW CAMERON

(256)842-7478

CCAM-AL-M

ANDREW.E.CAMERON.CIV@MAIL.MIL

1 71

X 1

X 5 X 18

X 20 X 21 X 25

X 36

X 39

X 42

X 52

X 53

X 59

X 70

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: ANDREW CAMERON

Buyer Office Symbol/Telephone Number: CCAM-AL-M/(256)842-7478

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE: COMPETITION FOR THIS ACTION IS OPEN TO ALL RESPONSIBLE FIRMS WHO QUALIFY AS A SMALL BUSINESS

UNDER NAICS CODE 335931.

THIS WILL BE A 5 YEAR FIRM-FIXED-PRICE INDEFINITE DELIVERY INDEFINTIE QUANTITY (IDIQ) CONTRACT PURSUANT TO FAR 52.216-22.

NO GOVERNMENT FURNISHED MATERIAL (GFM) OTHER THAN THE REPARABLES WILL BE PROVIDED.

ACCESS TO DLA EMALL IS NOT AUTHORIZED.

THE GOVERNMENT IS ONLY OBLIGATED TO PURCHASE THE MINIMUM QUANTITY. SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED WILL BE

PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD IN WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF DELIVERY

ORDERS AND NOT BY THE CONTRACT ITSELF.

SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.

THE CONTRACTOR MAY BE REQUESTED TO SUBMIT ADDITIONAL COST OR PRICING DATA IF ONLY ONE OFFER IS RECEIVED IAW DFARS CLAUSE 252.215-7008, ENTITLED "ONLY ONE OFFER."

THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM QUANTITY.

AH-64

NOUN: SUBMERGED, PUMP

INPUT AND OUTPUT NSN & PART NUMBER (P/N)________________________________________

MINIMUM QUANTITY: 65

MAXIMUM QUANTITY: 438

THE MAXIMUM QUANTITY INCLUDES 73 EACH RESERVED FOR FOREIGN MILITARY SALES (FMS). HOWEVER, IF NO FMS CUSTOMERS REQUIRE THIS ITEM, THE

UNITED STATES ARMY REQUIRE MAY UTILIZE THE FMS QUANTITY.

THE MINIMUM QUANTITY SET FORTH HEREIN SHALL BE OBLIGATED ON DELIVERY ORDER 0001, TO BE ISSUED SIMULTANEOUSLY WITH THE AWARD OF THE

CONTRACT. ANY ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE FIRM FIXED PRICE IN EFFECT DURING THE ORDERING PERIOD IN WHICH THEY

ARE ORDERED.

ALL ORDERING PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD.

ORDERING PERIODS ARE AS FOLLOWS:________________________________

THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 365 DAYS AFTER CONTRACT AWARD.

THE SECOND ORDERING PERIOD IS FROM 366 DAYS AFTER CONTRACT AWARD THROUGH 730 DAYS AFTER CONTRACT AWARD.

THE THIRD ORDERING PERIOD IS FROM 731 DAYS AFTER CONTRACT AWARD THROUGH 1095 DAYS AFTER CONTRACT AWARD.

THE FOURTH ORDERING PERIOD IS FROM 1096 DAYS AFTER CONTRACT AWARD THROUGH 1460 DAYS AFTER CONTRACT AWARD.

THE FIFTH ORDERING PERIOD IS FROM 1461 DAYS AFTER CONTRACT AWARD THROUGH 1825 DAYS AFTER CONTRACT AWARD.

PLEASE INSERT YOUR FIRM FIXED UNIT PRICE FOR THE 1st, 2nd, 3rd, 4th, and 5th YEAR IN THE SPACES PROVIDED UNDER EACH CLIN/SUBCLIN.

NOTE: THE OFFERORS ATTENTION IS CALLED TO THE PROCEDURES FOR RECEIPT OF REPARABLES WHICH FOLLOWS AND IS ALSO IN SECTION G.

2 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

AN ELECTRONIC COPY OF DD FORM 1348-1A FOR ALL SHIPMENTS OF REPARABLES SHALL BE FORWARDED TO 1) THE EMAIL ADDRESS IN BLOCK 9 ON PAGE 1 OF

THE BASIC CONTRACT/DELIVERY ORDER/MODIFICATION AND ALSO TO 2) usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil. THE DD FORM 1348-1A

SHALL ANNOTATE TO WHICH CONTRACT/DELIVERY ORDER THE ASSETS WILL BE APPLIED AS REPARABLES.

THE DD FORM 1348-1A GUIDANCE AS FOLLOWS:

A. MAINTAIN ANY RECEIPT DOCUMENTATION RECEIVED FROM THE DEPOTS

B. UPON RECEIPT OF MATERIAL, FILL IN BLOCK 10 TO INDICATE THE QUANTITY RECEIVED AND PROVIDE A SIGNATURE AND DATE ON THE DD FORM 1348-1A.

PRINTED NAMES, NAME/DATE STAMPS, AND INITIALS ARE NOT ACCEPTABLE.

C. IF A DD FORM 1348-1A IS NOT RECEIVED, A 1348-1A MUST BE CREATED WITH THE CORRESPONDING RECEIPT INFORMATION TO CONTAIN THE FOLLOWING:

I. UNIT OF ISSUE AND QUANTITY- (POSITIONS 23-29)

II. DOCUMENT NUMBER- (POSITIONS 30-43)

III. NATIONAL STOCK NUMBER (NSN)- (POSITIONS 8-22)

IV. CONDITION CODE- (POSITION 71)

V. UNIT PRICE- (POSITION 74-80

VI. TOTAL PRICE- (BLOCK 1)

VII. ACTUAL QUANTITY RECEIVED- (BLOCK 10)

VIII. NOMENCLATURE- (BLOCK 17)

IX. SIGNATURE AND DATE- (BLOCKS 22 AND 23)

D. COMPLETED 1348S SHOULD BE SENT TO THE FOLLOWING MAILBOX UPON RECEIPT OF MATERIAL:

USARMY.REDSTONE.USAMC.MBX.IMMC-SMBAMMO@MAIL.MIL

AN EXAMPLE OF A 1348-1A FILLED OUT CORRECTLY IS ATTACHED (SEE ATTACHMENT 0009).

ALL PROPOSALS/RESPONSES SHALL INCLUDE A SPECIAL TOOLING AND TEST EQUIPMENT SECTION THAT ADDRESSES THE CONTRACTOR'S PLAN TO MEET ALL

GOVERNMENT SPECIAL TOOLING AND TEST EQUIPMENT REQUIREMENTS WITH EITHER:

1. PHYSICAL POSSESSION OF THE REQUIRED TOOLS.

2. CONFIRMED REQUISITIONS FOR THE REQUIRED TOOLS.

3. CONFIRMED ARRANGEMENTS FOR SUBCONTRACTING THE PROCESSES REQUIRING THE SPECIAL TOOLS OR,

4. SPECIFIC PLANS DESCRIBING THEIR TECHNICAL APPROACH TO DEVELOP EQUIVALENT TOOLS.

SPECIAL TOOLS AND EQUIPMENT CAN BE FOUND IN TABLE 2-1 of DMWR 1-6130-296, DATED CHANGE #0.

THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF ODC IN DEPARTMENT OF

DEFENSE CONTRACTS AWARDED ON OR AFTER 01 JUNE 1993, UNLESS APPROPRIATE AUTHORITY IS GRANTED.

WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL AND

REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON COMPLETION

OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER WITH THE REPAIRED

ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.

THE CONTRACTOR SHALL REPORT PRODUCTION STATUS REQUIREMENTS IAW CDRL A001. THE FOLLOWING WEBSITES ARE PROVIDED FOR THE PURPOSE OF

OBTAINING/REVIEWING VARIOUS ARMY PUBLICATIONS AND TECHNICAL MANUALS/BULLETINS:

A. HTTPS://WWW.LOGSA.ARMY.MIL/ETMS/ONLINE.HTM - TECHNICAL MANUALS AND BULLETINS

B. HTTP://WWW.USAPA.ARMY.MIL - DA PAMPHLETS AND ARMY REGULATIONS

ELECTRONIC SUBMISSION OF PROPOSALS IS NOT AUTHORIZED. ___

PROPOSALS SHALL BE MAILED TO:

ARMY CONTRACTING COMMAND - REDSTONE

ATTN: ANDREW E. CAMERON

3 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CCAM-AL-M, BLDG 5303, 2nd FLOOR

REDSTONE ARSENAL, AL 35898-5280

COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: ________________________________

TELEPHONE NUMBER: ____________________

FAX NUMBER: __________________________

E-MAIL ADDRESS: ______________________

IF ANY OFFEROR CHOOSES TO HAND CARRY THEIR PROPOSAL, THE OFFEROR MUST REACH THE APPOINTED LOCATION (IDENTIFIED AS BUILDING 5303, 5300

MARTIN ROAD, REDSTONE ARSENAL, AL 35898, FOYER) BY THE DATE AND TIME AS STATED IN BLOCK 9 ON PAGE 1 OF THE SOLICITATION. PLEASE BE

ADVISED THAT REDSTONE ARSENAL IS A RESTRICTED FACILITY AND SHOULD AN OFFEROR CHOOSE TO HAND CARRY A PROPOSAL, A MINIMUM OF 72 HOURS

NOTICE TO THE CONTRACTING OFFICER IS REQUIRED IN ORDER TO ENSURE ACCESS BY THE CLOSING DATE/TIME OF THE SOLICITATION. ANY UNAUTHORIZED

ENTITY MUST BE IDENTIFIED AS HAVING A NEED, AS VALIDATED BY THE CONTRACTING OFFICER, IN ORDER TO GAIN ACCESS TO THE POST. THE

CONTRACTING OFFICE MUST NOTIFY THE GATE PERSONNEL, WHO MONITOR POST ACCESS, A MINIMUM OF 48 HOURS PRIOR TO AN ENTITY GAINING ENTRANCE TO

THE RESTRICTED POST. PLEASE NOT THAT ANY PROPOSALS DELIVERED LATE AS A RESULT OF FAILURE TO COMPLY WITH THE PROCEDURE WILL NOT BE

ACCEPTED, IAW FAR 52.215-1 ENTITLED "INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION".

*** END OF NARRATIVE A0001 ***

4 71

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN represents the Product Verification Audit

(PVA) for the Power Supply, output NSN: 6130-01-454-

8300, as shown in CLINs 0002AA, 0002AB, 0003AA, and

0003AB.

This is a Firm Fixed Price CLIN.

Offeror is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with The "Product

Verification Audit (PVA) Statement of Work".

PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the

Government Quality Office for scheduling of the PVA by email to the following address:

QS-Contracts@amrdec.army.mil

With copy emailed to the Contract Specialist at:

andrew.e.cameron.civ@mail.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.

NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:

U.S. Army Contracting Command - Redstone

Bldg 5303, 2nd Floor

ATTN: CCAM-AL-M, Andrew E. Cameron

Redstone Arsenal, Alabama 35898-5000 or emailed to:

andrew.e.cameron.civ@mail.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

5 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Failure to pass the PVA may lead to Termination for____________________________________________________

Default of the contract.________________________

Payment Instructions: The Contractor will go into_____________________

Wide Area Work Flow (WAWF) to receive payment for the

PVA. The Contractor shall use DODAAC W58H0Z when submitting the PVA invoice in WAWF, making it to the attention of Jeanie Clark. The Contracting Officer will approve the PVA invoice.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 POWER SUPPLY

NSN: 6130-01-454-8300

Mfr CAGE: 72914

Mfr Part Number: 60-3782-5

This requirement supports the AH-64 A, E. The minimum quantity to be issued as delivery order 0001 is 65 assets. At this time, the exact conditions and NSNs for these assets is unkown. Accordingly, the assets may apply to either of the US quantity CLINs (0002AA or 0002AB).

(End of narrative A001)

0002AA REPAIR/OVERHAUL/UPGRADE POWER SUPPLY (US) $ $ _________________________________________ ______________ __________________

COMMODITY NAME: POWER SUPPLY

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0002AA are:

Ordering Period 1: 33 each minimum qty

Ordering Period 2: 38 each estimated qty

Ordering Period 3: 38 each estimated qty

Ordering Period 4: 38 each estimated qty

Ordering Period 5: 38 each estimated qty

Funds for the ordering period 1 quantity set forth herein shall be obligated on delivery order

0001, to be issued simultaneously with the award

6 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

of the firm fixed price contract.

(End of narrative B001)

INPUT:

NSN: 6130-01-160-3520, P/N: 60-3782-50

OUTPUT:

NSN: 6130-01-454-8300, P/N: 60-3782-5

Repair/Overhaul/Upgrade shall be in accordance with the 'Statement of

Work/Specifications-Government

Specifications' found in section C.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to repair/ overhaul/ upgrade the input assets, as specified in Section C, Statement Of Work.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Min Qty 33 ea

YEAR 2- U/P $_____________ (FFP) Est Qty 38 ea

YEAR 3- U/P $_____________ (FFP) Est Qty 38 ea

YEAR 4- U/P $_____________ (FFP) Est Qty 38 ea

YEAR 5- U/P $_____________ (FFP) Est Qty 38 ea

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, M&O Packaging Requirements.

(End of narrative D001)

7 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the "Delivery Schedule" and "Delivery of

Additional Quantities," found in section F, for

Government Required Delivery Schedule.

(End of narrative F001)

0002AB REPAIR/OVERHAUL POWER SUPPLY (US) $ $ _________________________________ ______________ __________________

COMMODITY NAME: POWER SUPPLY

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0002AB are:

Ordering Period 1: 32 each minimum qty

Ordering Period 2: 37 each estimated qty

Ordering Period 3: 37 each estimated qty

Ordering Period 4: 37 each estimated qty

Ordering Period 5: 37 each estimated qty

Funds for the ordering period 1 quantity set forth herein shall be obligated on delivery order

0001, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative B001)

INPUT:

NSN: 6130-01-454-8300, P/N: 60-3782-5

OUTPUT:

NSN: 6130-01-454-8300, P/N: 60-3782-5

Repair/ Overhaul shall be in accordance with the 'Statement of Work/Specifications-

Government Specifications' found in section

C.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to repair/ overhaul the input assets, as specified in

Section C, Statement Of Work.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Min Qty 32 ea

8 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

YEAR 2- U/P $_____________ (FFP) Est Qty 37 ea

YEAR 3- U/P $_____________ (FFP) Est Qty 37 ea

YEAR 4- U/P $_____________ (FFP) Est Qty 37 ea

YEAR 5- U/P $_____________ (FFP) Est Qty 37 ea

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, M&O Packaging Requirements.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the "Delivery Schedule" and "Delivery of

Additional Quantities," found in section F, for

Government Required Delivery Schedule.

(End of narrative F001)

0003 POWER SUPPLY

NSN: 6130-01-454-8300

Mfr CAGE: 72914

Mfr Part Number: 60-3782-5

At this time, the exact number of FMS assets is unknown; however, the maximum quantity for FMS assets is 73 assets, and cannot be exceeded. Additionally, 9 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

the exact conditions and NSNs for the FMS assets is unkown. Accordingly, the assets may apply to either of the FMS quantity CLINs (0003AA or 0003AB).

(End of narrative A001)

0003AA REPAIR/OVERHAUL/UPGRADE POWER SUPPLY (FMS) $ $ __________________________________________ ______________ __________________

COMMODITY NAME: POWER SUPPLY

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0003AA are:

Ordering Period 1: 7 each estimated qty

Ordering Period 2: 8 each estimated qty

Ordering Period 3: 8 each estimated qty

Ordering Period 4: 8 each estimated qty

Ordering Period 5: 8 each estimated qty

This CLIN will be used only if a FMS Customer

Requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the

FMS quantity.

(End of narrative B001)

INPUT:

NSN: 6130-01-160-3520, P/N: 60-3782-50

OUTPUT:

NSN: 6130-01-454-8300, P/N: 60-3782-5

Repair/ Overhaul/ Upgrade shall be in accordance with the 'Statement of

Work/Specifications-Government

Specifications' in section C. Attached

Critical Characteristics apply.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to repair/ overhaul/ upgrade the input assets, as specified in Section C, Statement Of Work.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Est Qty 7 ea, FMS

YEAR 2- U/P $_____________ (FFP) Est Qty 8 ea, FMS

YEAR 3- U/P $_____________ (FFP) Est Qty 8 ea, FMS

10 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

YEAR 4- U/P $_____________ (FFP) Est Qty 8 ea, FMS

YEAR 5- U/P $_____________ (FFP) Est Qty 8 ea, FMS

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, M&O Packaging Requirements.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the "Delivery Schedule" and "Delivery of

Additional Quantities," found in section F, for

Government Required Delivery Schedule.

(End of narrative F001)

0003AB REPAIR/OVERHAUL POWER SUPPLY (FMS) $ $ __________________________________ ______________ __________________

COMMODITY NAME: POWER SUPPLY

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0003AB are:

Ordering Period 1: 6 each estimated qty

Ordering Period 2: 7 each estimated qty

Ordering Period 3: 7 each estimated qty

Ordering Period 4: 7 each estimated qty

Ordering Period 5: 7 each estimated qty

This CLIN will be used only if a FMS Customer

Requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the

11 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

FMS quantity.

(End of narrative B001)

INPUT:

NSN: 6130-01-454-8300, P/N: 60-3782-5

OUTPUT:

NSN: 6130-01-454-8300, P/N: 60-3782-5

Repair/ Overhaul shall be in accordance with the 'Statement of Work/Specifications-

Government Specifications' in section C.

Attached Critical Characteristics apply.

This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to repair/ overhaul the input assets, as specified in

Section C, Statement Of Work.

OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT

PRICE:

YEAR 1- U/P $_____________ (FFP) Est Qty 6 ea, FMS

YEAR 2- U/P $_____________ (FFP) Est Qty 7 ea, FMS

YEAR 3- U/P $_____________ (FFP) Est Qty 7 ea, FMS

YEAR 4- U/P $_____________ (FFP) Est Qty 7 ea, FMS

YEAR 5- U/P $_____________ (FFP) Est Qty 7 ea, FMS

INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS

CLIN.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, M&O Packaging Requirements.

(End of narrative D001)

12 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to the "Delivery Schedule" and "Delivery of

Additional Quantities," found in section F, for

Government Required Delivery Schedule.

(End of narrative F001)

0004 SCRAP

0004AA SCRAP $ ______ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for assets which are beyond economical repair (i.e., scrap) from CLINs

0002AA, 0002AB, 0003AA, and/or 0003AB.

The Government's estimated quantity per ordering period is 10 each.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

Ordering Period 3 $____________ EACH

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

Scrapped assets from CLINs 0002AA, 0002AB, 0003AA, and/or 0003AB, shall be in accordance with Section C, entitled Statement of Work

Specifications - Government Specifications.

Units determined to be scrapped in accordance with Section C shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA, 0002AB, 0003AA, and/or 0003AB, as applicable.

In the event the Procuring Contracting Officer

(PCO) determines that certain items shall be

13 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.

The Government may, at it's discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0005 CONTAINERS

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for contractor furnished containers for CLINs 0002AA, 0002AB, 0003AA, and/or 0003AB.

P/N: 13414-038

NSN: 8145-00-485-8256

The Government estimates that a quantitiy of 10

EACH will be required for each of the ordering periods.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

Ordering Period 3 $____________ EACH

14 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

The contractor shall provide the container in accordance with Attachment 0001 - M&O Packaging

Requirements and Section C, entitled Statement of Work/Specifications - Government

Specificationsand reusable containers.

The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.

The Contractor, IAW Section C Statement of Work, shall submit a Report of Discrepancy (ROD) SF

Form 364 through the DCMA QAR for verification within 7 working days to the address shown on

Data Item A002. Assets received in W58RGZ-16-R-

0143 with an unserviceable container, or without a container, require prior approval of the PCO before containers can be purchased.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0006 CONTRACTS DATA REQUIREMENTS LIST (CDRLS) ________________________________________

This CLIN is "Not Separately Priced" (NSP). Pricing for data shall be included in the unit prices of

CLINs 0002AA, 0002AB, 0003AA, and 0003AB.

The Contractor shall provide Data Items A001 - A003 in accordance with the Contract Data Requirements

List, Exhibits A, B, C.

(End of narrative A001)

A001 CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT $ ** NSP ** __________________________________________________ __________________

SERVICE REQUESTED: DATA ITEM A001

DATA ITEM A001 - DATA ACQUISITION DOCUMENT NUMBER :

15 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DI-PSSS-81995

Date of first submission is 5 working days after receipt of reparables.

Frequency of submission is monthly.

Data shall be prepared in accordance with Attachment

0005, Template for Depot Maintenance Production

Report, and submitted to the following email addresses:

usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

(End of narrative C001)

Deliveries or Performance _________________________

A002 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________

DISCREPANCY $ ** NSP ** ___________ __________________

SERVICE REQUESTED: DATA ITEM A002

DATA ITEM A002 - DATA ACQUISITION DOCUMENT NUMBER :

DI-MGMT-80503 (AS REQUIRED)

Submission of the Report of Shipping and Packaging

Discrepancy shall occur within 10 days of discovering the discrepancy. Refer to attachments

0003 (Standard Form 364) and 0004 (Report of

Discrepancy Guidance) for completing the Report of

Discrepancy.

(End of narrative C001)

Deliveries or Performance _________________________

A003 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________

SERVICE REQUESTED: DATA ITEM A003

DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER :

DI-QCIC-80736 (AS REQUIRED)

No report is necessary unless there is a deficiency.

Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.

16 71

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative C001)

Deliveries or Performance _________________________

17 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C-1 Statement of Work/Specifications Government Specifications

a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and repair/overhaul/upgrade for Power Supply that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the repair/overhaul/upgrade, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s)specified in each individual delivery order.

b. Prior to commencement of repair/overhaul/upgrade, the Contractor shall disassemble and inspect the item to the extent necessary to determine the complete cost to repair/overhaul/upgrade. At this time, the exact conditions of the assets are unknown, and the quantities listed under the initial orders will be estimates. The Contractor shall inform the Government, via RODs, the quantities applicable to each CLIN after the initial inspection is complete. The Contractor shall continue the repair/overhaul/upgrade process on all end items when the total cost to repair/overhaul/upgrade does not exceed $6,245.62. The repair/overhaul/upgrade line items shown in section B are firm-fixed price. The contractor will be required to complete the repair/overhaul/upgrade on all end items regardless of the damage as long as the total contractor cost to repair/overhaul/upgrade does not exceed $6,245.62. The contractor will be required to provide data other than certified cost and pricing data and a report of discrepancy signed by the DCMA QAR to the Procuring Contracting

Officer (PCO) to confirm the total cost to repair/overhaul/upgrade will exceed $6,245.62. This data will include at minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A, and profit rate. More information to support the contractor's price may be requested by the Government. In no event will an asset be scrapped prior to an approved modification by the Contracting Officer. No additional funding except for missing parts will be provided to the contractor to complete the repair/overhaul/upgrade of the end item. The firm fixed prices in the repair/overhaul/upgrade CLINs must include/cover all mandatory and non-mandatory parts as required by the Depot Maintenance Work Requirement (DMWR). The Government cannot guarantee the condition of the assets sent to the Contractor for repair/overhaul/upgrade.

c. In the event that the total contractor cost to repair/overhaul/upgrade is determined (approved by PCO) to exceed $6,245.62, the contractor shall scrap such assets at the fixed unit price in CLIN 0004AA of section B hereof and make disposition in accordance with

(IAW) the contractor's approved Government property procedures. Such scrapped items shall count toward the minimum quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity. Any item other than those determined to be scrapped must be repaired/upgraded at the firm fixed price in the awarded contract.

d. Repair/overhaul/upgrade shall be accomplished IAW Depot Maintenance Work Requirement (DMWR)1-6130-296, Dated

01/24/2007, Revision #0, and Maintenance Engineering Orders C4598, C4659D, C6372, C6664, C6702, C6980, C7123.

e. Critical Safety Item: N/A

f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.

g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental

Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-

23, w/chg 12, Painting and Marking of Army Aircraft.

h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit A. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.

i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with the PVA SOW found in section E of the solicitation/contract.

j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall complete the forms and records as specified in DA PAM 738-751.

k. Serial Number Report Requirement (SNRR): N/A

l. The items the Contractor shall repair are identified below:

Input NSN P/N

6130-01-160-3520 60-3782-50

18 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

6130-01-454-8300 60-3782-5

Output NSN P/N

6130-01-454-8300 60-3782-5

m. The repair/overhaul/upgrade planned quantity for 5 years is minimum 65, maximum 438. Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to W25G1U.

n. Inventory Transactions - The contractor shall prepare the following reports:

- The contractor prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995.

- The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508 and DD

Form 1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22

(signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

http://www.acq.osd.mil/dpap/ccap/cc/jcchb/files/formspubsregs/dod_funding_documents/dd13481a.pdf

The contractor shall prepare this data to include the following corresponding receipt information:

A. National Stock Number (NSN) - (Positions 8-22)

B. Condition Code - (Position 71)

C. Unit Price - (Positions 74-80)

D. Total Price - (Block 1)

E. Actual Quantity Received - (Block 10)

F. Nomenclature - (Block 17)

G. Signature and Date - (Blocks 22 and 23)

If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

o. Reserved

p. Reserved.

q. The Government reserves the right to replace any items scrapped.

r. Overhaul Repair Report: N/A

s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736.

t. Supplier Interface and Oversight: N/A

u. Shipping Containers NSN: 8145-00-485-8256, P/N: 13414-038 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.

*** END OF NARRATIVE C0001 ***

19 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D-1 BAR CODE MARKINGS

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

*** END OF NARRATIVE D0001 ***

20 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996

E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2000 or equivalent; any equivalent must be approved prior to contract award.

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E-5 PVA SOW

Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.

(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract.

This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the

AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from

AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the

"Changes" clause of the contract.

(b) The Contractor shall:

(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.

(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN: QS-

Contracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United

States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.

(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.

(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC

PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to

21 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.

(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.

(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance

Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.

(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work

Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.

(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.

(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government aceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.

(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.

(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the

PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.

Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.

(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.

1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.

2. Minor: In the event a minor defect is discovered, the following actions shall be taken:

a. The contractor shall isolate the cause of the defect and initiate corrective actions.

b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.

c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.

3. Major: In the event a major defect is discovered, the following actions shall be taken:

a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.

b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.

c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, 22 71

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

and initiate corrective action to address those units at no additional cost to AMCOM.

d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.

e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.

f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.

4. Critical: In the event a critical defect is discovered, the following actions shall be taken:

a. All actions outlined in paragraph 3 above…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .