ExhibitACDRLsRevD07Oct2015.PDF

PDF 3 MB Posted

Attached to
GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS
Solicitation number
W58RGZ15R0070
Issued by

About this file

Exhibit A CDRLs Revised 07 Oct 2015

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07 OCTOBER 15

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Improved Turbine Engine W58RGZ-XX-C-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 Program Progress Report Technical Status and Progress Reports

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80555A PWS Para 3.1 SFAE-AV-FVL-T NSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION IN

LT MTHLY 30DAC b. COPIES SECT. B

8. APP CODE D

SEE BLOCK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

A N/A SEE BLOCK 16 Reg Repro

16. REMARKS:

Block 8: The Government will have 10 days to review and approve/disapprove with comments.

If disapproved, the Contractor shall correct and resubmit within 5 days of notification.

Block 9: See Enclosure 1

Block 13: Subsequent submissions shall be delivered every 30 days after initial submission.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRL-

Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to

CDRL-Express. Notification of delivery shall be made to fvl.datamanager@peoavn.army.mil.

The Contractor shall deliver via TopVue.

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation

ITE/FVL Project Office 5304 Patton Road

Bldg. 5304, 1st floor

Attn: SFAE-AV-FVL-T (Data Manager) Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information:

Document Number, Document Revision, Document Date, Contract, Delivery Order, and

CDRL.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

https://topvue.peoavn.army.mil/topvue-uh https://safe.amrdec.army.mil/

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Improved Turbine Engine W58RGZ-XX-C-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003-001 Briefing Materials Post Award Conference Agenda and Briefing

Materials

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81605 PWS Para 3.1.1.1 SFAE-AV-FVL-T NSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION IN

LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES SECT. B

8. APP CODE D

SEE BLOCK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

A N/A SEE BLOCK 16 Reg Repro

16. REMARKS:

Block 8: The Government will have 10 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 5 days after notification.

Block 9: See Enclosure 1

Blocks 10, 12, 13: Post Award Conference briefing materials shall be delivered 20 days prior to the Post Award Conference. Updated briefing charts shall be delivered 14 days after the Post Award Conference.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRL- Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via

AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to

CDRL-Express. Notification of delivery shall be made to fvl.datamanager@peoavn.army.mil.

The Contractor shall deliver via TopVue.

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation

ITE/FVL Project Office

5304 Patton Road Bldg. 5304, 1st floor

Attn: SFAE-AV-FVL-T (Data Manager)

Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information:

Document Number, Document Revision, Document Date, Contract, Delivery Order, and

CDRL.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-

4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Improved Turbine Engine Program W58RGZ-XX-D-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003-002 Report, Record of Meeting/Minutes Post Award Conference Minutes and Action Items

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81505 PWS Para 3.1.1.1 SFAE-AV-FVL-T

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES

8. APP CODE D

SEE BLOCK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

N/A N/A SEE BLOCK 16

Reg Repro

16. REMARKS:

Block 9: See Enclosure 1

Block 10, 12, 13: Meeting minutes and actions shall be delivered 5 days after Post Award Conference.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRLExpress (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via AMRDEC

SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to CDRLExpress. Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation

ITE/FVL Project Office 5304 Patton Road

Bldg. 5304, 1st floor

Attn: ITE/FVL Data Manager

The Contractor shall mark all technical documentation with the following information: Document Number, Document Revision, Document Date, Contract, Delivery Order, and CDRL.

SEE BLOCK 16 1 0

15. TOTAL 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Eric Martin 20 Jan 2013

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Improved Turbine Engine W58RGZ-XX-C-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003-003 Briefing Material Integrated Program Reviews (IPR) Agenda &

Briefing Materials

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81605 PWS Para 3.1.1.2 SFAE-AV-FVL-T NSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION IN

LT SEE BLOCK

SEE BLOCK 16 b. COPIES SECT. B

8. APP CODE D

SEE BLOCK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

A NA SEE BLOCK 16 Reg Repro

16. REMARKS:

Block 8: The Government will have 10 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 5 days after notification.

Block 9: See Enclosure 1

Blocks 10, 12, 13: IPR briefing materials shall be delivered 20 days prior to each IPR session. Updated briefing charts shall be delivered 14 days after each IPR.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRL- Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via

AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to

CDRL-Express. Notification of delivery shall be made to fvl.datamanager@peoavn.army.mil.

The Contractor shall deliver via TopVue.

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation

ITE/FVL Project Office

5304 Patton Road Bldg. 5304, 1st floor

Attn: SFAE-AV-FVL-T (Data Manager)

Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information:

Document Number, Document Revision, Document Date, Contract, Delivery Order, and

CDRL.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-

4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Improved Turbine Engine Program W58RGZ-XX-D-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003-004 Report, Record of Meeting/Minutes Integrated Program Reviews (IPR) Minutes and

Action Items

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81505 PWS Para 3.1.1.2 SFAE-AV-FVL-T

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES

8. APP CODE D

SEE BLOCK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

N/A N/A SEE BLOCK 16

Reg Repro

16. REMARKS:

Block 9: See Enclosure 1

Block 10, 12, 13: Meeting minutes and actions shall be delivered 5 days after IPR.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRLExpress

(https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via AMRDEC

SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to CDRLExpress. Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation ITE/FVL Project Office

5304 Patton Road

Bldg. 5304, 1st floor Attn: ITE/FVL Data Manager

The Contractor shall mark all technical documentation with the following information: Document

Number, Document Revision, Document Date, Contract, Delivery Order, and CDRL.

SEE BLOCK 16 1 0

15. TOTAL 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Eric Martin 20 Jan 2013

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Improved Turbine Engine W58RGZ-XX-C-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003-005 Briefing Material Integrated Baseline Review (IBR) Agenda &

Briefing Materials

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81605 PWS Para 3.1.1.3 SFAE-AV-FVL-T NSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION IN

LT SEE BLOCK

SEE BLOCK 16 b. COPIES SECT. B

8. APP CODE D

SEE BLOCK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

A N/A SEE BLOCK 16 Reg Repro

16. REMARKS:

Block 8: The Government will have 10 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 5 days after notification.

Block 9: See Enclosure 1

Blocks 10, 12, 13: IBR agenda & briefing materials shall be delivered 30 days prior to each IBR session. Updated briefing charts shall be delivered 14 days after each IBR.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRL- Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via

AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to

CDRL-Express. Notification of delivery shall be made to fvl.datamanager@peoavn.army.mil.

The Contractor shall deliver via TopVue.

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation

ITE/FVL Project Office

5304 Patton Road Bldg. 5304, 1st floor

Attn: SFAE-AV-FVL-T (Data Manager)

Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information:

Document Number, Document Revision, Document Date, Contract, Delivery Order, and

CDRL.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-

4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Improved Turbine Engine Program W58RGZ-XX-D-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003-006 Report, Record of Meeting/Minutes Integrated Baseline Review (IBR) Minutes and action items

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81505 PWS Para 3.1.1.3 SFAE-AV-FVL-T

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES

8. APP CODE D

SEE BLOCK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

N/A N/A SEE BLOCK 16

Reg Repro

16. REMARKS:

Block 9: See Enclosure 1

Block 10, 12, 13: Meeting minutes and actions shall be delivered 5 days after IBR.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRLExpress

(https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via AMRDEC

SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to CDRLExpress. Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation ITE/FVL Project Office

5304 Patton Road

Bldg. 5304, 1st floor Attn: ITE/FVL Data Manager

The Contractor shall mark all technical documentation with the following information: Document

Number, Document Revision, Document Date, Contract, Delivery Order, and CDRL.

SEE BLOCK 16 1 0

15. TOTAL 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Eric Martin 20 Jan 2013

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction

Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM ____ OTHER ___ MGMT____

D. SYSTEM/ITEM

Improved Turbine Engine Program

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO

A004

2. TITLE OF DATA ITEM

Contract Work Breakdown Structure (CWBS) Indexes and

Dictionaries

3. SUBTITLE

CONTRACT WORK BREAKDOWN

STRUCTURE (CWBS)

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.)

DI-MGMT-81334D

5. CONTRACT REFERENCE

PWS Para 3.1.3

6. REQUIRING OFFICE

SFAE-AV-FVL-T

7. DD250 REQ

LT

9. DIST. STATEMENT

REQUIRED

D

SEE BLOCK 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

DRAFT

FINAL

Reg Repro

Block 16:

Contractor Cost Data Reporting (CCDR) requirements contained in their prime contracts shall be flowed to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to Defense Cost and Resource Center (DCARC). The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract

CWBS Indexes and Dictionaries for submission to the DCARC for Deputy Director Cost Assessment

(DDCA) approval using the Cost and Software Data Reporting (CSDR) Submit-Review System. The Prime Contractor shall be responsible for ensuring reporting subcontractors provide copies of submittals to the ITE/FVL Project Office.

Block 8: The Government will have 45 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 30 days after notification of comments.

Block 9: See Enclosure 1

Blocks 10, 11, 12, 13: All deliveries shall coincide with approved CSDR plan shown in contract Appendix C, Attachment B.

Block 14: All CWBS Indexes and Dictionaries shall be submitted electronically using the CSDR

Submit-Review System. The CWBS Index must be submitted in Microsoft Excel format and shall map to the Office of the Secretary of Defense (OSD) Cost Analysis and Program Evaluation (CAPE) approved CSDR Plan. The CWBS Dictionary must be submitted in Microsoft Word compatible files.

Data submitters must register through the DCARC website and possess a DoD-issued CAC or DoD-approved ECA digital certificate to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. In addition to direct DCARC reporting, the Contractor shall electronically deliver the data to the

Government via CDRL-Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to CDRL-Express

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation ITE/FVL Project Office

5304 Patton Road

Bldg. 5304, 1st floor Attn: SFAE-AV-FVL-T (Data Manager)

Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information: Document

Number, Document Revision, Document Date, Contract, Delivery Order, and CDRL.

DCARC 1 1 0

SFAE-AV-

FVL-T

1 1 0

See Block 16

15. TOTAL 2 2

G. PREPARED BY

Kathy Thomas

H. DATE I. APPROVED BY

Rick Hubert

J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Improved Turbine Engine W58RGZ-XX-C-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A006 Technical Report – Study/Services Cost Account Manager (CAM)

Notebooks

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B PWS Para 3.1.5 SFAE-AV-FVL-T NSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION IN

LT SEE BLOCK

SEE BLOCK 16 b. COPIES SECT. B

8. APP CODE D

SEE BLOCK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

A N/A SEE BLOCK 16 Reg Repro

16. REMARKS:

Block 8: The Government will have 10 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 5 days after notification.

Block 9: See Enclosure 1

Blocks 10, 12, 13: Two CAM notebooks shall be delivered via hard copy and one electronic copy 30 days prior to IBR. Subsequent updates shall be delivered at 9 months and 15 months after contract award.

Block 14: The Contractor shall deliver the electronic version of the CAM notebook the

Government via CDRL-Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over

50MB shall be delivered via AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to CDRL-Express. Notification of delivery shall be made to fvl.datamanager@peoavn.army.mil. The Contractor shall deliver via TopVue.

Hard copies and files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation ITE/FVL Project Office

5304 Patton Road

Bldg. 5304, 1st floor Attn: SFAE-AV-FVL-T (Data Manager)

Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information:

Document Number, Document Revision, Document Date, Contract, Delivery Order, and

CDRL.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of

Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR

No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM ____ OTHER ___ MGMT____

D. SYSTEM/ITEM

Improved Turbine Engine Program

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO

A007

2. TITLE OF DATA ITEM

Integrated Program Management Report (IPMR)

3. SUBTITLE

Integrated Program Management Report (IPMR)

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81861

5. CONTRACT REFERENCE

PWS Para 3.1.5

6. REQUIRING OFFICE

SFAE-AV-FVL-T

7. DD250 REQ

LT

9. DIST. STATEMENT

REQUIRED

D

SEE BLOCK 16

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

60 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

5 DARP

DRAFT

FINAL

Reg Repro

16. REMARKS:

IMPR data shall be prepared in electronic format. IPMR data shall be traceable to the approved DCARC

CWBS DI-MGMT-81334D. Prime contractors shall be responsible for flowing down IPMR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds.

The Integrated Master Schedule shall be delivered in Microsoft Project format unless another format has been previously approved by the Government.

Block 8: The Government will have 10 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 10 days after notification.

Block 9: See Enclosure 1

Block 14: IPMR related forms shall be electronically forwarded to the central repository at the DCARC Web site at https://ders.dcarc.pae.osd.mil/DCARCPortal/ and electronically delivered to the Government via CDRL-Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via

AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to CDRL-Express.

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation

ITE/FVL Project Office

5304 Patton Road

BLDG. 5304, 1st Floor Attn: ITE/FVL Data Manager

Redstone Arsenal Al 35898-5000

The Contractor shall mark all technical documentation with the following information: Document

Number, Document Revision, Document Date, Contract, Delivery Order, and CDRL.

DCARC 1 0

SFAE-AV-FVL-T 1 0

See Block 16

15. TOTAL 2

G. PREPARED BY

Kathy Thomas

H. DATE I. APPROVED BY

Rick Hubert

J. DATE

https://ders.dcarc.pae.osd.mil/DCARCPortal/

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Improved Turbine Engine W58RGZ-XX-C-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A008 Technical Report – Study/Services Cost Forecasting

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B PWS Para 3.1.7 SFAE-AV-FVL-T NSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION IN

LT QTRLY 90 DAC b. COPIES SECT. B

8. APP CODE D

SEE BLOCK 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

A NA SEE BLK 16 Reg Repro

16. REMARKS:

Report shall be delivered in Microsoft Word format.

Block 8: The Government will have 45 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 30 days after notification.

Block 9: See Enclosure 1

Block 10,12,13: The Contractor shall deliver the production cost forecasting data report 30 days prior to the engine system PDR.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRL-

Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via

AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to CDRL-Express. Notification of delivery shall be made to fvl.datamanager@peoavn.army.mil.

The Contractor shall deliver via TopVue.

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation

ITE/FVL Project Office

5304 Patton Road Bldg. 5304, 1st floor

Attn: SFAE-AV-FVL-T (Data Manager)

Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information:

Document Number, Document Revision, Document Date, Contract, Delivery Order, and

CDRL.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis

Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM ____ OTHER ___ MGMT____

D. SYSTEM/ITEM

Improved Turbine Engine Program

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO

A009

2. TITLE OF DATA ITEM

Contract Funds Status Report (CFSR)

3. SUBTITLE

Contract Funds Status Reports

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81468

5. CONTRACT REFERENCE

PWS Para. 3.1.8.1

6. REQUIRING OFFICE

SFAE-AV-FVL-T

7. DD250 REQ

LT

9. DIST. STATEMENT

REQUIRED

D

SEE BLOCK 16

10. FREQUENCY

QRTLY

12. DATE OF FIRST SUBMISSION

30 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

DRAFT

FINAL

Reg Repro

Block 16:

Prime contractors are responsible for flowing down CFSR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds.

Block 8: The Government will have 45 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 30 days after notification.

Block 9: See Enclosure 1

Block 13: Quarterly submissions shall be delivered on the day the quarter has ended.

Block 14: The CFSR must be submitted in Microsoft Excel-compatible files. Data submitters must register through the DCARC website and possess a DoD-issued CAC or DoD-approved ECA digital certificate to obtain a DCARC Portal account and be authorized to upload. In addition to direct DCARC reporting, the Contractor shall electronically deliver the data to the Government via CDRL-Express

(https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to CDRL-Express

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation ITE/FVL Project Office

5304 Patton Road

Bldg. 5304, 1st floor Attn: SFAE-AV-FVL-T (Data Manager)

Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information: Document

Number, Document Revision, Document Date, Contract, Delivery Order, and CDRL.

DCARC 1 0

SFAE-AV-

FVL-T

1 0

See Block 16

15. TOTAL 2

G. PREPARED BY

Kathy Thomas

H. DATE I. APPROVED BY

Rick Hubert

J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis

Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM ____ OTHER ___ FNCL ____

D. SYSTEM/ITEM

Improved Turbine Engine Program

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO

A010

2. TITLE OF DATA ITEM

Cost Data Summary Report (DD Form 1921)

3. SUBTITLE

Contractor Cost Data Reporting

(CCDR)

4. AUTHORITY (Data Acquisition Document No.)

DI-FNCL-81565C

5. CONTRACT REFERENCE

PWS Para. 3.1.8.2

6. REQUIRING OFFICE

SFAE-AV-FVL-T

7. DD250 REQ

LT

9. DIST. STATEMENT

REQUIRED

D

SEE BLOCK 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

DRAFT

FINAL

Reg Repro

Block 16:

Contractor Cost Data Reporting (CCDR) requirements contained in their prime contracts shall be flowed to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to Defense Cost and Resource Center (DCARC). The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract

Cost Data Summary Reports for submission to the DCARC for Deputy Director Cost Assessment

(DDCA) approval using the Cost and Software Data Reporting (CSDR) Submit-Review System. The Prime Contractor shall be responsible for ensuring reporting subcontractors provide copies of submittals to the ITE/FVL Project Office.

Block 8: The Government will have 45 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 30 days after notification.

Block 9: See Enclosure 1

Blocks 10, 11, 12, 13: All deliveries shall coincide with approved CSDR plan shown in PWS Appendix C ,Attachment B.

Block 14: Cost Data Summary Reports shall be submitted electronically using the CSDR Submit-

Review System. The Cost Data Summary Reports must be submitted in Microsoft Excel-compatible files. Data submitters must register through the DCARC website and possess a DoD-issued CAC or

DoD-approved ECA digital certificate to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. In addition to direct DCARC reporting, the Contractor shall electronically deliver the data to the

Government via CDRL-Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to CDRL-Express

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation ITE/FVL Project Office

5304 Patton Road

Bldg. 5304, 1st floor Attn: SFAE-AV-FVL-T (Data Manager)

Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information: Document

Number, Document Revision, Document Date, Contract, Delivery Order, and CDRL.

DCARC 1 0

SFAE-AV-

FVL-T

1 0

See Block 16

15. TOTAL 2

G. PREPARED BY

Kathy Thomas

H. DATE I. APPROVED BY

Rick Hubert

J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis

Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM ____ OTHER ___ FNCL ____

D. SYSTEM/ITEM

Improved Turbine Engine Program

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO

A011

2. TITLE OF DATA ITEM

Functional Cost-Hour Report

(DD Form 1921-1)

3. SUBTITLE

Contractor Cost Data Reporting

(CCDR)

4. AUTHORITY (Data Acquisition Document No.)

DI-FNCL-81566C

5. CONTRACT REFERENCE

PWS Para. 3.1.8.2

6. REQUIRING OFFICE

SFAE-AV-FVL-T

7. DD250 REQ

LT

9. DIST. STATEMENT

REQUIRED

D

SEE BLOCK 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

DRAFT

FINAL

Reg Repro

Block 16:

Contractor Cost Data Reporting (CCDR) requirements contained in their prime contracts shall be flowed to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to Defense Cost and Resource Center (DCARC). The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract

Functional Cost-Hour Reports for submission to the DCARC for Deputy Director Cost Assessment

(DDCA) approval using the Cost and Software Data Reporting (CSDR) Submit-Review System. The Prime Contractor shall be responsible for ensuring reporting subcontractors provide copies of submittals to the ITE/FVL Project Office.

Block 8: The Government will have 45 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 30 days after notification.

Block 9: See Enclosure 1

Blocks 10, 11, 12, 13: All deliveries shall coincide with approved CSDR plan shown in PWS Appendix C, Attachment B.

Block 14: Functional Cost-Hour Reports shall be submitted electronically using the CSDR Submit-

Review System. The Functional Cost-Hour Reports must be submitted in Microsoft Excel-compatible files. Data submitters must register through the DCARC website and possess a DoD-issued CAC or

DoD-approved ECA digital certificate to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. In addition to direct DCARC reporting, the Contractor shall electronically deliver the data to the

Government via CDRL-Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to CDRL-Express

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation ITE/FVL Project Office

5304 Patton Road

Bldg. 5304, 1st floor Attn: SFAE-AV-FVL-T (Data Manager)

Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information: Document

Number, Document Revision, Document Date, Contract, Delivery Order, and CDRL.

DCARC 1 0

SFAE-AV-

FVL-T

1 0

See Block 16

15. TOTAL 2

G. PREPARED BY

Kathy Thomas

H. DATE I. APPROVED BY

Rick Hubert

J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis

Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM ____ OTHER ___ FNCL ___

D. SYSTEM/ITEM

Improved Turbine Engine Program

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO

A013

2. TITLE OF DATA ITEM

Contractor Business Data Report

(DD Form 1921-3)

3. SUBTITLE

Contractor Cost Data Reporting (CCDR)

4. AUTHORITY (Data Acquisition Document No.)

DI-FNCL-81765B

5. CONTRACT REFERENCE

PWS Para. 3.1.8.3

6. REQUIRING OFFICE

SFAE-AV-FVL-T

7. DD250 REQ

LT

9. DIST. STATEMENT

REQUIRED

D

SEE BLOCK 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

DRAFT

FINAL

Reg Repro

Block 16:

Contractor Cost Data Reporting (CCDR) requirements contained in their prime contracts shall be flowed to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to Defense Cost and Resource Center (DCARC). The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract

Contractor Business Data Reports for submission to the DCARC for Deputy Director Cost Assessment

(DDCA) approval using the Cost and Software Data Reporting (CSDR) Submit-Review System. The Prime Contractor shall be responsible for ensuring reporting subcontractors provide copies of submittals to the ITE/FVL PROJECT OFFICE.

Block 8: The Government will have 45 days after receipt to review and approve/disapprove with comments. If disapproved, the Contractor shall resubmit within 30 days after notification.

Block 9: See Enclosure 1

Blocks 10, 11, 12, 13: All deliveries shall coincide with approved CSDR plan shown in PWS Appendix C, Attachment B.

Block 14: Contractor Business Data Reports shall be submitted electronically using the CSDR Submit- Review System. The Contractor Business Data Reports must be submitted in Microsoft Excel-compatible files. Data submitters must register through the DCARC website and possess a DoD-issued CAC or DoD-approved ECA digital certificate to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. In addition to direct DCARC reporting, the Contractor shall electronically deliver the data to the

Government via CDRL-Express (https://topvue.peoavn.army.mil/topvue-fvl). Files over 50MB shall be delivered via AMRDEC SAFE (https://safe.amrdec.army.mil) with the notification letter uploaded to

CDRL-Express

Files that cannot be transmitted electronically shall be mailed to the following address:

Program Executive Office, Aviation

ITE/FVL Project Office

5304 Patton Road Bldg. 5304, 1st floor

Attn: SFAE-AV-FVL-T (Data Manager)

Redstone Arsenal, AL 35898-5000

The Contractor shall mark all technical documentation with the following information: Document

Number, Document Revision, Document Date, Contract, Delivery Order, and CDRL.

DCARC 1 0

SFAE-AV-

FVL-T

1 0

See Block 16

15. TOTAL 2

G. PREPARED BY

Kathy Thomas

H. DATE I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Improved Turbine Engine W58RGZ-XX-C-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .