The file is a pricing spreadsheet for the Aberdeen Proving Ground Forest Management Support Services contract, covering a base year and four option years plus a 6-month option period. The comprehensive line item spreadsheet includes 28 distinct forestry and environmental services, ranging from Forest Stand Delineation and Forest Conservation Plans to Forest Enhancement, Tree Planting, Hazard Tree Removal, and UXO support services. Each line item has estimated quantities with no maximum limit, and the subtotal for all line items is consistently $1,190,140.00 across each contract period.
The contract is solicited by the Department of the Army Materiel Command Army Contracting Command at Aberdeen Proving Ground, with the solicitation number W56ZTN26RA002. The contract's primary focus areas are forest resource compliance and forest resource management, with individual task orders defining specific regulatory requirements, funding sources, performance parameters, and performance schedules. The solicitation was amended on 06 January 2026 to include the Government's responses to Requests for Information, a list of UXO Contractors, and an updated Pricing Spreadsheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56ZTN25RA002 GOVERNMENTS RESPONSE TO REQUEST FOR INFORMATION.pdf | ||
| W56ZTN26RA0020001 Solicitation Amendment.pdf | ||
| Forestry L and M with RFI Corrections.docx | DOCX document | |
| Approved UXO Vendor List 2023.pdf | ||
| Forestry Re-compete Sample Task Order-FINAL.docx | DOCX document | |
| Forestry Past Performance Questionaire.pdf | ||
| B08-RFP Attachment 1-Forestry Line Item Spreadsheet-5.27.25.xlsx | XLSX spreadsheet | |
| Forestry Question and Answer.docx | DOCX document | |
| Solicitation - W56ZTN26RA002.pdf | ||
| Forestry Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Year One Ordering Period
| Base Year Ordering Period | ||||||
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 5.00 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 1.00 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 15.00 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 25.00 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 750.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 40.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 25.00 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |
*Reference RFP/Contract Section H, "Requirement's Contract Limits" for the maximum limit of the contractor’s obligation to deliver and the Government’s obligation to order.
Year Two Ordering Period
| Option Year 1 Ordering Period | ||||||
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 5.00 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 1.00 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 15.00 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 25.00 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 750.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 40.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 25.00 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |
*Reference RFP/Contract Section H, "Requirement's Contract Limits" for the maximum limit of the contractor’s obligation to deliver and the Government’s obligation to order.
Year Three Ordering Period
| Option Year 2 Ordering Period | ||||||
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 5.00 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 1.00 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 15.00 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 25.00 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 750.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 40.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 25.00 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |
*Reference RFP/Contract Section H, "Requirement's Contract Limits" for the maximum limit of the contractor’s obligation to deliver and the Government’s obligation to order.
Year Four Ordering Period
| Option Year 3 Ordering Period | ||||||
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 5.00 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 1.00 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 15.00 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 25.00 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 750.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 40.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 25.00 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |
*Reference RFP/Contract Section H, "Requirement's Contract Limits" for the maximum limit of the contractor’s obligation to deliver and the Government’s obligation to order.
Year Five Ordering Period
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 5.00 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 1.00 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 15.00 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 25.00 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 750.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 40.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 25.00 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |
*Reference RFP/Contract Section H, "Requirement's Contract Limits" for the maximum limit of the contractor’s obligation to deliver and the Government’s obligation to order.
6-Month Option Period
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 2.50 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 2.50 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 0.50 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 7.50 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 12.50 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 50.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 2.50 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 2.50 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 2.50 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 2.50 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 375.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 50.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 50.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 2.50 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 2.50 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 2.50 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 2.50 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 50.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 2.50 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 2.50 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 2.50 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 2.50 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 12.50 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |
*Reference RFP/Contract Section H, "Requirement's Contract Limits" for the maximum limit of the contractor’s obligation to deliver and the Government’s obligation to order.