AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0002 2022DEC19
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
RONALD THENN
EMAIL: RONALD.N.THENN.MIL@ARMY.MIL
W56HZV-21-R-0202
2022SEP30
X
X 2023JAN17 05:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 12
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: RONALD THENN
Buyer Office Symbol/Telephone Number: CCTA-ALM-B/(571)588-9378
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
Amendment 0002 to solicitation W56HZV-21-R-0202
The purpose of this amendment is:
1. The hour and date specified for receipt of offers is extended to Tuesday, 17 January 2023 at 05:00pm EST.
2. Update Attachment 10 Technical Data Package as follows:
a. Add DTL-12680019 to TDPs 22ENG008A, 22ENG008B, 22ENG008E, and 22ENG008G.
b. Add MIL-T-70711A, rev A, dated 16MAY2022 to TDPs 22ENG008A and 22ENG008B.
c. Remove references in the TDPs to DTL-13009240 and QAP 13009238 as they are not needed for this solicitation.
d. Add buffer drawings to TDPs 22ENG008A, 22ENG008B, 22ENG008E, and 22ENG008G.
e. Add an Engineering Change Proposal to update packing and marking information for the M19E1 tile in TDP 22ENG008E and 22ENG008G.
f. Update file PRON22ENG008A Sect C and PRON22ENG008B Sect C because some of the previous notes in these files have been incorporated into the TDP update.
g. Remove file PRON22ENG008E Sect C and PRON22ENG008G Sect C because the previous notes in these files have been incorporated into the
TDP update.
3. Update Section L.5.1 and L.5.1.1 Joint Venture language as follows:
From:
L.5.1 Signature Actions/offeror Fill-Ins. Provide a scanned image of a signed copy of the SF33 cover page, a copy of all completed fill-ins for Sections A through K, and (if applicable) a signed copy of all Amendments to the solicitation. Pay particular attention to 52.247-60 GUARANTEED SHIPPING CHARACTERISTICS, E.5. INSPECTION AND ACCEPTANCE POINTS: ORIGIN, F.3 FOB POINT, and F.4 TRANSPORTATION
DATA FOR FOB ORIGIN OFFERS as that information will be used by the Government to calculate transportation costs. System for Award
Management (SAM) certifications need not be separately submitted; however, all offerors must be successfully registered and valid in
SAM prior to award.
To:
L.5.1 Signature Actions/offeror Fill-Ins. Provide a scanned image of a signed copy of the SF33 cover page, a copy of all completed fillins for Sections A through K, and (if applicable) a signed copy of all Amendments to the solicitation. Pay particular attention to
52.247-60 GUARANTEED SHIPPING CHARACTERISTICS, E.5. INSPECTION AND ACCEPTANCE POINTS: ORIGIN, F.3 FOB POINT, and F.4 TRANSPORTATION
DATA FOR FOB ORIGIN OFFERS as that information will be used by the Government to calculate transportation costs. System for Award
Management (SAM) certifications need not be separately submitted (except as noted in Section L.5.1.1 below); however, all offerors must be successfully registered and valid in SAM prior to award.
From:
L.5.1.1 Where certifications and approved systems are required for an offeror, if the proposal is being submitted by a Joint Venture, certifications and approved systems for the principals (partners) of the joint venture will be considered as valid for that offeror providing the necessary documentation from all principals (partners) is provided with the proposal.
To:
L.5.1.1 Where certifications and approved systems are required for an offeror, if the proposal is being submitted by a Joint Venture, certifications and approved systems for the principals (partners) of the joint venture will be considered as valid for that offeror providing the necessary documentation from all principals (partners) is provided with the proposal, except for the following: Pursuant to DARS Tracking Number: 2023-O0001 Class Deviation Verification of Eligibility of Small Business Joint Ventures: In lieu of using the
System for Award Management (SAM), a small business Joint Venture Offeror must submit the following required representations with its offer:
Paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial
Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program Representations, in accordance with 52.204-
8(d) and 52.212-3(b) for the following categories: (a) Small business; (b) Service-disabled veteran-owned small business; (c)
Womenowned small business (WOSB) under the WOSB Program; (d) Economically disadvantaged women-owned small business under the WOSB
Program; or (e) Historically underutilized business zone small business.
All other terms and conditions remain unchanged and in full force and effect.
2 12
W56HZV-21-R-0202
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0003 ***
3 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0010 TECHNICAL DATA PACKAGES 15-DEC-2022 EMAIL
4 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
SPECIAL NOTICE FOR SB SET-ASIDE:
This RFP is a 100% small business set-aside. Offerors are strongly encouraged to ensure that the offeror is a small business based on the size standard for the NAICS Code assigned to this RFP. Reference 13 CFR Part 121, and the clauses and relevant FAR references contained within this solicitation. Ensure that your firm fits the definition including but not limited to any affiliations (domestic or foreign). The Small Business Administration determines whether an entity qualifies as a small business concern by counting its receipts, employees, or other measures including those of all its domestic and foreign affiliates, regardless of whether the affiliates are organized for profit. 13 C.F.R. 121.103(a)(6). SBA has a specific set of rules that explain when another person, business or entity is considered an affiliate for size standard purposes. SBAs rules on affiliation for its programs (except SBIR and STTR) are found at 13
C.F.R. 121.103.
L.1 General Proposal Information
Offerors are cautioned to consult the Contracting Officer IN WRITING before submitting an offer that proposes any deviations or exceptions to any of the requirements, terms, and conditions of the solicitation because it may be cause for rejection of the proposal
(See Section M.2)
L.1.1 The proposal, subject to the Submission, Modification, Revision, and Withdrawal paragraph of Instructions to Offeror(s)Competitive
Acquisitions (FAR Provision 52.215-1) contained in Section L of the solicitation, shall be submitted in the format and quantities set forth below. All information necessary for the review and evaluation of a proposal is to be contained in the proposal volumes set forth below. Section M of the solicitation sets forth the evaluation criteria and delineates the Factors to be evaluated and their relative order of importance. The offeror's proposal, as required by this section, will be evaluated as set forth in Section M of this solicitation. The Government will not assume the offeror possesses any capability, understanding, or commitment not specified in its proposal. It is an offeror's responsibility to submit a well-written proposal, with adequately detailed information, which clearly demonstrates an understanding of and the ability to comply with the solicitation requirements to allow for a meaningful evaluation. The
Government does not assume the duty to search for data to cure problems it finds in proposals. Offerors should not assume data submitted for one Factor or Volume will be considered for the other Factors or Volumes of the proposal. However, the Government reserves the right to utilize this data in other areas of the evaluation at its sole discretion.
L.1.2 Minimum Acceptance Period.
This provision supersedes any language pertaining to the acceptance period that may appear elsewhere in this solicitation (e.g., SF 33
Box 12).
ACCEPTANCE PERIOD means the number of calendar days available to the Government for awarding a contract from the date specified in this solicitation for receipt of offers.
L.1.2.1. The Government specified minimum acceptance period of 270 calendar days.
L.1.2.2. The offeror shall clearly state in its proposal Administrative volume the acceptance period. Offerors may specify a longer acceptance period than the Government's minimum acceptance period stated above.
L.1.2.3. An offer allowing less than the Government's minimum acceptance period, or fails to provide a proposal acceptance period, may be rejected.
L.2 UNCLASSIFIED Proposal Content, Format and Instructions
The offerors proposal shall be UNCLASSIFIED. The following instructions are for UNCLASSIFIED proposals only:
L.2.1 Proposal Content
L.2.1.1 All proposals shall be in English (American Standard) and shall be in US dollars. Proposals not in English (American Standard) or in US Dollars may be rejected. The proposal shall include all information specified and shall address all requirements outlined in
Section L. The offeror's proposal shall be organized in the following volumes.
Volume
Number Title
Volume 1 Technical Experience Factor (Section L.4.1)
Volume 2 Price Factor (Section L.4.2)
Volume 3 Administrative (Section L.5.1)
NOTE: Some proposal volumes contain page limitations which are specified further within Section L instructions below. Offerors are cautioned that the Government will not review any pages beyond the stated page limits.
5 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.2.1.2 A Proposal Executive Summary or transmittal letter is optional. It will neither be considered as part of the volumes required, nor will it be evaluated. If a Proposal Executive Summary is submitted, it should be no more than five pages in length and be submitted as part of the Administrative volume.
L.2.2 Proposal Method of Submission, Format, and Instructions
L.2.2.1 Method of Submission: The proposal shall be electronically submitted via E-mail to the Contract Specialist, MAJ Ron Thenn, and cc the Contracting Officer, Sarah Teschler, at the following e-mail address(s) with the subject header:
Proposal Submission - W56HZV-21-R-0202 (company name):
Contract Specialist: ronald.n.thenn.mil@army.mil
Contracting Officer: sarah.j.teschler.civ@army.mil
L.2.2.1.1 Fax, hardcopy, and DVD/CD-ROM proposals will NOT be accepted. Hand-carried offers, whether hardcopy or electronic, will NOT be accepted. Other electronic submission methods (i.e., SAM.GOV or DoD SAFE) will NOT be accepted.
L.2.2.1.2 In accordance with FAR 15.208, it is the responsibility of the Offeror to ensure the proposal is received, in its entirety, at the required destination by the Due Date and Time for Receipt of Offers specified in the solicitation. There is no "expected" or
"target" length of time for proposal submission via email; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
L.2.2.1.3 Maximum size of each e-mail shall be 10 megabytes. The offeror may use multiple e-mail messages for each submission, however, it should annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of
3.
L.2.2.2 Proposal Format and Instructions
L.2.2.2.1 Each submitted File shall be labeled and named so it is identifiable for which volume it pertains (example: Volume 2, Price
Factor)
L.2.2.2.2 Electronic Files. The proposal electronic files names should not exceed 50 characters in length (not including the file extension). Ensure the file name does not contain any periods, does not contain spaces, and does not contain special characters, which should limit Government virus scanners rejecting the email as unscannable.
L.2.2.2.3 Acceptable File Formats. All electronic information provided in response to the solicitation must be provided in Microsoft
(MS) Office 2013 compatible or Adobe Portable Document Format (PDF) format or except as noted in instructions for individual volumes.
For files in PDF format, scanners should be set to 200 dots per inch. The proposal shall not contain citations for, or active links to live Internet sites or pages. All information shall be contained within the electronic proposal. Any linked or referenced information that is not contained in the proposal will not be accepted.
L.2.2.2.4 Unless otherwise specified, it is recommended that the proposal be formatted for 8.5 inch x 11 inch paper with a minimum font size of 10 pt. and with a minimum of 0.5 inch margins. Schedules, drawings and other documents more appropriate to larger size should be formatted for no larger than 8.5 inch x 14 inch dimensions.
L.2.2.2.5 Provide spreadsheets that include all formulas, function, macros, computations, or equations used to compute the proposed amounts. For each workbook, all Rows, Columns, Cells, and Worksheets are to be visible. Do not include Zero height and zero width rows and columns in Worksheets. Do not format Worksheet cells with the font color equal to the fill color. If Workbooks or Worksheets are password protected, then the passwords must be provided. Do not submit Print image files or pictures or files containing only values.
Failure to provide fully functional excel spreadsheets in the proposal may result in the proposal being rejected (See Section M.2.1
(a)).
L.2.2.2.6 The offeror shall make every effort to ensure that the proposal is virus-free. Proposals (or portions thereof) submitted which indicate the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as
"unreadable" as described in FAR 15.207(c).
L.2.2.3 Submission Due Date
The offeror must ensure its proposal, in its entirety, reaches the required destination before the Offeror Due Date and Time established in this solicitation.
L.2.2.3.1 Lateness
The lateness rules for submitted proposals are outlined in FAR 52.215-1 "Instructions to Offerors-Competitive Acquisition and are incorporated into this solicitation.
6 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.2.3 Single Proposal Submission
Offerors are limited to submitting one proposal with one approach to meeting the requirements of this solicitation. An offeror is defined as an entity competing independently that does not share a common parent with any other offeror or does not have a parent/subsidiary relationship with any other offeror or is not affiliated with any other offeror. For this section L.2.3 the Government will consider Affiliation to exist if associated business concerns or individuals, directly or indirectly, either controls the other or can control the other (control can exist through common ownership, common management, or a contractual relationship such as a joint venture, where members have the power to control performance of the contract); or a third-party controls or can control both.
L.2.4 Organizational Conflict of Interest
L.2.4.1 The provisions of FAR 9.5, Organizational Conflict of Interest (OCI), apply to any award under this Request For Proposal (RFP).
Potential offerors should review their current and planned participation in any other Government contracts or Government agreements
(which include OTAs, CRADAs, Public-Private Partnerships, etc.), subcontracts, consulting, or teaming arrangements where they may be in a position of actual or perceived bias or unfair competitive advantage.
L.2.4.2 Offerors should disclose any potential OCI situations to the Contracting Officer as soon as identified including prior to proposal submission. The disclosure should include the facts and an analysis of the actual or perceived conflict and a recommended approach(s) to neutralize or mitigate the potential conflict. The preferred approach to potential conflicts is to negate/obviate the conflict. Mitigation is considered only if it is not practical to negate/obviate the conflict. The Contracting Officer will promptly respond to resolve any potential conflicts.
L.2.5 Export Controlled Information
This solicitation contains Export Controlled information. It is the responsibility of the offeror, not the Government, to obtain access, and to obtain any appropriate export licenses, process appropriate export license exemption necessary for authorization to share any such information with subcontractors who are foreign persons as defined in applicable export laws and regulations. The Government shall consider the failure or inability of an offeror to obtain access and, when applicable, obtain the appropriate export compliance documentation and provide that in its proposal as grounds for rejection IAW M.2. See Section A.4 DISTRIBUTION AND DESTRUCTION OF EXPORT
CONTROL TECHNICAL DATA PACKAGE for instructions on how to access Export Controlled information.
L.2.6 Classified Information
This solicitation includes classified information as referenced in section C.1.2. Offerors must obtain access to this data in order to meaningfully respond to the solicitation (Reference M.2.a). In order to receive a copy of the classified Appendices, Offerors must provide proof of valid Industrial Facilities Security Clearance at SECRET level by sending an email to:
"mailto:ronald.n.thenn.mil@army.mil " with the Company Name, address, Commercial and Government Entity (CAGE) Code, Facility CAGE
Code as per the National Industrial Security Program Operating Manual (NISPOM) DoD 5220.22-M, and basis of the need to know.
All requests for the Classified Appendices shall be received within 10 calendar days of RFP release. Requests received greater than 10 calendar days after the RFP release date may not be processed with enough time for the Offeror to submit a proposal which meaningfully responds to the RFP. The Offeror shall provide the contact information for the Facility Security Officer (FSO) in your response. Foreign respondents requests will not be considered.
L.3 All or None
Offers in response to this solicitation must be submitted for all the requirements identified in the solicitation. Offers submitted for less than all the requirements called for by this solicitation may be rejected or ineligible for award. Proposals that contain alternative terms and conditions may be considered as taking exception to the requirements of the solicitation. See Section M.2.
L.4 Evaluation Factors
Offeror proposals shall address the following Factors:
a. Technical Experience Factor
b. Price Factor
L.4.1 Volume 1 Technical Experience Factor Proposal
L.4.1.1 General Information: The below instructions are provided to advise offerors as to the information required by the Government to assess the contractors proposed experience. It is the offeror's responsibility to submit detailed and complete information as required so the Government may evaluate its Technical Experience volume, and imperative that the offeror present its experience in a clear and complete manner. Failure to provide the applicable information may result in an assessment that the referenced experience lacks comparability or recency and be discounted in the evaluation. The Government does not assume the duty to search for data to cure problems it finds in proposals. The burden of providing thorough and complete information remains with the offeror.
7 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.4.1.2 Page Limit: A 12-page limit applies to part of this Volume submission. The page limit only applies to the written narrative(s) required in L.4.1.6. Any substantiating documents submitted in response to Section L.4.1.6. will not be counted in this page limit (Copy of Contract sections, other substantiating documents in response to L.4.1.6.2.1, L.4.1.6.3.1, or L.4.1.6.4.1, etc.).
L.4.1.3 Definition of Contract for the Technical Experience Factor: For the purpose of this Factor, a Contract is defined as a written instrument that requires the performance of a distinct effort and demonstrates the distinct effort was actually performed.
Indefinite Delivery Contracts (FAR 16.5), Basic Ordering Agreements (BOA), Blanket Purchase Agreements (BPA), and Federal Supply
Schedules (FSS) are written instruments that typically DO NOT demonstrate actual performance, and as such, would not meet the definition of a Contract. Written instruments considered to demonstrate actual performance may include a single task or delivery order, a single work directive/technical instruction, or a single definite quantity contract provided it demonstrates a distinct effort was actually performed. An offeror may submit, or the Government may require, written instruments that enhance the Governments understanding of the distinct effort actually performed if it is not identified on the Contract itself. It is incumbent upon the offeror to demonstrate that a distinct effort was actually performed.
L.4.1.4 Recent experience is defined as tasks completed on a recent Contract (as defined by L.4.1.3 above). Recent Contract(s) are those performed within fourteen years of the date of issuance of this Request for Proposal (RFP). The offeror is limited to only proposing one Contract submission for each criteria consideration in L.4.1.5. Each Contract must have been performed by the offeror as the prime contractor. In this context, prime contractor is the party that executes an agreement with another party to perform work. The prime contractor of the submitted Contract is NOT required to be a U.S. Government contract holder. Private industry Contract(s) (e.g., an agreement between U.S. Government contract holder and its subcontractor) may be considered as the proposed experience. The Government will not consider the experience of individuals, key personnel, or subcontractors; only corporate experience will be considered.
L.4.1.5 Recent experience will be assessed for comparability in scope against the following criteria considerations:
#1: Development or production of armor tiles that include explosive materials.
#2: Delivery of inert armor tile components, not including standard commercial off the shelf hardware, which can include armor panels, plates or tiles at a delivery rate of 1,000 per month.
L.4.1.6 Technical Experience Proposal Information Requested: For the Technical Experience Factor, the offeror shall substantiate recent experience by providing the requested information. The offerors proposal shall substantiate what executed work was performed under each proposed Contract submission.
L.4.1.6.1 Contract Information: Clearly identify each contract submission separately and provide the following information for each
Contract Submission:
(a) Prime Contractor Name and Address;
(b) Contract Number (and delivery/task order number if applicable);
NOTE: Only propose a single Order (i.e task/delivery order, work directive, technical instruction) for a proposed Contract submission if the effort is part of broader contractual instrument such as an Indefinite Delivery, BOA, BPA, FSS. See Section L.4.1.3 for definition of a Contract. If more than one Order is proposed as part of the same Contract Submission, the Government reserves the right to not consider that Contract Submission in the evaluation.
(c) Proposed criteria consideration from Section L.4.1.5 (#1 or #2)
NOTE: Offerors are reminded that they are limited to proposing one contract submission for each criteria consideration in Section
L.4.1.5. The Offeror may propose the same Contract for both criteria considerations if it chooses, however it will count toward the contract limit of each criteria consideration separately. The Government reserves the right to not consider a Contract submission that is not clearly identified to which criteria consideration it is being proposed, which may result in being assessed with higher risk.
(d) Contract Period of performance;
(e) Government or Industry contracting activity address;
(f) Procuring Contracting Officers (PCO) or point of contact for private industry entity responsible for signing or administering the contract, telephone number and e-mail;
(g) Copies of the Contract pages or sections that demonstrate the following: Contract number, date of Contract execution, Identification of the contract parties, Period of Performance, and Performance Work Statement (PWS) or Scope of Work (SOW);
(h) The offeror shall provide a written narrative that shall be specific only to the work performed on the proposed Contract(s) submission as it relates to the proposed criteria consideration listed in Section L.4.1.5. Note: Do not provide a breakdown of comparability of all past Contract requirements to all current RFP requirements, only discuss the comparability the executed work performed to the criteria consideration identified in L.4.1.5. When citing specific work performed on the proposed Contract submission, provide references to the specific locations within the scope or other substantiating documents, such as paragraph or page number, when possible. When applicable, in its description, the offeror should specify the location in the proposal (to include filename or document reference with page and paragraph of the past contract information) that further substantiates comparability if stand-alone attachments are submitted in this volume; and
(i) An offeror may submit additional documentation, such as related contractual instruments that enhance the Governments understanding of the contract deliverables and/or work performed if it is not identified on the Contract itself. It is incumbent upon the offeror to substantiate what work was actually performed.
8 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.4.1.6.2 Associated Corporate Entities. The Government may consider the experience of an associated entity if the offeror successfully demonstrates meaningful involvement by the associated entity in the proposed effort.
L.4.1.6.2.1 An associated entity may include a parent company, separate corporate division within the same parent company, subsidiary company, a legally affiliated company, etc. The offeror shall provide to the Government a narrative that explains the offerors relationship to the associated entity. The offeror shall support the narrative with legal documentation, including but not limited to corporate papers, establishing the legal nexus between the offeror and the associated entity.
L.4.1.6.6.2 The offeror shall provide to the Government a narrative that explains the meaningful involvement the associated entity will provide to the proposed effort. Evidence of meaningful involvement may include a description of the associated entitys resources, such as its workforce, facilities, and/or other resources that will be provided or relied upon in the proposed effort. A Contract will not be considered unless the offeror successfully establishes meaningful involvement by the associated entity in the proposed effort.
L.4.1.6.3 Predecessor Companies. The Government may consider the experience of a predecessor company if the offeror demonstrates the experience of the predecessor company is reasonably predictive of the offerors performance under the proposed effort.
L.4.1.6.3.1 A predecessor company may include a company which was acquired by the offeror or merged with the offeror. It may also include other instances where the predecessor company was reorganized, restructured, or otherwise altered. A predecessor company does not include an entity which remains separate and distinct from the offeror. The offeror shall provide to the Government a narrative that explains the offerors relationship to the predecessor company. The offeror shall support the narrative with documentation evidencing the offerors status as the successor company.
L.4.1.6.3.2 Offeror shall provide to the Government a narrative that explains why the predecessors experience is predictive of the offerors performance under the proposed effort. Evidence may include, but is not limited to, continuity of operations such as the continued employment of the predecessors employees and the transfer of assets including buildings, furnishings, and fixtures.
L.4.1.6.4 Individual Partners of a Joint Venture. If the offeror is a Joint Venture, the Government may consider the experience of each partner of the Joint Venture and any work performed by the Joint Venture itself previously. The offeror must successfully demonstrate meaningful involvement by the partner to the proposed effort.
L.4.1.6.4.1 Offeror shall provide to the Government a narrative that discloses the individual partners of the Joint Venture and shall provide documentation evidencing the Joint Venture.
L.4.1.6.4.2 Offeror shall provide to the Government a narrative that explains the meaningful involvement the Joint Venture partner will provide to the proposed effort. Evidence of meaningful involvement may include a description of the partners resources, such as its workforce, facilities, and/or other resources that will be provided or relied upon in the proposed effort. A Contract will not be considered unless the offeror successfully establishes meaningful involvement by the partner in the proposed effort.
L.4.2 Volume 2 - Price Factor
In accordance with FAR 15.403-5(a)(1), certified cost or pricing data is not required for initial proposal submission. However, after initial proposal submission, if only one offer is received, the Government reserves the right to request certified cost or pricing data in accordance with DFARS 252.215-7008. In the event certified cost or pricing data is required, the offeror may submit a written request for exception based on the applicable clauses contained herein.
For initial proposal submission, provide the data other than certified cost or pricing data outlined below.
L.4.2.1 Attachment 0005 Pricing Workbook:
Submit your completed Attachment 0005 - Pricing Workbook with your proposal. Complete the attachment in accordance with the instructions included within the attachment. Propose Firm-Fixed-Prices for all CLINs included in the Attachment. Submit the attachment in Microsoft Excel format. Do not enter any proposed prices into Section B of the RFP.
L.4.2.1.1 Range Pricing:
For each CLIN with range pricing, propose a unit price for each range shown in Attachment 0005. The offeror may enter the same unit price for all ranges if desired.
L.4.2.2 Top-Level Spreadsheets:
For each CLIN in Ordering Period 1 (CLINs 0011, 0021, 0031, etc.), provide a top-level spreadsheet that details the proposed unit price by cost element (i.e., Direct Labor Hours by labor category, Direct Labor Cost by labor category, Subcontracts, Direct Material, Other
Direct Costs, Indirect Costs by category (to include overhead and G&A), FCCM, and Profit). For CLINs with range pricing, the top-level spreadsheet is to support the proposed (unit or total) price for the range with the highest weighting (as identified in Attachment 0005.
The cost breakdown is to be consistent with your cost accounting system. The proposed price identified in the top-level spreadsheet is to equal the proposed unit price identified in Attachment 0005 Pricing Workbook. Provide the following information in support of each top-level spreadsheet:
9 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.4.2.2.1 Material and Subcontracts:
In support of the costs identified as material and subcontract costs in the offerors top-level spreadsheet, provide a narrative which explains the method used to develop proposed cost, including information about the extent to which the cost is based on vendor quotes, purchase order history, estimates, or any other information necessary to substantiate the proposal.
In addition, provide a Bill of Material (BOM) with the following information:
(1) Cost Element Name as identified in the offerors top-level spreadsheet
(2) National Stock Number (NSN), as applicable
(2) Part Number, as applicable
(3) Item Name/Description/Brief Description of the Work to be performed
(4) Vendor
(5) Unit Cost (purchase price to Offeror)
(6) Quantity used
(7) Extended Cost (unit cost multiplied by quantity used)
(8) Basis for cost (engineering estimate, vendor quote, purchase history, etc.)
(9) Indicate whether component is sole-source, competitive, or commercial
L.4.2.2.2 Other Direct Costs (ODCs):
In support of the costs identified as ODCs in the offerors top-level spreadsheet, identify each category of proposed ODC (to include travel), and provide the proposed cost for each category. Provide an explanation of what is included in each category and how the cost for each ODC was estimated.
L.4.2.3 The Government reserves the right to request additional or more detailed information to support its price evaluation.
L.4.2.4 Use of Existing Government-Furnished Property (if applicable):
L.4.2.4.1 If the offeror is proposing to utilize Government-Furnished Property (GFP) that it received on another Government contract in performance of this contract on a rent-free basis, then the offeror must provide a list of GFP that includes the following for each item:
- Acquisition cost;
- Age;
- Type of GFP;
- The accountable contract under which the property is held;
- The dates during which the property will be available for use (including the first, last, and all intervening months) and, for any property that will be used concurrently in performing two or more contracts, the amounts of the respective uses in sufficient detail to support prorating the rent;
- Evidence that it obtained authorization for its rent-free use from the contracting officer having cognizance of the property; and
- Any additional information required in accordance with Attachment 0004 Use of Existing Government-Furnished Property.
L.4.2.4.2 The offeror is to obtain any data required from the cognizant contracting officer necessary to determine the GFP Price
Adjustment calculated in accordance with Attachment 0004 Use of Existing Government-Furnished Property.
L.4.2.4.3 The offeror shall identify the total GFP Price Adjustment (for all classifications of property) that it calculated in accordance with Attachment 0004 Use of Existing Government-Furnished Property, and provide all calculations showing how the total GFP
Price Adjustment was developed. If applicable, the offeror is to also identify the rationale for any allocations to each CLIN.
L.5 Administrative Volume. In addition to the proposal evaluation factor volumes above, provide the following information:
L.5.1 Signature Actions/offeror Fill-Ins. Provide a scanned image of a signed copy of the SF33 cover page, a copy of all completed fill-ins for Sections A through K, and (if applicable) a signed copy of all Amendments to the solicitation. Pay particular attention to
52.247-60 GUARANTEED SHIPPING CHARACTERISTICS, E.5. INSPECTION AND ACCEPTANCE POINTS: ORIGIN, F.3 FOB POINT, and F.4 TRANSPORTATION DATA
FOR FOB ORIGIN OFFERS as that information will be used by the Government to calculate transportation costs. System for Award Management
(SAM) certifications need not be separately submitted (except as noted in Section L.5.1.1 below); however, all offerors must be successfully registered and valid in SAM prior to award.
L.5.1.1 Where certifications and approved systems are required for an offeror, if the proposal is being submitted by a Joint Venture, certifications and approved systems for the principals (partners) of the joint venture will be considered as valid for that offeror providing the necessary documentation from all principals (partners) is provided with the proposal, except for the following: Pursuant to DARS Tracking Number: 2023-O0001 Class DeviationVerification of Eligibility of Small Business Joint Ventures: In lieu of using the
System for Award Management (SAM), a small business Joint Venture Offeror must submit the following required representations with its offer:
Paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial
10 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program Representations, in accordance with 52.204-
8(d) and 52.212-3(b) for the following categories: (a) Small business; (b) Service-disabled veteran-owned small business; (c) Women-owned small business (WOSB) under the WOSB Program; (d) Economically disadvantaged women-owned small business under the WOSB Program; or
(e) Historically underutilized business zone small business.
L.5.1.2 Joint Venture (JV): To be recognized as a JV and eligible for award, the membership arrangements of the JV must be identified, and the company relationships fully disclosed in the offeror's proposal IAW FAR 9.603. A copy of the agreement establishing the JV must contain the signatures of all of the members comprising the JV.
L.5.2 The offerors proposal acceptance period in terms of calendar days from the date for receipt of offers is specified in the RFP.
(See Section L.1.2)
L.5.3 Statement of Acknowledgement. A statement specifying the extent of agreement with all terms, conditions, and provisions of the
RFP, and a statement of agreement to furnish and deliver the items or perform services set forth in the RFP in consideration for offerors proposed price(s) set opposite each item. Any exceptions taken to the attachments, exhibits, enclosures, or other solicitation terms, conditions, or documents may be determined to be a Deficiency or grounds for the Government to reject the proposal from further consideration in the source selection process (Reference M.2.1).
L.5.4 Assumptions. The offeror shall consolidate and identify all offeror's generated "assumptions" contained anywhere in the proposal.
The offeror shall include a statement that none of the "assumptions" contradict or take exception to any terms, conditions, or requirements of the solicitation. Any exceptions taken to the attachments, exhibits, enclosures, or other solicitation terms, conditions, or documents may be determined to be a Deficiency or grounds for the Government to reject the proposal from further consideration in the source selection process (Reference M.2.1).
L.5.5 Organizational Conflict of Interest (OCI). The offeror shall provide an affirmative statement that the offeror does not have an
OCI as it applies to this solicitation. (Reference L.2.4)
L.5.6 Property Management Plan.
L.5.6.1 If Government Property (as defined in 52.245-1) will be utilized in the performance of this contract, the offeror is required to submit a Property Management Plan (PMP) with their proposal that is consistent with the requirements of the solicitation. The PMP shall address the following:
L.5.6.1.1 An overview description of the contractors Property Management System (PMS).
L.5.6.1.2 The purpose of the offerors PMS, specifying what laws, regulations, and/or instructions it complies with.
L.5.6.1.3 Describe the scope of the assets that are applicable to the offerors PMS.
L.5.6.1.4 The PMP must address the ten (10) outcomes of Government Property requirements, as required by FAR 52.245-1(f)
a) Acquisition of Property
b) Receipt of Government Property. If the contract has Item Unique Identification (IUID) requirements, the PMP must address these requirements.
c) Records of Government property
d) Physical inventory
e) Subcontractor control
f) Reporting Requirements: Please also describe intervals, format of reports, who/whom they will be reported to, how they will be delivered (Email, Hard Copies))
g) Relief of stewardship responsibility and liability
h) Utilizing Government property
i) Maintenance
j) Property closeout
L.5.6.1.5 Describe any additional standards (e.g., customary commercial practices, voluntary consensus standards, industry leading practices) that the contractor intends to use in the management of Government Property, and how they are applicable to the tasks being
11 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
performed on the effort.
L.5.6.2 If the solicitation does not already include 52.245-1 and the offeror proposes to utilize existing Government Property during contract performance, then 52.245-1 will be included in any resulting contract.
L.5.7 Facility Clearance. Include documentation demonstrating, as applicable, that the offeror and Subcontractors have a Facility
Clearance (FCL) for any location that will handle classified material. Offerors must submit documentation indicating their facility has been granted a SECRET FCL. Offerors who are considering a subcontractor must also submit documentation indicating that its subcontractor has obtained the necessary clearance in order to be considered for award for those subcontractors that will handle classified material.
L.5.8 Assertion of Restrictions. The Offer shall include in its proposal an Assertion of Restrictions IAW H.1.1 (including any assertions of its subcontractors or suppliers), dated and signed by an official authorized to contractually obligate the offeror.
L.5.9 Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives (AA&E). Include documentation demonstrating, as applicable, that the offeror and Subcontractors (if applicable) are in compliance with DoD Manual 5100.76 for any location that will handle AA&E. Documentation can includes, but not limited to, Structural adequacy of production and storage facilities, Contractor's
Standard Practice Procedures (SPP) Plan, Contractor's AA&E Production Line Security Procedures Plan, Contractor's written Accountability
Plan, any previous Facility Suitability Determinations, and any other relevant documentation.
L.6 HQ-AMC LEVEL PROTEST PROCEDURES
Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal-Resources/
An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.
*** End of Notice ***