- Solicitation number
- W56HZV-20-R-0148
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA LOG CENTRIFUGAL FAN-2.xlsx | XLSX spreadsheet | |
| W56HZV-20-R-0148-0002.pdf | ||
| W56HZV20R0148-0001.pdf | ||
| QA LOG CENTRIFUGAL FAN.xlsx | XLSX spreadsheet | |
| Instructions to open Chemical TDPs.doc | DOC document | |
| RFP W56HZV20R0148 - Centrifugal Fan (14JAN2021).pdf | ||
| Files to view 2D-3D Files.doc | DOC document | |
| Attachment 0001 - First Article Waiver Worksheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req No. 5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print) 16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0003 2023MAR06
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
DANIEL M. SHALLAL
EMAIL: DANIEL.M.SHALLAL.CIV@ARMY.MIL
W56HZV-20-R-0148
2021JAN14
X
X 2023APR05 05:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 7
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DANIEL M. SHALLAL
Buyer Office Symbol/Telephone Number: CCTA-APS-A/(586)282-7359
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of Amendment 0003 to Solicitation W56HZV-20-R-0148 is to:
1. Extend the solicitation due date and time to 05 APRIL 2023 at 5:00 PM EST.
2. Section E: Add the following:
E.8 ENGINEERING EXCEPTIONS:
Paragraphs 3.5.13 & 4.5.4.12 High altitude electromagnetic pulse and 3.5.14 & 4.5.4.13 Lightning of PRF EA-F-1473 are not required.
Documents MIL-STD-2169 and MIL-STD-464 associated with above mentioned paragraphs are not required as well.
3. SECTION B:
REMOVE the following First Article Testing (FAT) CLINs from ordering years 2-5 as they are not required:
0026 SECOND ORDERING YEAR - FIRST ARTICLE TEST & REPORT
0036 THIRD ORDERING YEAR - FIRST ARTICLE TEST & REPORT
0046 FOURTH ORDERING YEAR - FIRST ARTICLE TEST & REPORT
0056 FIFTH ORDERING YEAR - FIRST ARTICLE TEST & REPORT
4. REVISE Clause 52.211-8 TIME OF DELIVERY to remove FAT CLINS 0026-0056
5. All other terms and conditions of solicitation W56HZV-20-R-0148, except for those addressed by Amendment 0003, remain in full force and effect.
*** END OF NARRATIVE A0004 ***
2 7
W56HZV-20-R-0148
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0026 DELETED _______
0036 DELETED _______
0046 DELETED _______
0056 DELETED _______
3 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
E.1. REWORK AND REPAIR OF NONCONFORMING MATERIAL
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
E.2. DESTRUCTIVE TESTING
(a) All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.
(b) Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to be delivered to the Government as set forth in the Contract Schedule.
(c) All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
(d) The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance or in process testing, unless specifically authorized by the Contracting Officer.
(e) The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
E.3. First Article Test (FAT) Requirements
(a) The contractor shall conduct a FAT on ten (10) fans (PN 5-19-9431-10) to all testing and inspection requirements listed on drawing 5-
19-9431 (NOR Y21-0094-001) and in specification PRF EA-F-1473D (NOR Y21-0094-002).
(b) For subcomponent, Identification Plate (PN 5-19-9484), three (3) each shall be examined to all inspection requirements listed on drawing 5-19-9484.
(c) The contractor shall also conduct a FAT on three (3) unit pack containers to all inspection requirements listed in SPI P5-19-9431-
10.
The contractor is responsible for all testing regardless of who conducts the testing. A First Article Test Report (FATR) shall be completed by the contractor documenting the results of all inspections and tests including supplier's and vendor's inspection records
4 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
and certifications, when applicable. The FATR shall include actual inspection and test results to include measurements, recorded test data, and certification (if applicable) keyed to each drawing, Quality Assurance Plan (QAP), and specification characteristics.
E.4. SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING)
(a) In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 business days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 calendar days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.
(4) Life cycle tests over 10 business days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
E.5. PRODUCTION LOT TESTING (CONFORMANCE INSPECTION - Contractor)
(a)The Contractor shall conduct production lot testing (PLT) for each production lot to be tendered to the Government for acceptance.
(b) The samples shall be selected, examined, and tested in accordance with: The contractor shall conduct PLT on the Fan (PN 5-19-9431-
10) to all testing and inspection requirements listed in paragraph 4.4 of PRF EA-F-1473D (NOR Y21-0094-002). The contractor shall also perform PLT on the packaging in accordance with all inspection requirements listed in paragraph F(3) of SPI P5-19-9431-10.
(c) The samples shall be randomly selected from the entire lot by, or in the presence of, the Government Quality Assurance
Representative (QAR). The Contractor shall notify the QAR in writing at least five (5) workdays in advance, when the lot is ready for sample selection. The Contractor shall inspect production lots for conformance to the contracts requirements prior to selecting PLT samples. Unless otherwise authorized by the Contracting Officer, test samples shall not be submitted pursuant to this provision where the Contractor has determined that the lot does not conform to all contract requirements.
(d) Within 10 business days of completing PLT on any given lot, the Contractor shall deliver to the Government a report that documents whether production lots conform to PLT requirements (see CRDL A006). The PLT report shall verify whether all required inspections and tests have been completed successfully. The report shall be submitted to the Government in accordance with CDRL in Section J.
(e) Within 10 business days (unless other time frame agreed to by all parties) after receipt of the PLT report by the government, the government will notify the Contractor in writing whether the specific lot has been approved, conditionally approved, or rejected. The
Contractor shall maintain PLT report(s) for a period of two years after contract expiration, during which time they shall be available for Government review.
5 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(f) If the PLT sample fails to meet any contractual requirement, the lot from which the test samples were drawn shall be rejected by the
Government. In that event, the Contractor shall take immediate corrective action at no increase in the contract price, and shall submit an additional PLT sample (from the reworked lot or from a new lot) for inspection. Corrective action shall apply to all items including, if applicable, basic items, repair parts, and in-process or final assembly items produced or in production since the last successful production lot test.
(g) PLT samples not consumed or destroyed in testing may be delivered as part of the production quantities due under the contract.
E.6. INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.7. DRAWINGS FOR INSPECTION
(a) When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications and any applicable
Engineering Exceptions associated to the drawings, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.
E.8 ENGINEERING EXCEPTIONS:
Paragraphs 3.5.13 & 4.5.4.12 High altitude electromagnetic pulse and 3.5.14 & 4.5.4.13 Lightning of PRF EA-F-1473 are not required.
Documents MIL-STD-2169 and MIL-STD-464 associated with above mentioned paragraphs are not required as well.
*** END OF NARRATIVE E0001 ***