Building 1 Floorplan.pdf
PDF 158 KB Posted
- Attached to
- NEC-DA Fiber Optic Cabling Installation Federal contract opportunity
- Solicitation number
- W56HZV-22-R-L036
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Building 2 Floorplan.pdf | ||
| NEC-DA Fiber Optic Cabling Questions and Answers.docx | DOCX document | |
| W56HZV-22-R-L036 U0001.pdf | ||
| W56HZV-22-R-L036_V2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
VESTIBULE
1101-L-006
ELEVATOR LOBBY
1001-L-001
LOBBY
1102-L-007
PHONE/IT
MAIL CART
1005-X-001
COPY/FAX/SHREDDER
1007-X-001
ELECTRICAL
1010-U-002
FIRE COMMAND
1306-U-009
MEN'S TOILET
1011-R-001
WOMEN'S TOILET
1020-R-002
ELEVATOR LOBBY
SERVICE
1021-L-005
RECEIVING AREA
1210-U-006
VESTIBULE
1401-L-015
CORRIDOR
1404-L-016
ROOM
TELECOMMUNICATIONS
CLASSROOM
1403-T-002
CORRIDOR
1405-L-017
CLASSROOM
1406-T-003
VENDING
1408-B-002
STAIR NORTH
1006-L-002
ELECTRICAL ROOM
1301-U-007
CORR.
1304-L-014
SIPRNET
1003-Y-001
STORAGE
GENERAL
1009-S-002 C L
O S
E T
-S -0
ROOM
FIRE PUMP/MECH.
1302-U-008
VENDING
1407-B-001
E X
IT
P
A S
S A
G E
W A
Y
-L -0
EWC
UP
SUPPLY
JANITORIAL
1013-U-003
PHONE/IT
CONFERENCE L
1016-C-001
RECYCLING
1018-U-005
CORR.
1012-L-003
CORRIDOR
1104-L-008
ROOM
PUBLIC MEETING
1103-T-001
CONFERENCE L
1108-C-003
CONFERENCE L
1107-C-002
SHREDDER
COPY/FAX/
1202-X-002
CONFERENCE S
1203-O-001
OFFICE L
1204-O-002
OFFICE L
1206-O-003
OFFICE L
1207-O-004
EXIT PASSAGEWAY
1208-L-012
STORAGE
GENERAL
1209-S-004
S T
A
IR
S
O U
T H
-L -0
CLOSET
1201-S-003
CORRIDOR
1106-L-010
CORRIDOR
1109-L-011
RECEIVING AREA
1210-U-006
OPEN OFFICE
1205-P
CORRIDOR
1105-L-009
CAGE
STORAGE
LEISURE
TRAVEL
1303-S-005
WC-102
1014-U-004
WC-100
1402-U-010
WC-101
1002-U-001
COPIER
SAFE
C A
B
IN
E T
S T
O R
A G
E T
A L L
Michael.Bogacki Text Box Bldg #2 Bldg #1
Michael.Bogacki Text Box Enclosed Passage way
Michael.Bogacki Text Box Fire rated conduit sleeve is required for wall penetration in passage way.
Michael.Bogacki Line
Michael.Bogacki Line
Michael.Bogacki Line
Michael.Bogacki Line
Michael.Bogacki Line
Michael.Bogacki Line
Michael.Bogacki Text Box Proposed SM Fiber Run
Michael.Bogacki Line
Michael.Bogacki Text Box
Michael.Bogacki Text Box Proposed 24 Strand Single Mode Fiber cable pull from building #1 to building #2. Estimated length of run is 650 feet for horizontal run. Vertical run for 6 strand Single Mode Fiber in building #2 is estimated at 150 feet.
Michael.Bogacki Line
File details come from the government source that posted it. Updated .