W56HZV20R0184-0001.pdf
PDF 47 KB Posted
- Attached to
- 50 Cal. Blank Firing Attachment
- Solicitation number
- W56HZV-20-R-0184
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV20R0184-0002.pdf | ||
| Questions Answers - W56HZV-20-R-0184 50 Cal B Firing Attachment EH0C0357EH.xlsx | XLSX spreadsheet | |
| Solicitation W56HZV-20-R-0184 - CLOSES 6.30.22.pdf | ||
| Files to view 2D-3D Files.doc | DOC document | |
| Attachment 0003 Property Management System Analysis.docx | DOCX document | |
| Attachment 0001 Government Furnished Property.xlsx | XLSX spreadsheet | |
| Attachment 0002 First Article - Waiver Worksheet.pdf | ||
| Solicitation - W56HZV-20-R-0184.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2022JUN30
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
CHERYL A. GALLAGHER
EMAIL: CHERYL.A.GALLAGHER13.CIV@ARMY.MIL
W56HZV-20-R-0184
2022MAY26
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 15
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: CHERYL A. GALLAGHER
Buyer Office Symbol/Telephone Number: CCTA-APD-D/(586)282-1345
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
SOLICITATION: W56HZV-20-R-0184
AMENDMENT: 0001
1. Amendment 0001 to Solicitation W56HZV-20-R-0184 is issued to incorporate the following changes:
SECTION B:
a) Delete CLIN A002 Radioactive Wipe Test (RWT) Results.
SECTION C:
b) Delete CDRL A002 RWT Results from paragraph C.7. As a result, the following CDRL numbers have changed:
FROM: TO:
A003 A002 Test Procedure Phosphate Coating
A004 A003 Start of Work Meeting Minutes Report
A005 A004 First Article Test Report (FATR)
A006 A005 Government Furnished Material Consumption Report
A007 A006 Property Management Plan
SECTION E:
c) Remove paragraph E.6 Wipe Testing Requirements for Newly Procured Radioactive Commodities. As a result, the remaining paragraphs in
Section E have been renumbered as follows:
FROM: TO:
E.7 E.6 Rework and Repair of Nonconforming Material
E.8 E.7 Acceptance Inspection Equipment
E.9 E.8 Use of MIL-STD 1916
SECTION J:
d) Remove CDRL A002 from Exhibit A.
2. All other terms and conditions of Solicitation W56HZV-20-R-0184, other than those addressed by this Amendment 0001, remain unchanged and are in full force and effect.
*** END OF NARRATIVE A0002 ***
2 15
W56HZV-20-R-0184
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0014 DATA ITEMS __________
A002 DELETED _______
3 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 TECHNICAL DATA PACKAGE INFORMATION __________________________________
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ X ] 2. The TDP for this solicitation resides within the Beta System for Award Management (SAM) (https://beta.SAM.gov ) associated with this solicitation number: W56HZV-20-R-0184
To access the data through Beta.SAM:
C.1.1 Log on to the Beta.SAM web site: https://beta.SAM.gov .
C.1.2 Search for the solicitation number.
C.1.3 Click on the attachment you would like to view.
C.1.4 If the attachment is restricted, request access to the document.
C.1.4.1 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act
(Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
C.1.4.2 Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
C.1.4.3 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical
Data Agreement on file with Defense Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
C.1.5 Upon completion of the purposes for which Government Technical Data has been provided, the
Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
C.1.6 If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. Beta.SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
C.1.7 If multiple individuals in the contractors organization need access to the Technical Data Package
(TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ . The SAM helpdesk phone number is
(866) 606-8220. Vendors are responsible for placing correct information in Beta.SAM.
C.1.8 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
C.2 START OF WORK MEETING _____________________
C.2.1 The contractor shall hold a virtual start of work meeting, within 15 days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort.
C.2.2 The contractor shall participate with Government to arrange a schedule and agenda for the meeting. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel (Contracting Officer's Representative (COR) identified in Section G or in an appointment letter, Quality Assurance personnel, 4 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DCMA, etc.) may be invited to the meeting. All Government invitees shall be given at least 7 days advance notice by email of the time, date, and virtual method of the start of work meeting. The contractor shall provide the Government with minutes of the Start of Work
Meeting IAW CDRL A004 - Start of Work (SOW) Meeting Minutes Report.
C.3 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN __________________________________________________________
C.3.1 The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government
OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
C.3.2 The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
C.3.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
OPSEC Level I certified.
C.4 OPSEC TRAINING REQUIREMENT __________________________
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm . Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers Representative (COR), if assigned to the contract, or the Procuring
Contracting Officer (PCO).
C.5 HEAVY PHOSPHATE COATING REQUIREMENT ___________________________________
The following requirements regarding heavy phosphate coatings are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification MIL-DTL-16232.
C.5.1 Paragraph 3.1 of MIL-DTL-16232 refers to "Preproduction Inspection." The procedure shall be submitted in accordance with CDRL
A003 - Test Procedure for Phosphate Coating contained in Section J of the contract. The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail.
C.5.2 Paragraph 3.2.5-c of MIL-DTL-16232 refers to the "Chromic acid rinse, (Classes 1, 2 and 3)." The final rinse shall be checked by a standard free and total acid titration along with a pH reading "prior to starting production and at least every 8 hours thereafter."
C.5.3 Paragraph 4.7.3 of MIL-DTL-16232 refers to "Weight per unit area of phosphate coatings." The frequency for testing coating weight is "per lot, at least every 8 hours."
C.5.4 Paragraph 4.7.5 of MIL-DTL-16232 refers to "Accelerated corrosion resistance." Accelerated corrosion resistance shall be determined in accordance with 4.7.5.1. The frequency for testing accelerated corrosion resistance per ASTM B117 is "per lot, at least every 8 hours."
C.5.5 The "product name" along with the manufacturer of the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure and shall be traceable to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at
Assist Online. QPD products may be obtained at the quick search site, type the specification number (i.e., 3150) in the second block and click the "Submit" button. Then click on the specification (i.e., MIL-PRF-3150). In the next screen, click on the word "Qualification".
To obtain MIL Specs, MIL Standards, QPL and QPD products see <"https://assist.dla.mil/online/start / ">.
To obtain MIL Specs, MIL Standards, QPD products see <"https://assist.dla.mil/online/start/ ">.
C.5.6 A thickness range for the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure along with a frequency for testing. A daily frequency is required.
C.5.7 Heat cured dry film lubricant shall be air dried for 1.0 hour (until dry to touch) after dipping/spraying or flash dried at 155-
175 degrees F for 10-30 minutes and then heat cured at a temperature of 375-425 degrees F for 55-65 minutes per paragraph 4.4.2.2 of MIL-
PRF-46010.
C.5.8 Air cure dry film lubricant shall be air dried at room temperature for 24 hours minimum.
C.5.9 Adhesion testing shall be stated in the procedure for a supplemental coating of dry film lubricant per ASTM D2510 or CARC paint per ASTM D3359, method B along with the frequency for testing. A daily frequency is required.
5 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.5.10 Salt spray testing of parts with phosphate and supplemental dry film lubricant per ASTM B117 for 100 hours shall be stated in the procedure along with the frequency for testing. The frequency for testing is "per lot or weekly." Parts shall show no more than 3 rust spots per 3" x 6" area with none larger than 1.0mm in diameter. Salt spray testing of parts with phosphate and primer per ASTM B117 for
336 hours shall be included in the procedure for supplemental coatings of CARC paint along with a frequency for testing. The frequency for salt spray testing is "per lot or monthly." Parts shall show no visible rust exceeding rust grade no. 9 per ASTM D610, no more than
5 blisters per 4" x 6" area with none larger than 3/64 inch in diameter. Under film attack at the scribe shall not exceed 1/8 inch.
C.5.11 Topcoat color shall be visual/equipment checked against the specified chip no. of SAE AMS-STD-595 per paint batch. The procedure shall include the specified color chip number.
C.5.12 Cure of the paint shall be checked daily by solvent wipe per paragraph 4.2.3.2 of MIL-DTL-53072. The manufacturer of the MEK solvent shall be stated in the procedure.
C.6 CONFIGURATION MANAGEMENT DOCUMENTATION ______________________________________
C.6.1 The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.
C.6.2 Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
C.6.3 Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.
C.6.4 All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
C.6.5 For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e (iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
C.6.5.1 Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph
3.3.1 of EIA-649-1 for ECPs.
C.6.5.2 Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph
3.3.2 of EIA-649-1 for RFVs.
C.6.5.3 Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph
3.3.4 of EIA-649-1 for NORs.
C.6.5.4 Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.
C.6.6 Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.
C.6.7 The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.
C.7 CONTRACT DATA REQUIREMENTS LIST _______________________________
The contractor shall prepare the following deliverable reports in accordance with Exhibit A, Contract Data Requirements List:
A001: Acceptance Inspection Equipment (AIE) Report
A002: Test Procedure - Phosphate Coating
A003: Start of Work (SOW) Meeting Minutes Report
A004: First Article Test (FAT) Report
A005: Government Furnished Material (GFM) Consumption Report
A006: Property Management Plan
6 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Refer to Exhibit A included within this solicitation and resulting contract for specific requirements for each report.
C.8 ENGINEERING EXCEPTIONS ______________________
There is an engineering exception for the Firing Attachment, Blank Ammo, M19 NSN: 1005-01-091-7510. Please refer to C.1 Technical Data
Package Information for directions on accessing the TDP/engineering exceptions.
C.9 Total Asset Visibility Contractor (TAV-C)
C.9.1 Army Materiel Command (AMC) and its units use Total Asset Visibility Contractor (TAV-C) capability in its Logistics Management
Program (LMP) to account for Government Furnished Equipment, Materiel, or Property (GFE/M/P) placed in the possession of contractors to support contracts for: 1) repair, modification, or upgrade work; 2) materials held for Stock, Store and Issue (SSI), or 3) New
Production. Accounting records within LMP for this inventory are subject to verifying physical inventories and audits by the Army to ensure accuracy. This section addresses contractor requirements for production of new items contracts.
C.9.2 System Overview and Portal Access Requirements
C.9.2.1 To use TAV-C, Contractors shall request one of two TAV-C access methods below to exchange required inventory data with LMP: 1)
Defense Logistics Management Standards (DLMS) interface or 2) the Army TAV-C Portal. Approval of the contractors access method will be based first on the type of work being performed, second, the sufficiency of the contractors existing property accountability and connectivity to LMP, and third, request by the to use the portal based on economic factors.
C.9.2.2 Contractors shall choose between the two methods for accounting for government property as further described below:
C.9.2.2.1 Defense Logistics Management Standards (DLMS) interfaces: Contractors that have accounting systems capable of using a DLMS interface (see: DLM 4000.25, Defense Logistics Management Standards (DLMS) on the Defense Logistics Agency (DLA) website) shall request to use their accounting system and interface to account for Government Furnished Equipment/Materiel/Property (GFE/M/P) using DLMS transactions.
NOTE: If a contractor does not currently have an established DLMS interchange with Defense Logistics Agency (DLA) Defense Automated
Addressing System (DAAS), it will be the contractors responsibility to contact DAAS to establish access to DAAS messaging system to support the exchange of DLMS transactions with the Army. DAAS provides a value added service for standard Military Standards (MILS) transactions providing the ability to receive, edit and route logistics transactions for the Military Services and Federal Agencies.
Information on DAAS can be found at https://www.dla.mil/HQ/InformationOperations/DAAS/
C.9.2.2.2 Army TAV-C Portal: Contractors who, during negotiation with the government, are determined to be allowed to use the TAV-C
Portal, will comply with prescribed processes to provide qualified workers to access the system to exchange data with LMP.
C.9.2.3 Portal Access Requirements. Contractor personnel who input data into the TAV-C Portal, must meet qualification requirements specified in the TAV-C Portal Guide Detailed Procedures and requirements are detailed in the attached TAV-C Portal Guide. These requirements include:
C.9.2.3.1 Contractor provided computer system: The contractor shall provide a computer system and internet connectivity that meets acceptable standards as identified in the TAV-C Portal Guide.
C.9.2.3.2 Security Requirements.
C.9.2.3.2.1 The government requires contractor personnel accessing the LMP system to possess either a United States Government Common
Access Card (CAC) or a Department of the Defense approved External Certification Authority (EAC). To apply for these credentials, contractor personnel must possess a soft certification from a security credentialing firm.
NOTE: At the time of this writing, the government has successfully used IdenTrust and WidePoint (formerly ORC) for satisfactory credentials. It is the contractors responsibility ensure operators accessing the portal have and maintain current credential and to comply with the selected vendors service contract requirements. These firms are provided as a courtesy and are not an endorsement for any firm by the U.S. Government.
C.9.2.3.2.2 Contractors will coordinate with the Contracting Officers Representative or designated government representative to complete required forms to obtain the CAC/EAC. This will require the above certification, forms of identification, etc.
C.9.2.3.2.3 User Training Requirements: TAV-C Portal user training is government provided and varies by the function performed. The training is online and completion of the training by each operator is required before accessing and using TAV-C.
C.9.2.3.3 Problem Resolution: LMP is a government owned and maintained system. The contractor shall notify the COR or designated government point of contact for system related issues and government resolution.
7 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.9.3 DLMS Transactions/Portal Data Requirements
C.9.3.1 For DLMS Transactions for production of new items contracts, the inventory management transactions to be provided to the government by DLMS interface are:
C.9.3.1.1 DLMS 527R Materiel Receipt Acknowledgement (MRA) Transactions (for GFM expected to be consumed).
C.9.3.2 For DLMS Transactions for production of new items contracts, the material receipt transactions to be provided to the contractor by the government via the DLMS interface are:
C.9.3.2.1 DLMS 527D Pre-positioned Material Receipt Document for stock in-transit to vendor.
C.9.3.3 Army TAV-C Portal: Contractors who, during negotiation with the government, are allowed to use the TAV-C Portal to exchange required data directly with LMP, will provide the following information via data inputs into LMP.
C.9.3.3.1 TAV-C Portal Requirements: Details on how data can be entered into LMP whether by LMP Portal or by other means will be provided as part of the government provided training.
C.9.3.3.2 The required data will be based upon the business process being performed. Inputs and input formats will be driven by the role performed for this work as directed in the contract.
C.9.3.3.3 The LMP Portal will provide to the contractor reports which will serve to inform the contractor and aid in work performance.
Details on the various reports and how they can be used will be covered as part of the government provided LMP Portal training.
C.9.3.4 Consumption Reporting: Quarterly reports on the consumption of parts provided and adjustments to inventories will be provided to the government as specified in accordance with CDRL A006 - Government Furnished Material (GFM) Consumption Reporting.
C.10 When any of the requirements are met, Contracting Officers will include the below PMP Solicitation Language in the solicitation requiring bidders submit a PMP with their proposal:
C.10.1 This solicitation requires the bidder submit a Property Management Plan (PMP) with their proposal in accordance with (IAW) CDRL
A007 - Property Management Plan. The intent of the PMP is for the bidder to provide a high level strategic overview of how they intend to manage Government Property in their possession. The submitted PMP will be reviewed by the contracting organizations Industrial
Property Management Specialist or Contracting Officer to ensure it meets PMP requirements. PMP review points include:
C.10.1.1 Does the PMP include an overview description of the contractors Property Management System (PMS)?
C.10.1.2 Does the PMP include the purpose of the contractors PMS? What laws, regulations, and/or instructions does it comply with?
C.10.1.3 Does the PMP include the scope of the contractors PMS? Does it include company assets, subcontractor assets, and/or customer assets (e.g. Government Property)?
C.10.1.4 Does the PMP address the ten (10) outcomes of Government Property?
C.10.1.4.1 Acquisition of Property
C.10.1.4.2 Receipt of Government Property
C.10.1.4.3 Records of Government property
C.10.1.4.4 Physical inventory
C.10.1.4.5 Subcontractor control
C.10.1.4.6 Reports
C.10.1.4.7 Relief of stewardship responsibility and liability
C.10.1.4.8 Utilizing Government property
C.10.1.4.9 Maintenance
C.10.1.4.10 Property closeout
8 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.10.1.5 If the PMP includes standards (e.g. voluntary consensus standards, industry leading practices) that the contractor intends to use in the management of Government Property, are they applicable to the tasks being performed on the effort? Were they made available to the Government for review purposes?
C.10.1.6 Does the PMP meet the requirements as specified in the solicitation, at a minimum?
C.10.1.7 Does the contractor adequately address all of the special points highlighted in the solicitation for this specific action?
C.10.1.8 Will the contract have Item Unique Identification (IUID) requirements? If so, does the PMP address how the contractor will meet these requirements?
C.10.1.9 Does the contractor address how it will meet the Government Property reporting requirements? (e.g., intervals, format of reports, who/whom they will be reported to, how they will be delivered (Email, Hard Copies)).
*** END OF NARRATIVE C0001 ***
9 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN ________________________________________
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.2 SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING) ________________________________________________________________________
E.2.1 In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
E.2.2 The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
E.2.3 The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
E.2.3.1 Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
E.2.3.2 Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
E.2.3.3 Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
E.2.3.4 Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
E.2.3.5 Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
E.2.4 Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
E.2.5 A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable) in accordance with CDRL A005 - First Article Test (FAT)
Report. The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided.
One copy of the First Article Test Report will be copy furnished to the PCO.
10 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.2.6 Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
E.3 INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL) __________________________________________________
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
E.3.1 FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with contract requirements, the item specification(s), the Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data
Package.
E.3.2 The First Article Test Report (FATR) shall be compiled IAW CDRL A005. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.
E.4 REQUIREMENTS FOR PRETREATMENTS AND CHEMICAL AGENT RESISTANT COATINGS LOCAL WARREN - PAINTED MATERIEL ____________________________________________________________________________________________________
E.4.1 Scope
E.4.1.1 This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical
Agent Resistant Coating (CARC), and their related materials in accordance with CDRL A003 - Test Procedure - Phosphate Coating. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.
E.4.1.2 Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.
E.4.2 Definitions
E.4.2.1 The contracting agency, appropriate agency, procuring authority, engineering authority, procuring agency, and procuring activity is the PCO or designee.
E.4.2.2 The prime contractor is the company awarded this contract, and the subcontractors comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.
E.4.3 General Requirements Clarifications
E.4.3.1 The government retains the right for onsite verification of the prime contractors and its subcontractors products, processes, procedures, and test reports.
E.4.3.2 The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports. This information shall be available upon government request.
E.4.3.3 The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.
E.4.3.4 Each cleaning method shall be treated as a separate step in the process documentation.
E.4.3.5 The Gage Repeatability and Reproducibility (Gage R&R) error shall be less than 30 percent for all process and product measurement systems.
E.4.3.6 Products with hexavalent chromium, including but not limited to certain fastener finishes, shall not be used. Additionally, CARC topcoats containing siliceous additives to control gloss are prohibited.
11 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.4.3.7 CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.
E.4.3.8 If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in TT-C-490.
E.4.3.9 Neutral salt spray (NSS) testing shall not be used to validate compliance with materiel life cycle requirements; NSS is a production quality test and does not predict field performance.
E.4.4 Pre-Production Approval Clarifications
E.4.4.1 Pre-production testing shall include:
E.4.4.1.1 Thickness of each layer of the coating system;
E.4.4.1.2 Coating system adhesion;
E.4.4.1.3 Salt spray performance; and
E.4.4.1.4 For phosphate pretreatments, the phosphate coating weight, crystal size and shape, and scanning electron microscope photos of the phosphate coatings at 500x and 1000x magnification.
E.4.5 Pre-production test samples shall be from the material used for production parts, pieces cut from production representative parts, or production representative parts. Standardized test coupons shall not be used.
E.4.6 Nine samples shall be produced for the required testing and shall include: three cleaned and pretreated test samples, three samples with the complete paint system and, depending on the CARC paint system, either three samples with pretreatment plus primer or three samples with metal-rich primer plus primer.
E.4.7 One or more ISO 17025 laboratories shall conduct pre-production testing on the nine test samples in accordance with (IAW) the applicable test method accreditations. The applicable ISO 17025 test method accreditations include ASTM B117 Salt Spray, ASTM B244
Thickness of Non-Conductive Coatings on Non-Magnetic Metals, ASTM B487 Measurement of Metal and Oxide Coating Thickness, ASTM B499
Thickness of Non-Conductive Coatings on Magnetic Metals, and ASTM D3359 Measuring Adhesion by Tape Test.
E.4.8 Unless required elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel shall meet a minimum of 336 hours neutral salt spray resistance IAW ASTM B117.
E.4.9 Test procedures shall be submitted IAW the Contract Data Requirements List (CDRL) DI-NDTI-80603 documenting Pretreatment and
Chemical Agent Resistant Coating procedures when this CDRL is included in the contract.
E.4.10 Test reports from the ISO 17025 accredited labs shall be submitted for Pretreatment and Chemical Agent Resistant Coating testing specified in paragraph (d)(4) of this clause IAW the Contract Data Requirements List (CDRL) DI-NDTI-80809 when this CDRL is included in the contract.
E.4.10.1 Production Testing Clarifications
E.4.10.1.1 At a minimum, ongoing production quality tests shall conducted and recorded daily for coating adhesion and coating thickness, and monthly for salt spray testing. Use of ISO accredited laboratories is optional for these ongoing tests of production parts.
E.4.10.1.2 Production parts or pieces cut from production parts shall be used for ongoing production quality testing. Standardized test coupons shall not be used.
E.4.10.1.3 Unless specified elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel shall meet a minimum of 336 hours neutral salt spray resistance IAW ASTM B117.
E.5 GOVERNMENT FURNISHED AMMUNITION (GFA) _____________________________________
E.5.1 Ammunition listed in Section J, Attachment 0001 Government Furnished Property, has been programmed to support contractual test requirements.
E.5.2 Requests for all ammunition shall be submitted electronically to the contract specialist on DD Form 1348 no later than 90 days prior to desired delivery dates. The completed request may be submitted via electronic mail to the Contracting Officer, and to usarmy.detroit.tacom.mbx.ilsc-tav-c@mail.mil.
E.5.3 The contractor shall be responsible for reporting on the status of ammunition expenditures throughout the life of the contract as follows:
E.5.3.1 After the initial receipt of GFA, the contractor shall provide an ammunition consumption report in accordance with CDRL A006
Government Furnished Material Consumption Report.
12 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.5.3.2 No later than 30 days after completion of the contract, the contractor shall report to the Contracting Officer on the remaining ammunition IAW CDRL A006 Government Furnished Material Consumption Report . The contractor shall request disposition instructions for the remaining ammunition. After executing these instructions, the contractor shall provide confirmation to the Contracting Officer.
E.5.4 The contractor shall furnish a copy of the above ammunition reports and disposition requests to the cognizant Defense Contract
Management Agency (DCMA) Quality Assurance Representative (QAR) and to the Government Furnished Material/Management Control Activity
(GFM/MCA), at "mailto:usarmy.detroit.tacom.mbx.ilsc-mca@mail.mil ". _________________________________________________________
E.6 REWORK AND REPAIR OF NONCONFORMING MATERIAL ___________________________________________
E.6.1 Rework and Repair are defined as follows:
E.6.1.1 Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
E.6.1.2 Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
E.6.2 Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
E.6.3 Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting
Officer for review and written approval prior to implementation.
E.6.4 Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
E.6.5 The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical
Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
E.7 ACCEPTANCE INSPECTION EQUIPMENT (AIE) _____________________________________
E.7.1 The contractor shall use a calibration system with traceability to a national or international standard for the AIE used on this contract.
E.7.2 The contractor shall provide all AIE (except for any AIE listed as available in Section H or Appendix I) necessary to assure conformance of material to the contract requirements in accordance with CDRL A001 - Acceptance Inspection Equipment (AIE) Report.
E.7.3 AIE shall be available for use on the First Article (FA) submission, if FA is required, or prior to use for acceptance of production material on this contract.
E.7.4 Contractor furnished AIE shall be made (i) to the AIE designs specified in Section C, or (ii) to any other design provided the contractor's proposed AIE design is approved by the Government. Contractor's proposed AIE design for inspection of characteristics listed as "Critical, Special or Major" shall be submitted to the Government for review and approval as directed on the Contract Data
Requirements List, DD Form 1423. Government approval of AIE design shall not be considered to modify the contract requirements.
E.7.5 When the contractor submits its proposed AIE on commercial off the shelf equipment, the contractor shall include the manufacturer's name and model number, and sufficient information to show capability of the proposed AIE to perform the inspection required. When submitting proposed AIE design documentation on commercial computer controlled test and measuring equipment include information on (1) test program listing (2) flowcharts showing accept and reject limits and computer generated test stimuli (3) calibration program listing (4) sample of the printout of an actual test and calibration (5) test plan to verify accuracy of inspection and correctness of accept or reject decision (6) identification of the equipment by model name and number.
E.7.6 Resubmission of the contractor's proposed AIE design for Government approval on a follow on Government contract is not required, provided the inspection characteristic parameters specified in the technical data package and the previously Government approved AIE designs have not changed. In this situation, the contractor shall provide written correspondence in the place of the AIE designs that indicates the prior Government approval and states that no changes have occurred.
E.7.7 The Government reserves the right to disapprove, at any time during the performance of this contract, any AIE that is not
13 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
accomplishing its intended use in verifying an inspection or test characteristic.
E.7.8 If the contractor changes the design after the initial approval, the modified design must be submitted for approval prior to use
E.8 USE OF MIL-STD 1916 ___________________
E.8.1 The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of
Product. The Verification Level (VL) shall be VL III for major characteristics and VL II for minor characteristics.
E.8.2 MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
*** END OF NARRATIVE E0001 ***
14 15
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Exhibit A CONTRACT DATA REQUIREMENTS LIST A001-A006 30-JUN-2022 006 DATA
15 15
MOD/AMD
ATT/EXH ID
PAGE
Exhibit A
CONTRACT DATA REQUIREMENTS LIST
Form Approval OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0014
B. EXHIBIT: A
C. CATEGORY:
TDP _X__ TM ____ OTHER ___ _
D. SYSTEM/ITEM: FIRING ATTACHMENT, .50 CAL BL NSN: 1005-01-091-7510
E. CONTRACT/PR NO.: TBD
F. CONTRACTOR: TBD
1. DATA ITEM NO.: A001
2. TITLE OF DATA ITEM: ACCEPTANCE INSPECTION EQUIPMENT (AIE) REPORT
3. SUBTITLE: SPECIAL INSPECTION EQUIPMENT DESCRIPTIVE DOCUMENTATION
4. AUTHORITY: DI-MGMT-81979
5. CONTRACT REFERENCE: SECTION E.8
6. REQUIRING OFFICE: RDAR-EIQ-P
7. DD250 REQ: Not required
8. APP CODE: A
9. DIST. STATEMENT: A
10. FREQUENCY: ASREQ
11. AS OF DATE: DATE OF CONTRACT AWARD
12. DATE OF FIRST SUB: ASREQ (See Block 16)
13. DATE OF SUBS: ASREQ (See Block 16)
14. DISTRIBUTION:
A. ADDRESSEE: Engineering, "mailto:USARMY.PICA.ARDEC.MBX.QESA-QEW-AIE@MAIL.MIL " , Quality Assurance, "mailto:USARMY.RIA.ARDEC.MBX.RDAR-QEP2@MAIL.MIL " , and Contract Specialist, Mark Hilson, mark.d.hilson.civ@army.mil
B. COPIES: 4
DRAFT:
FINAL: 4
15. TOTAL: 4
16. REMARKS:
DD FORM 250 IS NOT REQUIRED
BOX 12: SUFFICIENTLY PRIOR TO INITIATION OF PRODUCTION OR FIRST ARTICLE TEST, IF CONTRACTUALLY REQUIRED (SEE NOTE 1).
BOX 13: WHENEVER ANY REVISION THERETO IS NEEDED FOR ANY REASON.
NOTE 1: THE GOVT WILL FURNISH DISPOSITION WITHIN 45 DAYS AFTER RECEIPT.
ELECTRONIC SUBMISSION:
1) ENGINEERING: USARMY.PICA.ARDEC.MBX.QESA-QEW-AIE@MAIL.MIL
2) QA: USARMY.RIA.ARDEC.MBX.RDAR-QEP2@MAIL.MIL
NOTE 2: MICROSOFT OFFICE 97 DRAWINGS: AUTOCAD-RELEASE 14 (EXPRESS MAILED
HARD COPIES WILL BE ACCEPTED) FILES MAY BE COMPRESSED USING ZIP PROGRAM.
WARNING: LARGE PACKAGES MAY CAUSE DELAYS IN DELIVERY USING MAIL INTERNET.
EMAIL SUBJECT LINE MUST CONTAIN END ITEM NOMENCLATURE.
A. CONTRACT LINE ITEM NO.:
B. EXHIBIT:
C. CATEGORY:
TDP ___ TM ____ OTHER ___
D. SYSTEM/ITEM:
E. CONTRACT/PR NO.:
F. CONTRACTOR:
1. DATA ITEM NO.: A002
ATT/EXH ID
PAGE
Exhibit A
2. TITLE OF DATA ITEM: RESERVED
3. SUBTITLE:
4. AUTHORITY:
5. CONTRACT REFERENCE:
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .