MAINTENANCE ENGINEERING ORDER

(AMCOM Reg 750-2)

MEO NO.

DATE PAGE 1 of

TITLE Tolerances

Unless otherwise noted, dimensions are in inches and tolerances are:

Fractional………..…….+/- 1/32 Decimal……….………..+/- .010 Angular…………+/- ½ degrees

APPLICABILITY

INTERIM USE OF THIS MEO IS AUTHORIZED UNTIL

AFFECTED DOCUMENT IS UPDATED.

CSI Critical Characteristic Affected?

Impact Statement Attached:

REFERENCES FOR RDECOM USE ONLY

DOCUMENT(S) AFFECTED

DOCUMENT CHANGE IS REQUIRED

PURPOSE OR PROBLEM

PROJECT ENGINEER ENGINEERING REVIEW ENGINEERING RELEASE

PUBLICATION CHANGE REQUEST: REQUEST THAT THE FOLLOWING DATA BE INCLUDED IN THE NEXT CHANGE OR

REVISION TO THE PUBLICATION IDENTIFIED ABOVE.

WP

NO.

PAGE

NO.

PARA-

GRAPH

FIGURE/

TABLE

NO.

CHANGES

(EXACT WORDING OF CHANGE MUST BE GIVEN)

MED FORM 15-DEC-09 1401-R-E

C7123 Jun 2, 2011 1

Power Supply PN 60-3782-5

NO

✔ YES

DMWR 1-6130-296 dated 24 Jan 2007

UH-60EE DAA

TN 97019

Tech data correction

Dinh Luu Jerry Forsythe Ron Walterick

3-2 3-9.e.

and 3-9.i.

Change to read:

"If lamp voltage is value calculated in step b. within +/-1 volt and flashes are 60-80 fpm, go to next step. If not, discontinue testing and overhaul power supply".

RDMR-AEM

MEMORANDUM FOR RECORD:

SUBJECT: Impact of AED Maintenance Engineering Order (MEO) on maintenance using , dated , affecting system:

1. Enclosed MEO will be issued by this office and is provided as part of our Technical Data user support mission. This MEO may impact maintenance contracts or repair parts acquisition decisions.

2. OVERALL IMPACT:

3. CLASSIFICATION:

New / Revised Procedure / Process Illustrated Parts Breakdown (IPB) Change

Technical Requirement Clarification Repairable Bill of Materials (RBOM) Impact

Suggestion Study / Test Results Critical Safety Item (CSI) Review

Parts Marking Implementation / Update Environmental Review

MEO Review (Chg. / Rev. Driven) Other

4. CRITICAL CHARACTERISTIC(S) AFFECTED:

Dimension / Tolerance Finish / Material Process / Procedure None

5. READINESS IMPACT:

Testing Required Special Tooling Special Process

Part / Material Logistics Impact Inspection(s) Required None

6. MATERIAL IMPACT:

More Less None Unknown Cost / Usage

Labor / Processing Parts / Materials Affected:

7. COMMENTS:

8. Point of contact for this action is

DMWR 1-6130-296

C7123

C7123

24 Jan 2007 UH-60

No Significant Airworthiness Impact-Implement per standard procedures

Tech data correction

Dinh Luu, dinh.luu@us.army.mil; phone (361) 961-3353