Solid Waste Sampling Support Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W56ZTN-16-T-0007 25-Aug-2016

b. TELEPHONE NUMBER

443-861-4744

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 15 Sep 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W56ZTN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

AMY M. BOWEN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0010870367

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ACC-APG - GARRISON DIVISION (W56ZTN)

ACC-APG GARRISON DIVISION

6001 COMBAT DRIVE

ABERDEEN PROVING GROUND MD 21005

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$15,000,000

NAICS:

541620

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

X

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF47

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W56ZTN-16-T-0007

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 12 Months Solid Waste Sampling Support

FFP

The contractor shall provide comprehensive technical and solid waste sampling support in accordance with the Performance Work Statement.

FOB: Destination

PURCHASE REQUEST NUMBER: 0010870367

NET AMT

0002 1 Job

CMRA

FFP

The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this purchase order for refuse and recycling. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on "Department of the Army CMRA" or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2015. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil/, by clicking on "Send an email" which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Components Contractor Manpower Reporting website.

1001 6 Months OPTION Option to Extend

FFP

The Government reserves the right to extend the period of performance for up to six (6) months.

PERFORMANCE WORK STATEMENT

Solid Waste Sampling Support

1.0 SCOPE.

The Contractor shall provide support to the Environmental Division, Directorate of Public Works (DPW-ED) at U.S. Aberdeen Proving Ground (APG). Specific tasks include preparation of solid waste reports for submittal to the Maryland Department of the Environment (MDE), sampling and analysis program.

1.1 BACKGROUND.

APG occupies over 72,000 acres used for a variety of purposes, including research & development, training activities, and residential use by over 22,000 people. The APG Solid Waste (SW) Program requires solid waste services to meet the requirements of the state of Maryland and Army Regulation 200-1, Environmental Protection and Enhancement. The Solid Waste Program includes sampling of various SW streams and monitoring of groundwater and methane gas at two closed rubble landfills. The Phillips Army Airfield (PAAF) and Westwood Rubble Landfills are located in the Aberdeen area and Edgewood Area of Aberdeen Proving Ground respectively. Disposal operations for PAAF began in 1971 and for Westwood in 1980.

Both ceased accepting waste as of June 30, 2001. Waste accepted at these landfills included concrete, brick, stone, metal, asphalt, plastic, and other construction and land clearing debris.

Final closure of PAAF and Westwood landfills began in March 2001 and July 2002 respectively and ended on June 7, 2002 and September 23, 2003 respectively, both with the final walkthrough and approval by MDE representatives.

1.2 Objective.

The APG Solid Waste Program, which includes the Groundwater Monitoring Program at PAAF and Westwood Rubble Landfills conducts sampling and monitoring in accordance with (IAW) the groundwater discharges permits issued by the MDE. The objective of this task order is to meet those requirements.

2.0 APPLICABLE DOCUMENTS.

For purposes of this Performance Work Statement (PWS), “Required” means that the requirements contained in the directly cited document are contractually applicable to the extent specified. The term “For guidance only” means the document is not contractually applicable and is provided for guidance and information only. The documents cited below are “required” unless specifically identified as “For guidance only”. In the event of a conflict between the document referenced herein and the contents of the PWS, the PWS shall take precedence.

2.1 List of Supporting Documents:

2.1.1 40 CFR 261. – Identification and Listing of Hazardous Waste.

2.1.2 COMAR 26.04 – Regulation of Water Supply, Sewage Disposal, and Solid Waste

2.1.3 COMAR 26.13 – Disposal of Controlled Hazardous Substances

2.1.4 AR 200-1 - Environmental Protection and Enhancement

2.1.5 APGR 200-50 – Integrated Solid Waste Management Plan

2.1.6 APGR 200-60 – APG Hazardous Waste Operations

2.1.7 U.S. EPA SW-846, Test Methods for Evaluating Solid Wastes

2.1.8 Phillips Army Airfield Sampling and Analysis Plan, August 2011

2.1.9 Westwood Rubble Landfill Sampling and Analysis Plan, August 2011

2.1.10 Phillips Army Airfield and Westwood Rubble Landfill Monitoring Well Locations

(Included in Sampling Plans)

2.1.11 40 CFR 258 – Appendix II – List of Hazardous Inorganic and Organic Constituents

3.0 REQUIREMENTS (Performance Work Statement).

The contractor, as an independent contractor and not as an agent of the Government, shall provide all resources, except for those identified as Government furnished property or assistance, to perform the following work:

3.1 Task 1: Kick-off Work Meeting.

3.1.1 The contractor shall host a start of work (“Kick-Off Work”) meeting at its facility within ten (10) days after task award.

3.1.2 The purpose of this meeting is to summarize its understanding of the tasks to be completed, ask and answer questions, and serve as a venue for all parties to make introductions.

The Kick-Off Work meeting shall include a verbal “walk-through” of this PWS.

3.1.3 The contractor shall provide Kick-Off Work meeting minutes to the COR not later than (NLT) forty eight (48) hours after the Kick-Off Work meeting.

3.2 Task 2: Sewage Sludge Sampling, Analysis and Reports.

The contractor shall provide services for sewage sludge sampling and analyses for the Edgewood Area of Aberdeen Proving Ground’s Wastewater Treatment Plant (WWTP). The contractor shall collect samples once annually from the sewage sludge digester and submit to an approved lab for analysis consistent with Maryland regulations for Class I sewage sludge. Samples shall be collected between January 1 and March 31, 2017 for the annual report The samples shall be analyzed for percent solids, pH, and dry weight concentrations of Total Kjeldahl Nitrogen (TKN), ammonia, nitrate, phosphorus, potassium, cadmium, copper, mercury, nickel, lead, and zinc. Polychlorinated Biphenyls (PCBs) shall be analyzed from one of the samples IAW Code of Maryland Regulations (COMAR) requirements. The contractor shall coordinate with the Contracting Officer’s Representative (COR) to gain access to the WWTP. Samples shall be taken from the secondary digester from the sludge sampling point located in the basement of the digester building.

3.2.1 Subtask 2A: Annual Sewage Sludge Generator’s Report.

The contractor shall prepare and submit the Annual Sewage Sludge Generator’s Report IAW COMAR 26.04.06.06. The contractor shall complete the report forms and prepare a transmittal letter for the COR’s execution and submittal 5 business days after taking the sample. The contractor shall provide copies of the reports and letter for the COR’s record. The annual Sewage Sludge Generator’s report shall be submitted to the COR by January 15, 2017. The report is due to the MDE by January 31, 2017.

3.2.2 Subtask 2B: Annual Sewage Sludge Monitoring Analysis Report.

The contractor shall provide the COR with one (1) Annual Sewage Sludge Monitoring Analysis Report. The annual report will be for the monitoring period from January 2017 through March, 2017.The report is due to the MDE by June 1, 2017. . The contractor shall submit two copies, both a hard copy and an electronic copy of the report, one for MDE and one for APG, to the COR IAW Section 5.2.2 of the PWS.

3.3 Task 3: Solid Waste Sampling and Analyses.

The contractor shall respond up to four (4) requests by the COR for sampling of various solid wastes at APG. The various solid waste streams may include lead based paint waste, oil contaminated soil, building debris, asbestos containing materials, leachate, water, and/or wastewater.

3.3.1 Subtask 3A: Solid Waste Sampling Plan.

The contractor shall assess the material to be sampled, ascertain the objective of the sampling, and develop a sampling plan consistent with industry standard practice specified in documents such as U.S. EPA SW-846, Test Methods for Evaluating Solid Wastes, Title 40 of the Code of Federal Regulations (CFR), Part 136, Guidelines Establishing Test Procedures for the Analysis of Pollutants in water,. The contractor shall submit each draft sampling plan to the COR for review and approval IAW Section 5.3.1 prior to the sampling. If time is of the essence, the COR will request the contractor to forgo the sampling plan and prepare a brief memorandum (2-10 pages long) to the COR communicating the nature of the expected sampling effort and shall proceed with sampling after approval from the COR. The samples collected for laboratory analysis shall be properly packaged with chain of custody documents for shipment to an approved laboratory. The contractor shall adhere to the following procedures:

3.3.1.1 All samples obtained shall be collected and preserved IAW the standard methods included in EPA guidance SW 846 or any other appropriate sampling technology other appropriate sampling methodologies.

3.3.1.2 Standard glass or plastic sample containers shall be used for each sample collected.

3.3.1.3 Quality Assurance/Quality Control duplicate samples and field and laboratory blanks shall be specified IAW standard environmental sampling protocols, or when specified by the

COR.

3.3.1.4 Field notebooks shall be maintained to document dates, times, personnel, sample locations, weather conditions, equipment notes, and field observations.

3.3.1.5 Laboratory turnaround time is standard at 7 business days unless accelerated turnaround is requested by the COR.

3.3.2 Subtask 3B: Sampling Summary and Evaluation.

The contractor shall submit to the COR with a brief summary and evaluation of the sampling and analytical results for each of the 4 sampling events IAW Section 5.3.2 of the PWS. The summary, at a minimum, shall include background information including a sketch of the sampling location(s), a summary of laboratory results and their significance, applicable regulatory levels if any, appropriate recommendations, and the laboratory reports. For proposal purposes, the contractor shall assume the following: two (2) building demolition samples analyzed for lead and asbestos and two (2) soil samples analyzed for Toxic Characteristic Leaching Procedure (TCLP) metals.

3.3.3 Subtask 3C: Laboratory Analyses Report.

The contractor shall submit to the COR the laboratory analyses of waste associated with each of the 4 sampling events within 5 business days after the laboratory results are received, IAW Section 5.3.3 of the PWS. These analytical events may include, but are not limited to: TCLP, total petroleum hydrocarbons (TPH), PCB, total metals, volatile organic carbons (VOCs), paint filter tests, etc. The Contractor shall provide cost per sampling and analysis event. The contractor shall submit the sampling and analysis report NLT 5 business days after receiving the laboratory results. The report shall contain background information and a sketch of the sampling locations, a summary of laboratory results and their significance, applicable regulatory levels if any, appropriate recommendations, and the laboratory reports.

3.4 Task 4: Groundwater and Methane Monitoring at Landfills.

3.4.1 Subtask 4A: Quarterly Methane Monitoring.

The contractor shall conduct quarterly methane monitoring of the air within the nine (9) gas points at the Phillips Army Airfield landfill and four (4) gas points at the Westwood landfill.

The contractor shall adhere to the following procedures:

3.4.1.1 Monitoring shall be IAW the approved APG Sampling and Analysis Plan dated August 2011. Methane concentrations shall be monitored with a Landtec GEM 2000 Gas Analyzer or equivalent as specified in the sampling plans. The gas analyzer shall be calibrated at the onset of each monitoring event per the manufacturers specifications using the calibration gas mixture specified in the sampling plans; 50% methane, 35% carbon dioxide and 4% oxygen. At each gas monitoring point, the following information shall be recorded: well identifier, methane concentration within each gas well, relative humidity, precipitation if any, atmospheric pressure, down hole pressure, and well/ground surface conditions around the well.

3.4.1.2 The contractor shall record all data in a bound field notebook which shall be provided to APG two weeks prior to task order completion IAW Section 5.4.1 of the PWS. The contractor shall incorporate this data into the annual groundwater and methane monitoring reports for each landfill, IAW Section 3.4.3.7.

3.4.2 Subtask 4B: Well Elevation Monitoring.

3.4.2.1 The contractor shall record water level elevations in each groundwater well concurrently with the quarterly methane monitoring. The contractor shall collect elevations from six (6) groundwater monitoring wells specified in the Phillips Army Airfield Sampling and Analysis Plan and five (5) groundwater monitoring wells specified in the Westwood Sampling and Analysis Plan (support documents 2.1.8 and 2.1.9, respectively). Parameters monitored shall include depth of well and depth to water both taken from the top of the casing which is the surveyed reference point.

3.4.2.2 The data shall be recorded in a field log which shall be provided to the COR two weeks prior to Task Order completion IAW Section 5.4.2 of the PWS. The data shall also be included in the annual groundwater and methane monitoring reports for each landfill (IAW Section 3.4.3.7) inclusive of groundwater elevation and direction of flow maps.

3.4.3 Subtask 4C: Annual Groundwater Monitoring and Sampling Report.

3.4.3.1 The contractor shall conduct groundwater monitoring twice annually of six (6) PAAF wells and once annually of five (5) Westwood wells IAW the approved APG Sampling and Analysis Plan dated August 2011 for each landfill. The first samples shall be taken in October for both PAAF and Westwood sites. The second samples shall be taken during the period from March through April for the PAAF site only. To minimize down well disturbance, Granados low-flow pumps shall be utilized to purge the monitoring wells and to obtain groundwater samples. Stainless steel bailers may be used, per the sampling plans, for those wells that have limited access, specifically Phillips Well (PW) PW 11 and PW 12 at PAAF.

3.4.3.2 The contractor shall coordinate with the COR, including Aberdeen Test Center (ATC) Range Control, for access to each landfill. The contractor should be aware that the October sampling time frame coincides with hunting season. The contractor shall also coordinate with the COR who will coordinate with the APG Environmental Division Natural Resources Branch to close the hunting areas around the landfills during the sampling events to insure the safety of the sampling personnel.

3.4.3.3 The sampling shall begin by measuring depth to water and depth of well within each well. From this data, the contractor shall calculate the volume of three casing volumes and purge the wells of this volume so as to remove stagnant water within the casing and gravel pack. The contractor shall take field measurements of pH, temperature, specific conductivity, turbidity, dissolved oxygen and oxidation reduction potential upon purge initiation and at purge completion. The contractor shall commence sampling within 24 hours, collecting the samples consistent with Table 3 of each Sampling Plan. The contractor shall collect samples in the order of greatest to least volatility as specified in section 3.6.3 of each sampling plan. Sample collection order shall be VOCs, (as listed in 2.2.11) metals (total), chemical oxygen demand (COD), hardness, nitrate, alkalinity, chloride, specific conductance, sulfate, pH, turbidity, total dissolved solids (TDS), ammonia, and gross alpha / beta / asbestos (gross alpha / beta / asbestos at Westwood only).

3.4.3.4 The contractor shall preserve samples per Table 3 of the Sampling Plans, labeled, recorded on a chain of custody, and iced for delivery to the laboratory. The contractor shall also obtain quality control samples, including daily trip blanks, one Rinseate blank and one duplicate for every ten samples. Because there are fewer than 10 samples at each site, one Rinseate blank and one duplicate shall be randomly collected for Westwood and one for Phillips Army Airfield.

The contractor shall ensure that the trip blanks prepared by the analytical laboratory from where the sample bottles originate shall accompany the sample bottles to the field and be returned to the laboratory for VOC analysis. The Rinseate blank and duplicates shall be generated in the field and shall be analyzed for all parameters contained in Table 3 of each sampling plan.

3.4.3.5 Laboratories shall be required to meet the Maryland practical quantization limits (PQLs) for each of the analysts as shown in Appendix A of each sampling plan. All equipment that contacts the well water shall be decontaminated before being placed into the next well IAW the Sampling Plans. The contractor shall collect decontamination water, ensure that pH is neutralized to pH 5.0 – 8.0, and discharge it to the sanitary sewer.

3.4.3.6 Reporting field activities shall be recorded in a field log book to include sample location, well identifier, time, date, sampling personnel, well depth, water depth, purge volume calculations, flow rate used to purge and sample if using a pump, purge volume removed, number, type and size of samples collected, equipment notes, field observations including weather/other pertinent items, and all field parameter values. The field log shall be delivered to the COR two weeks prior to task order completion IAW Section 5.4.3 of the PWS.

3.4.3.7 The contractor shall prepare an annual report of the sampling results inclusive of the quarterly water level gauging and methane monitoring for each landfill. The contractor shall deliver the two (2) draft reports (one for the PAAF and one for the Westwood Landfill) to the

COR by December 15, 2017 for review IAW Section 5.4.3 of the PWS. The reports shall contain background information consistent with the sampling plans, a summary of the sampling methodology, discussion of any relevant observations, presentation of the quarterly methane data and groundwater elevations and interpretive discussion of the findings. In addition, groundwater contour maps including direction of flow of the groundwater shall be included in the reports.

Analytical results shall be presented in tabular format as well as inclusion of the laboratory reports. Tabulation of the data shall include a time series evaluation by well showing all historical data per well as well as the current data. Historical data for wells no longer included in the sampling plan shall not be included in the report. The most recent report for each landfill will be made available to the contractor by the COR during the Kick-Off meeting, in order to develop the time series analysis. The contractor shall deliver four (4) hard copies and one (1) electronic copy of the final report for each landfill to the COR IAW Section 5.4.3 of the PWS.

3.5 All work under this PWS shall be performed in a safe manner IAW the approved Health and Safety Plan (HASP) under the basic contract.

3.6 The contractor shall ensure that all deliverables are complete, prepared IAW regulatory guidelines, and meet regulatory requirements. The contractor shall submit to the COR at least two hard copies and two electronic copy of each deliverable report for regulatory submittals and office use, unless specified otherwise. All regulatory reports shall have cover letters to be signed by the government official designated by the COR. All deliverables shall be submitted at least two weeks prior to the regulatory deadline as indicated in the permits for internal coordination and reviews IAW the List of Deliverables included with this PWS. After the submittal, if a regulator believes that the deliverable did not meet the requirements, the contractor shall correct deficiencies to ensure that the deliverable is acceptable to the regulators. All deliverables, backup data, field notes, and other information gathered for performance of the work are the property of the Government.

3.7 The contractor shall implement a document review and quality controls process to ensure the deliverables are free from errors.

4.0 ADMINISTRATION

4.1 General.

There are adequate restroom facilities. All regulations will apply to contractor personnel.

Adequate parking is available and there is no public transportation available.

4.2 Identification.

Contractor personnel shall display a Contractor Identification badge clearly identifying them as non-Government personnel. Identification shall include at a minimum: Contractor name, employee name, and picture.

5.0 ITEMS AND DATA TO BE DELIVERED

5.1 Task 1: Kick-off Work Meeting.

The contractor shall host a start of work (“Kick-Off Work”) meeting at its facility within ten (10) days after task award to summarize its understanding of the tasks to be completed, ask and answer questions, and serve as a venue for all parties to make introductions. The contractor shall provide a hard copy and electronic copy of the Kick-Off Work meeting minutes to the COR not later than (NLT) forty-eight (48) hours after the Kick-Off Work meeting.

5.2 Task 2: Sewage Sludge Sampling, Analysis and Reports.

5.2.1 Subtask 2A: Annual Sewage Sludge Generator’s Report

The contractor shall submit two (2) hard copies and two (2) electronic copies of the Annual Sewage Sludge Generator’s Report to the COR by January 15, 2017.

5.2.2 Subtask 2B: Annual Sewage Sludge Monitoring Analysis Report.

The contractor shall submit two (2) hard copies and two (2) electronic copies of the Annual Sewage Sludge Monitoring Analysis Report for the monitoring period from January through March 2017 to the COR by May 15, 2017. One copy for APG and one copy for MDE. The report is due to the MDE by June 1, 2017.

5.3 Task 3: Solid Waste Sampling and Analyses.

5.3.1 Subtask 3A: Solid Waste Sampling Plan.

The contractor shall submit one (1) hard copy and one (1) electronic copy of their Solid Waste Sampling plan to the COR for review and approval NLT fourteen (14) business days after the COR’s request for sampling and at least five (5) business days before conducting any sampling.

If time is limited, at the COR’s request, the Contractor shall instead submit one (1) hard copy and one (1) electronic copy of a brief memorandum of the expected sampling effort to the COR for review and approval, within the same time frame listed.

5.3.2 Subtask 3B: Sampling Summary and Evaluation.

The contractor shall submit one (1) hard copy and one (1) electronic copy of a sampling summary and evaluation to the COR NLT forty-six (46) business days after the COR’s request for sampling.

5.3.3 Subtask 3C: Laboratory Analyses.

The contractor shall submit one (1) hard copy and one (1) electronic copy of the sampling and analysis report to the COR NLT five (5) business days after receiving the laboratory results of waste analysis.

5.4 Task 4: Groundwater and Methane Monitoring at Landfills.

5.4.1 Subtask 4A: Quarterly Methane Monitoring.

The contractor shall submit one (1) hard copy and one (1) electronic (scanned) copy of the field notebook containing all methane monitoring data to the COR two weeks prior to contract completion date. The contractor shall incorporate this data into the annual groundwater and methane monitoring reports IAW 5.4.3.

5.4.2 Subtask 4B: Well Elevation Monitoring.

The contractor shall submit one (1) hard copy and one (1) electronic (scanned) copy of the field log of well elevation monitoring data to the COR by December 15, 2016 (upon task order completion). The contractor shall incorporate this data into the annual groundwater and methane monitoring reports IAW 5.4.3.

5.4.3 Subtask 4C: Annual Groundwater Monitoring and Sampling Report.

The contractor shall submit the following to the COR by the dates listed:

1) One (1) hard copy and one (1) electronic (scanned) copy of the contractor’s field log of all reporting field activities by September 15, 2017 (upon task order completion).

2) Two (2) hard copies and two (2) electronic copies of the Semi-annual report for the PAAF landfill by May 15, 2017.

3) One (1) hard copy and one (1) electronic copy of the draft annual report for the PAAF Landfill and one (1) hard copy and one electronic copy of the annual draft report for the Westwood landfill by December 15, 2016.

4) Two (2) hard copies and two (2) electronic copy of the final report for the PAAF landfill and Two (2) hard copies and two (2) electronic copy of the final report for the Westwood landfill by January 15 2017.

6.0 TRAINING

The COR or alternate COR will provide 2-hour briefing and training to the contractor personnel at the kick-off meeting. The contractor shall provide documentation to prove that all on-site personnel have required training to meet all federal and state regulations before commencing sampling and analytical work.

7.0 SAFETY AND SECURITY

The contractor and contractor personnel shall abide by all Aberdeen Proving Ground Security policies. Contractor personnel shall be required to obtain security badge, if needed. The Government will provide an SSB Form 1199, Application for Civilian ID Card/Security badge, and FD 258, Application Finger Print Card for each employee requiring unescorted access to complete upon task award.

Army Policy requirement: A signed AT/OPSEC cover sheet is required to be included in all requirements packages except for supply contracts under the Simplified Acquisition Threshold

(SAT), field ordering officer actions and Government Purchase Card (GPC) purchases.

Command policy may require this form for supply contracts under the SAT.

Anti-Terrorism (AT) Level 1 Awareness Training: This provision/contract training is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I Awareness Training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level 1 Awareness Training is available at the following website:

https:/atlevel1.dtic.mil/at.

Access and General Protection/Security Policy and Procedures: The contractor and all associated subcontractors' employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor workforce must comply with all personnel identity verification requirements as directed by DoD, HQDA and/or Security Office.

Should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. Personnel who need access to Aberdeen Proving Ground must possess one of the following forms of Identification: DoD Common Access Card, DoD Teslin Identification Card (Retiree or Family Member), a DA Form 1602 (Civilian Identification Card) with access to APG or an identification card from another Federal Agency. Contractors who are enrolled in the Rapid Gate Program must be approved for access to APG for the Rapid Gate ID Card to be valid for APG. Companies wishing to enroll in the Rapid Gate Program must contact EID Passport for information on who to enroll. All other personnel without one of the above forms of identification must process through the Visitor Center. All personnel must have a valid state driver's license, state issued identification card or Department of State work authorization card. All drivers must have valid vehicle registration or rental vehicle agreement for the vehicle they are driving. All visitors will be cleared in accordance with Army Access Control policy.

iWATCH training: The contractor and all associated subcontractors shall brief all employees on the local iWATCH program by completing the on line training class at http://www.apg.army.mil/elearning.cfm, under Security and Intelligence, reporting suspicious activity. This locally developed training will be used to inform employees of the types of behavior to watch for. All employees are to report suspicious activity to the COR. This training shall be completed within seven (7) calendar days of contract award and seven (7) calendar days of new employees' commencing performance, with the results reported to the COR no later than 14 calendar days after contract award.

8.0 KEY PERSONNEL

All job categories are composed of a job description and an experience requirement. Unless a college degree is specifically required, all personnel shall require high school diploma, or equivalent.

8.1 Project Manager

The contractor’s Project Manager will be a SW subject matter expert with a Master’s of Science (MS) degree in engineering and at least ten (10) years of full-time work experience in Solid Waste projects similar in size, scope and dollar value. The Project Manager oversees the management and execution of the task order IAW the approved PWS, approved work plans, and all federal, state and local regulations. The Project Manager is responsible for design concepts and personnel efforts during the project, and ensuring the success of project quality control activities and management.

8.2 Lab Pack Chemist

The contractor’s Lab Pack Chemist(s) must possess a Bachelor’s degree from an accredited school in an environmentally related technical field and a minimum of five (5) years of directly applicable experience. Lab Pack Chemists will be responsible for conducting and overseeing field sampling and reporting, evaluating and analyzing environmental samples, ensuring environmental regulatory compliance, developing technical documents, and supervising Lab Pack Technicians.

8.3 Lab Pack Technician

Each of the contractor’s Lab Pack Technicians must possess an Associate’s degree in an environmentally related technical field and a minimum of three (3) years of directly applicable experience. Lab Pack Technicians will be responsible for conducting field investigations, collecting, evaluating, and analyzing environmental samples, and assisting in the development of technical documents.

8.4 Additional Project Support Staff

Additional project support staff members shall each have a Bachelor’s of Science (BS) degree in engineering or other sciences and a minimum three (3) years of experience in SW projects similar in size, scope, and complexity.

9.0 PERIOD OF PERFORMANCE.

The period of performance for this task order is from date of award for 12 months

WAGE DETERMINATION

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2005-2247 Daniel W. Simms Division of | Revision No.: 18 Director Wage Determinations| Date Of Revision: 12/29/2015 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Service Contract Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

State: Maryland Area: Maryland Counties of Anne Arundel, Baltimore, Baltimore City, Carroll, Harford, Howard **Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE FOOTNOTE RATE

01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I $15.08 01012 - Accounting Clerk II $16.92 01013 - Accounting Clerk III $22.30 01020 - Administrative Assistant $31.41 01040 - Court Reporter $21.84 01051 - Data Entry Operator I $14.38 01052 - Data Entry Operator II $15.69 01060 - Dispatcher, Motor Vehicle $17.87 01070 - Document Preparation Clerk $14.21 01090 - Duplicating Machine Operator $14.21 01111 - General Clerk I $14.88 01112 - General Clerk II $16.24

01113 - General Clerk III $18.23 01120 - Housing Referral Assistant $25.29 01141 - Messenger Courier $13.40 01191 - Order Clerk I $15.12 01192 - Order Clerk II $16.50 01261 - Personnel Assistant (Employment) I $18.15 01262 - Personnel Assistant (Employment) II $20.32 01263 - Personnel Assistant (Employment) III $22.65 01270 - Production Control Clerk $22.03 01280 - Receptionist $14.43 01290 - Rental Clerk $16.55 01300 - Scheduler, Maintenance $18.07 01311 - Secretary I $18.07 01312 - Secretary II $20.18 01313 - Secretary III $25.29 01320 - Service Order Dispatcher $16.13 01410 - Supply Technician $28.55 01420 - Survey Worker $20.03 01531 - Travel Clerk I $13.29 01532 - Travel Clerk II $14.36 01533 - Travel Clerk III $15.49 01611 - Word Processor I $15.63 01612 - Word Processor II $17.67 01613 - Word Processor III $19.95 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass $22.54 05010 - Automotive Electrician $23.51 05040 - Automotive Glass Installer $22.15 05070 - Automotive Worker $22.15 05110 - Mobile Equipment Servicer $19.89 05130 - Motor Equipment Metal Mechanic $24.10 05160 - Motor Equipment Metal Worker $22.15 05190 - Motor Vehicle Mechanic $24.10 05220 - Motor Vehicle Mechanic Helper $18.92 05250 - Motor Vehicle Upholstery Worker $21.81 05280 - Motor Vehicle Wrecker $22.15 05310 - Painter, Automotive $23.15 05340 - Radiator Repair Specialist $22.15 05370 - Tire Repairer $13.77 05400 - Transmission Repair Specialist $24.10 07000 - Food Preparation And Service Occupations 07010 - Baker $13.85 07041 - Cook I $12.55 07042 - Cook II $14.60

07070 - Dishwasher $10.11 07130 - Food Service Worker $10.66 07210 - Meat Cutter $17.72 07260 - Waiter/Waitress $9.04 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter $18.13 09040 - Furniture Handler $14.06 09080 - Furniture Refinisher $17.69 09090 - Furniture Refinisher Helper $15.15 09110 - Furniture Repairer, Minor $16.42 09130 - Upholsterer $18.63 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles $10.54 11060 - Elevator Operator $10.54 11090 - Gardener $17.52 11122 - Housekeeping Aide $11.83 11150 - Janitor $11.83 11210 - Laborer, Grounds Maintenance $13.07 11240 - Maid or Houseman $11.26 11260 - Pruner $11.76 11270 - Tractor Operator $16.04 11330 - Trail Maintenance Worker $13.07 11360 - Window Cleaner $12.85 12000 - Health Occupations 12010 - Ambulance Driver $19.56 12011 - Breath Alcohol Technician $19.44 12012 - Certified Occupational Therapist Assistant $24.54 12015 - Certified Physical Therapist Assistant $23.03 12020 - Dental Assistant $17.18 12025 - Dental Hygienist $36.35 12030 - EKG Technician $26.44 12035 - Electroneurodiagnostic Technologist $26.77 12040 - Emergency Medical Technician $20.77 12071 - Licensed Practical Nurse I $19.07 12072 - Licensed Practical Nurse II $21.35 12073 - Licensed Practical Nurse III $24.13 12100 - Medical Assistant $15.01 12130 - Medical Laboratory Technician $18.04 12160 - Medical Record Clerk $17.42 12190 - Medical Record Technician $19.50 12195 - Medical Transcriptionist $17.93 12210 - Nuclear Medicine Technologist $37.60 12221 - Nursing Assistant I $10.80 12222 - Nursing Assistant II $12.14

12223 - Nursing Assistant III $13.98 12224 - Nursing Assistant IV $15.69 12235 - Optical Dispenser $16.90 12236 - Optical Technician $15.80 12250 - Pharmacy Technician $18.12 12280 - Phlebotomist $15.69 12305 - Radiologic Technologist $31.11 12311 - Registered Nurse I $27.64 12312 - Registered Nurse II $33.44 12313 - Registered Nurse II, Specialist $33.44 12314 - Registered Nurse III $40.13 12315 - Registered Nurse III, Anesthetist $40.13 12316 - Registered Nurse IV $48.10 12317 - Scheduler (Drug and Alcohol Testing) $21.73 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I $19.08 13012 - Exhibits Specialist II $23.63 13013 - Exhibits Specialist III $28.91 13041 - Illustrator I $20.21 13042 - Illustrator II $24.91 13043 - Illustrator III $30.48 13047 - Librarian $33.88 13050 - Library Aide/Clerk $14.21 13054 - Library Information Technology Systems $30.60 Administrator 13058 - Library Technician $19.89 13061 - Media Specialist I $18.73 13062 - Media Specialist II $20.95 13063 - Media Specialist III $23.36 13071 - Photographer I $15.59 13072 - Photographer II $18.64 13073 - Photographer III $23.09 13074 - Photographer IV $25.14 13075 - Photographer V $30.39 13110 - Video Teleconference Technician $20.39 14000 - Information Technology Occupations 14041 - Computer Operator I $18.92 14042 - Computer Operator II $21.18 14043 - Computer Operator III $23.60 14044 - Computer Operator IV $26.22 14045 - Computer Operator V $29.05 14071 - Computer Programmer I (see 1) $26.36 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1)

14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator $18.92 14160 - Personal Computer Support Technician $26.22 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) $36.47 15020 - Aircrew Training Devices Instructor (Rated) $44.06 15030 - Air Crew Training Devices Instructor (Pilot) $52.81 15050 - Computer Based Training Specialist / Instructor $36.47 15060 - Educational Technologist $31.17 15070 - Flight Instructor (Pilot) $52.81 15080 - Graphic Artist $26.73 15090 - Technical Instructor $21.53 15095 - Technical Instructor/Course Developer $28.96 15110 - Test Proctor $19.37 15120 - Tutor $19.37 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler $9.88 16030 - Counter Attendant $9.89 16040 - Dry Cleaner $12.94 16070 - Finisher, Flatwork, Machine $9.88 16090 - Presser, Hand $9.88 16110 - Presser, Machine, Drycleaning $9.88 16130 - Presser, Machine, Shirts $9.88 16160 - Presser, Machine, Wearing Apparel, Laundry $9.88 16190 - Sewing Machine Operator $13.78 16220 - Tailor $14.66 16250 - Washer, Machine $10.88 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) $20.49 19040 - Tool And Die Maker $23.34 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator $18.02 21030 - Material Coordinator $22.03 21040 - Material Expediter $22.03 21050 - Material Handling Laborer $13.83 21071 - Order Filler $14.44 21080 - Production Line Worker (Food Processing) $18.02 21110 - Shipping Packer $15.09 21130 - Shipping/Receiving Clerk $15.09 21140 - Store Worker I $14.98 21150 - Stock Clerk $17.06

21210 - Tools And Parts Attendant $18.02 21410 - Warehouse Specialist $18.02 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder $26.97 23021 - Aircraft Mechanic I $25.69 23022 - Aircraft Mechanic II $26.97 23023 - Aircraft Mechanic III $28.33 23040 - Aircraft Mechanic Helper $18.03 23050 - Aircraft, Painter $21.98 23060 - Aircraft Servicer $19.76 23080 - Aircraft Worker $21.01 23110 - Appliance Mechanic $21.54 23120 - Bicycle Repairer $13.77 23125 - Cable Splicer $26.02 23130 - Carpenter, Maintenance $21.40 23140 - Carpet Layer $21.27 23160 - Electrician, Maintenance $27.98 23181 - Electronics Technician Maintenance I $24.94 23182 - Electronics Technician Maintenance II $26.07 23183 - Electronics Technician Maintenance III $27.06 23260 - Fabric Worker $20.30 23290 - Fire Alarm System Mechanic $22.91 23310 - Fire Extinguisher Repairer $18.92 23311 - Fuel Distribution System Mechanic $25.38 23312 - Fuel Distribution System Operator $21.21 23370 - General Maintenance Worker $21.43 23380 - Ground Support Equipment Mechanic $25.69 23381 - Ground Support Equipment Servicer $19.76 23382 - Ground Support Equipment Worker $21.01 23391 - Gunsmith I $19.39 23392 - Gunsmith II $21.13 23393 - Gunsmith III $22.91 23410 - Heating, Ventilation And Air-Conditioning $23.72 Mechanic 23411 - Heating, Ventilation And Air Contditioning $24.56 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic $22.91 23440 - Heavy Equipment Operator $22.91 23460 - Instrument Mechanic $23.58 23465 - Laboratory/Shelter Mechanic $21.91 23470 - Laborer $14.98 23510 - Locksmith $21.90 23530 - Machinery Maintenance Mechanic $23.12 23550 - Machinist, Maintenance $21.87

23580 - Maintenance Trades Helper $18.27 23591 - Metrology Technician I $23.58 23592 - Metrology Technician II $24.42 23593 - Metrology Technician III $25.12 23640 - Millwright $26.16 23710 - Office Appliance Repairer $21.24 23760 - Painter, Maintenance $21.91 23790 - Pipefitter, Maintenance $23.64 23810 - Plumber, Maintenance $22.29 23820 - Pneudraulic Systems Mechanic $22.91 23850 - Rigger $24.07 23870 - Scale Mechanic $21.13 23890 - Sheet-Metal Worker, Maintenance $22.91 23910 - Small Engine Mechanic $21.13 23931 - Telecommunications Mechanic I $28.17 23932 - Telecommunications Mechanic II $32.26 23950 - Telephone Lineman $27.41 23960 - Welder, Combination, Maintenance $22.91 23965 - Well Driller $22.91 23970 - Woodcraft Worker $22.91 23980 - Woodworker $19.39 24000 - Personal Needs Occupations 24570 - Child Care Attendant $12.73 24580 - Child Care Center Clerk $15.95 24610 - Chore Aide $10.57 24620 - Family Readiness And Support Services $15.66 Coordinator 24630 - Homemaker $17.24 25000 - Plant And System Operations Occupations 25010 - Boiler Tender $24.24 25040 - Sewage Plant Operator $20.84 25070 - Stationary Engineer $24.24 25190 - Ventilation Equipment Tender $19.21 25210 - Water Treatment Plant Operator $20.84 27000 - Protective Service Occupations 27004 - Alarm Monitor $17.17 27007 - Baggage Inspector $12.71 27008 - Corrections Officer $22.80 27010 - Court Security Officer $24.72 27030 - Detection Dog Handler $17.85 27040 - Detention Officer $22.80 27070 - Firefighter $24.63 27101 - Guard I $12.71 27102 - Guard II $17.85

27131 - Police Officer I $26.52 27132 - Police Officer II $29.67 28000 - Recreation Occupations 28041 - Carnival Equipment Operator $11.84 28042 - Carnival Equipment Repairer $12.31 28043 - Carnival Equpment Worker $9.24 28210 - Gate Attendant/Gate Tender $13.01 28310 - Lifeguard $11.59 28350 - Park Attendant (Aide) $14.56 28510 - Recreation Aide/Health Facility Attendant $10.62 28515 - Recreation Specialist $18.04 28630 - Sports Official $11.33 28690 - Swimming Pool Operator $15.87 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer $22.75 29020 - Hatch Tender $22.75 29030 - Line Handler $22.75 29041 - Stevedore I $21.24 29042 - Stevedore II $24.15 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) $39.92 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) $26.84 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) $29.56 30021 - Archeological Technician I $19.80 30022 - Archeological Technician II $22.60 30023 - Archeological Technician III $27.98 30030 - Cartographic Technician $27.98 30040 - Civil Engineering Technician $26.41 30061 - Drafter/CAD Operator I $20.19 30062 - Drafter/CAD Operator II $22.60 30063 - Drafter/CAD Operator III $25.19 30064 - Drafter/CAD Operator IV $31.00 30081 - Engineering Technician I $22.92 30082 - Engineering Technician II $25.72 30083 - Engineering Technician III $28.79 30084 - Engineering Technician IV $35.64 30085 - Engineering Technician V $43.61 30086 - Engineering Technician VI $52.76 30090 - Environmental Technician $26.85 30210 - Laboratory Technician $23.38 30240 - Mathematical Technician $27.98 30361 - Paralegal/Legal Assistant I $20.82 30362 - Paralegal/Legal Assistant II $25.78 30363 - Paralegal/Legal Assistant III $31.54

30364 - Paralegal/Legal Assistant IV $38.16 30390 - Photo-Optics Technician $27.98 30461 - Technical Writer I $21.93 30462 - Technical Writer II $26.84 30463 - Technical Writer III $32.47 30491 - Unexploded Ordnance (UXO) Technician I $24.74 30492 - Unexploded Ordnance (UXO) Technician II $29.93 30493 - Unexploded Ordnance (UXO) Technician III $35.88 30494 - Unexploded (UXO) Safety Escort $24.74 30495 - Unexploded (UXO) Sweep Personnel $24.74 30620 - Weather Observer, Combined Upper Air Or (see 2) $25.19 Surface Programs 30621 - Weather Observer, Senior (see 2) $27.98 31000 - Transportation/Mobile Equipment Operation Occupations 31020 - Bus Aide $15.46 31030 - Bus Driver $20.85 31043 - Driver Courier $14.33 31260 - Parking and Lot Attendant $10.80 31290 - Shuttle Bus Driver $15.66 31310 - Taxi Driver $12.25 31361 - Truckdriver, Light $15.66 31362 - Truckdriver, Medium $17.90 31363 - Truckdriver, Heavy $19.30 31364 - Truckdriver, Tractor-Trailer $9.30 99000 - Miscellaneous Occupations 99030 - Cashier $10.03 99050 - Desk Clerk $11.16 99095 - Embalmer $23.05 99251 - Laboratory Animal Caretaker I $11.24 99252 - Laboratory Animal Caretaker II $12.28 99310 - Mortician $29.35 99410 - Pest Controller $17.69 99510 - Photofinishing Worker $13.20 99710 - Recycling Laborer $16.17 99711 - Recycling Specialist $18.01 99730 - Refuse Collector $15.26 99810 - Sales Clerk $12.09 99820 - School Crossing Guard $13.43 99830 - Survey Party Chief $21.94 99831 - Surveying Aide…