Building 1 Floorplan.pdf

PDF 158 KB Posted

Attached to
NEC-DA Fiber Optic Cabling Installation Federal contract opportunity
Solicitation number
W56HZV-22-R-L036
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

View the file

Other files for this federal contract opportunity

Other files attached to NEC-DA Fiber Optic Cabling Installation, newest first.
File Type Posted
Building 2 Floorplan.pdf PDF
NEC-DA Fiber Optic Cabling Questions and Answers.docx DOCX document
W56HZV-22-R-L036 U0001.pdf PDF
W56HZV-22-R-L036_V2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

VESTIBULE

1101-L-006

ELEVATOR LOBBY

1001-L-001

LOBBY

1102-L-007

PHONE/IT

MAIL CART

1005-X-001

COPY/FAX/SHREDDER

1007-X-001

ELECTRICAL

1010-U-002

FIRE COMMAND

1306-U-009

MEN'S TOILET

1011-R-001

WOMEN'S TOILET

1020-R-002

ELEVATOR LOBBY

SERVICE

1021-L-005

RECEIVING AREA

1210-U-006

VESTIBULE

1401-L-015

CORRIDOR

1404-L-016

ROOM

TELECOMMUNICATIONS

CLASSROOM

1403-T-002

CORRIDOR

1405-L-017

CLASSROOM

1406-T-003

VENDING

1408-B-002

STAIR NORTH

1006-L-002

ELECTRICAL ROOM

1301-U-007

CORR.

1304-L-014

SIPRNET

1003-Y-001

STORAGE

GENERAL

1009-S-002 C L

O S

E T

-S -0

ROOM

FIRE PUMP/MECH.

1302-U-008

VENDING

1407-B-001

E X

IT

P

A S

S A

G E

W A

Y

-L -0

EWC

UP

SUPPLY

JANITORIAL

1013-U-003

PHONE/IT

CONFERENCE L

1016-C-001

RECYCLING

1018-U-005

CORR.

1012-L-003

CORRIDOR

1104-L-008

ROOM

PUBLIC MEETING

1103-T-001

CONFERENCE L

1108-C-003

CONFERENCE L

1107-C-002

SHREDDER

COPY/FAX/

1202-X-002

CONFERENCE S

1203-O-001

OFFICE L

1204-O-002

OFFICE L

1206-O-003

OFFICE L

1207-O-004

EXIT PASSAGEWAY

1208-L-012

STORAGE

GENERAL

1209-S-004

S T

A

IR

S

O U

T H

-L -0

CLOSET

1201-S-003

CORRIDOR

1106-L-010

CORRIDOR

1109-L-011

RECEIVING AREA

1210-U-006

OPEN OFFICE

1205-P

CORRIDOR

1105-L-009

CAGE

STORAGE

LEISURE

TRAVEL

1303-S-005

WC-102

1014-U-004

WC-100

1402-U-010

WC-101

1002-U-001

COPIER

SAFE

C A

B

IN

E T

S T

O R

A G

E T

A L L

Michael.Bogacki Text Box Bldg #2 Bldg #1

Michael.Bogacki Text Box Enclosed Passage way

Michael.Bogacki Text Box Fire rated conduit sleeve is required for wall penetration in passage way.

Michael.Bogacki Line

Michael.Bogacki Line

Michael.Bogacki Line

Michael.Bogacki Line

Michael.Bogacki Line

Michael.Bogacki Line

Michael.Bogacki Text Box Proposed SM Fiber Run

Michael.Bogacki Line

Michael.Bogacki Text Box

Michael.Bogacki Text Box Proposed 24 Strand Single Mode Fiber cable pull from building #1 to building #2. Estimated length of run is 650 feet for horizontal run. Vertical run for 6 strand Single Mode Fiber in building #2 is estimated at 150 feet.

Michael.Bogacki Line

File details come from the government source that posted it. Updated .