Attachment 0001 - First Article Waiver Worksheet.pdf
PDF 670 KB Posted
- Solicitation number
- W56HZV-20-R-0148
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV20R0148-0003.pdf | ||
| QA LOG CENTRIFUGAL FAN-2.xlsx | XLSX spreadsheet | |
| W56HZV-20-R-0148-0002.pdf | ||
| W56HZV20R0148-0001.pdf | ||
| QA LOG CENTRIFUGAL FAN.xlsx | XLSX spreadsheet | |
| Instructions to open Chemical TDPs.doc | DOC document | |
| RFP W56HZV20R0148 - Centrifugal Fan (14JAN2021).pdf | ||
| Files to view 2D-3D Files.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 3 Reset Form
BUYER'S NAME Marguerite Strelecki
SOLICITATION/CONTRACT # W56HZV-20-R-0148
CONTRACTOR NAME CONTRACTOR CAGE
NSN NOUN
PART # TOP DRAWING # REVISION LEVEL
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or solicitation.
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
A) Successful completion of a First Article Test on a recent contract for the same item(s).
Complete the following & attach supporting documentation*.
CONTRACT # DATE OF FIRST ARTICLE TEST APPROVAL ISSUING GOVERNMENT AGENCY
Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
If NO, please describe the differences in detail below and include any considerations these changes will require for the Firs t Article Test waiver request
This information/supporting documentation is part of your request.
Contact the buyer if you have any questions about the acquisition offer/quote requirements.
Revision C 05 March 2014
Request for Information and Supporting Documentation
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
4140-01-234-8170 Centrifugal Fan
5-19-9431-10 5-19-9431 K
Page 2 of 3 Reset Form
B) Successful completion of a First Article Test on a similar item on a recent contract and the item has been tested per the same requirements as those referenced in the solicitation and/or contract.
Complete the following for the similar item & attach supporting documentation*:
CONTRACT # NOMENCLATURE
NSN PART NUMBER DATE OF FIRST ARTICLE TEST APPROVAL
Briefly describe the major differences between the similar item and the item being procured.
Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request
C) Material has been in continuous production. Complete and attach supporting documentation*:
LENGTH OF PRODUCTION RUN APPROVAL DATE OF LAST SUCCESSFUL FIRST ARTICLE TEST
Remarks (if needed)
D) Recent and successful performance of a first article test on the next higher assembly. A waiver may be requested in order to eliminate duplication of testing on the lower assembly.
Complete the following for the next higher assembly and attach supporting documentation*:
CONTRACT # NOMENCLATURE
NSN PART NUMBER DATE OF FIRST ARTICLE TEST APPROVAL
Provide a full explanation justifying why duplicate testing is unnecessary:
Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
If NO, please explain:
Add File
Open File
Remove File
E) Other: A waiver or partial waiver of the FAT is being requested based on the following:
Please be specific and attach supporting documentation* as appropriate:
A) There are or have been quality issues (history) for this or similar items to include Product Quality Deficiency Reports (PQDRs), Corrective Action Request, and/or show-cause letters. Please briefly discuss below:
B)
C)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
Please describe below.
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to manufacture of this item. Please describe below.
The submitter, by signing the below certifies that the above statements are true and correct.
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
PRINTED NAME TITLE
COMPANY NAME COMPANY ADDRESS
PHONE NUMBER
Signature
4. OTHER PERTINENT INFORMATION
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
*See the solicitation/contract for information on submitting supporting documentation as well as additional requirements regarding First Article Test Waiver requests.
Page 3 of 3 Reset Form
File details come from the government source that posted it. Updated .