W56HZV20R0021-0003.pdf

PDF 195 KB Posted

Attached to
Bradley A4 Production Contract - Amendment 0005
Solicitation number
W56HZV-20-R-0021
Issued by

About this file

This is an amendment to a solicitation for the Bradley A4 Production Contract. The amendment provides revisions to various sections of the contract, including adding new contract line item numbers, revising narratives in Sections B, C, E, G, H, and J, and adding new contract data requirements lists and attachments. Key details include the contractor modifying M2A3, M2A2 ODS-SA, A3 BFIST, and M7 BFIST vehicles to the M2A4, M7A4 configurations per the technical data packages, with exceptions. The contractor must also perform 10/20 standard repairs, replace fluids and filters, install towing and tie-down kits, and replace legacy components. Testing requirements include follow-on production testing and extended follow-on production testing to be conducted on vehicles selected from production orders.

View the file

Other files

File Type Posted
Attachment 0026 - FAT Matrix_25 May 2022.xlsx XLSX spreadsheet
Attachment 0039_Pricing Matrix_Locked_25 May 2022.xlsx XLSX spreadsheet
Attachment 0008_Engineering Change Proposals_25 May 2022.xlsx XLSX spreadsheet
W56HZV20R0021-0005.pdf PDF
W56HZV20R0021-0004.pdf PDF
Copy of Attachment 0026 - FAT Matrix (Updated 18 March 2022).xlsx XLSX spreadsheet
W56HZV-20-R-0021 0002.pdf PDF
W56HZV-20-R-0021 Amendment 0001.pdf PDF
W56HZV20R0021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Fixed Price Incentive (Cost Based)

0003 2022FEB14

W56HZV

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

DANIEL SAFFRON

EMAIL: DANIEL.J.SAFFRON.CIV@ARMY.MIL

W56HZV-20-R-0021

2020DEC18

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 48

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: DANIEL SAFFRON

Buyer Office Symbol/Telephone Number: CCTA-ALH-B/(586)282-2073

Type of Contract 1: Fixed Price Incentive (Cost Based)

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

1. The purpose of Amendment 0003 of RFP W56HZV-20-R-0021 is to make the following revisions/additions/deletions:

2. SECTION B:

a. CLINs 1001AA, 1002AA, 1003AA, 1004AA, 2001AA, 2002AA, 2003AA, 2004AA, 3001AA, 3002AA, 3003AA, 3004AA, 4001AA, 4002AA, 4003AA, 4004AA, 5001AA, 5002AA, 5003AA, and 5004AA have the following narrative added:

"Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual deliverydate, the contractor must notify the Government PCO in writing for authorization."

b. The following CLINs are hereby incorporated:

*A043 - Ballistic Acceptance Test Report

*A044 - Obsolescence Status Report

*A045 - Make or Buy

A046 - List of Subcontractors Report

A047 - Failure Mode, Effects, and Criticality Analysis Plan

* Inadvertantly omitted from previous Amendments

c. Section B, Narrative B0001, is hereby revised

3. SECTION C:

a. Section C, Narrative C0001, Scope of Work, is hereby revised.

4. SECTION E:

a. Section E, Narrative E0001, Inspection and Acceptance, is hereby revised.

5. SECTION G:

a. Section G, Narrative G0001, Contract Adminstration Data, is hereby revised.

6. SECTION H:

a. Section H, Narrative H0001, Special Contract Requirements, is hereby revised.

7. SECTION J:

a. The following CDRLs are hereby added to Exhibit A:

1. CDRL A046 List of Subcontractors Report 20-JAN-2022

2. CDRL A047 Failure Mode, Effects, and Criticality Analysis Plan 20-JAN-2022

b. The following Attachments are hereby revised as follows:

FROM: List of Addenda Title Date_______ ______________________________________________________________

Exhibit A CDRLS (A001 - A042) 23-SEP-2021

Attachment 0040 BRADLEY EFIR 11-AUG-2021

TO: List of Addenda Title Date_______ ______________________________________________________________

Exhibit A CDRLS (A001 - A047) 20-JAN-2022

2 48

W56HZV-20-R-0021

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Attachment 0040 RESERVED 20-JAN-2021

8. All other terms and conditions, except those addressed in this Amendment 0002, remain unchanged and in full force and effect.

*** END OF NARRATIVE A0004 ***

3 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 CLIN Structure. In the four digit Contract Line Item Numbers (CLINS) that follow, the numbering system that is used is as follows:

B.1.1 The first digit signifies the ordering period:

1XXX represents ordering period one

2XXX represents ordering period two

3XXX represents ordering period three

4XXX represents ordering period four

5XXX represents ordering period five

B.1.2 The second digit signifies test support:

X1XX represents Follow-On Production Test (FPT) and Extended Follow-on Production Testing (EFPT) Test Support

B.1.3 The third digit signifies the vehicle add-ons, repairs and production break

XX1X represents Tri-Color Paint

XX2X represents Heat Abatement Kit Repair

XX3X represents LRU Repair and Replace

XX4X represents Production Break

XX5X represents Obsolescence Redesign

B.1.4 The fourth digit signifies the vehicle conversion:

XXX1 represents a M2A3 to M2A4

XXX2 represents a A3 BFIST to M7A4

XXX3 represents a M2A2 ODS-SA to M2A4

XXX4 represents a M7BFIST SA TO M7A4

B.1.5 Unless separately priced as laid out on the CLIN structure of the contract, all scope requirements are assumed to be priced within the vehicle unit price and range pricing represented in each CLIN.

The total Estimated Quantity for this requirement is 211 vehicles. Estimated quantities are listed for each ordering year in the Pricing

Attachment 0039.

IAW FAR 16.503(c): Government property furnished for repair. As a requirements contract is used to acquire work (e.g., repair, modification, or overhaul) on existing items of Government property, failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or "maximum" will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

*** END OF NARRATIVE B0001 ***

4 48

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

1001AA ORDERING PERIOD 1 BRADLEY M2A3 TO M2A4 $ $ ______________________________________ ______________ __________________

COMMODITY NAME: OP1 M2A3 TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

1002AA ORDERING PERIOD 1 A3 BFIST TO M7A4 $ $ __________________________________ ______________ __________________

COMMODITY NAME: OP1 A3 BFIST TO M7A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

1003AA ORDERING PERIOD 1 BRADLEY M2A2 OSD-SA TO M2A4 $ $ _____________________________________________ ______________ __________________

COMMODITY NAME: OP1 M2A2 OSD-SA TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO

5 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

1004AA ORDERING PERIOD 1 BRADLEY M7BFIST SA TO M7A4 $ $ ____________________________________________ ______________ __________________

COMMODITY NAME: OP1 M7BFIST SA TO M7A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

2001AA ORDERING PERIOD 2 BRADLEY M2A3 TO M2A4 $ $ ______________________________________ ______________ __________________

COMMODITY NAME: OP2 M2A3 TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

6 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

2002AA ORDERING PERIOD 2 BRADLEY A3 BFIST TO M7A4 $ $ __________________________________________ ______________ __________________

COMMODITY NAME: OP2 A3 BFIST TO M7A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

2003AA ORDERING PERIOD 2 BRADLEY M2A2 OSD-SA TO M2A4 $ $ _____________________________________________ ______________ __________________

COMMODITY NAME: OP2 M2A2 OSD-SA TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

2004AA ORDERING PERIOD 2 BRADLEY M7BFIST SA TO M7A4 $ $ ____________________________________________ ______________ __________________

COMMODITY NAME: OP2 M7BFIST SA TO M7A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

7 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

3001AA ORDERING PERIOD 3 BRADLEY M2A3 TO M2A4 $ $ ______________________________________ ______________ __________________

COMMODITY NAME: OP3 M2A3 TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

3002AA ORDERING PERIOD 3 BRADLEY M2A2 OSD-SA TO M2A4 $ $ _____________________________________________ ______________ __________________

COMMODITY NAME: OP3 M2A2 OSD-SA TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

8 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

3003AA ORDERING PERIOD 2 BRADLEY M2A2 OSD-SA TO M2A4 $ $ _____________________________________________ ______________ __________________

COMMODITY NAME: OP2 M2A2 OSD-SA TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

3004AA ORDERING PERIOD 3 BRADLEY M7BFIST SA TO M7A4 $ $ ____________________________________________ ______________ __________________

COMMODITY NAME: OP3 M7BFIST SA TO M7A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

4001AA ORDERING PERIOD 4 BRADLEY M2A3 TO M2A4 $ $ ______________________________________ ______________ __________________

COMMODITY NAME: OP4 M2A3 TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

9 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

4002AA ORDERING PERIOD 4 BRADLEY M2A2 OSD-SA TO M2A4 $ $ _____________________________________________ ______________ __________________

COMMODITY NAME: OP4 M2A2 OSD-SA TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

4003AA ORDERING PERIOD 4 BRADLEY M2A2 OSD-SA TO M2A4 $ $ _____________________________________________ ______________ __________________

COMMODITY NAME: OP4 M2A2 OSD-SA TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

4004AA ORDERING PERIOD 4 BRADLEY M7BFIST SA TO M7A4 $ $ ____________________________________________ ______________ __________________

10 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

COMMODITY NAME: OP4 M7BFIST SA TO M7A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

5001AA ORDERING PERIOD 5 BRADLEY M2A3 TO M2A4 $ $ ______________________________________ ______________ __________________

COMMODITY NAME: OP5 M2A3 TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

5002AA ORDERING PERIOD 5 BRADLEY M2A2 OSD-SA TO M2A4 $ $ _____________________________________________ ______________ __________________

COMMODITY NAME: OP5 M2A2 OSD-SA TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

11 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

5003AA ORDERING PERIOD 5 BRADLEY M2A2 OSD-SA TO M2A4 $ $ _____________________________________________ ______________ __________________

COMMODITY NAME: OP5 M2A2 OSD-SA TO M2A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

5004AA ORDERING PERIOD 5 BRADLEY M7BFIST SA TO M7A4 $ $ ____________________________________________ ______________ __________________

COMMODITY NAME: OP5 M7BFIST SA TO M7A4

CLIN CONTRACT TYPE:

Fixed Price Incentive (Cost Based)

Accelerated delivery is authorized at no additional cost to the Government. If accelerated delivery is more than 60 days prior to the contractual delivery date, the contractor must notify the Government PCO in writing for authorization.

(End of narrative B002)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

9000 BASIC CLIN FOR ELIN ___________________

12 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A043 CDRL A043 - BALLISTIC ACCEPTANCE TEST REPORT 1 LO $ ** NSP ** ____________________________________________ __________________

SERVICE REQUESTED: BALLISTIC ACCEPTANCE TEST REP

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A044 CDRL A044 - OBSOLESCENCE STATUS REPORT 1 LO $ ** NSP ** ______________________________________ __________________

SERVICE REQUESTED: OBSOLESCENCE STATUS REPORT

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A045 CDRL A045 - MAKE OR BUY 1 LO $ ** NSP ** _______________________ __________________

SERVICE REQUESTED: MAKE OR BUY

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A046 CDRL A046 - LIST OF SUBCONTRACTORS REPORT 1 LO $ ** NSP ** _________________________________________ __________________

13 48

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SERVICE REQUESTED: LIST OF SUBCONTRACTORS REPORT

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A047 CDRL A047 - FAILURE MODE, EFFECTS, & CRITICAL _____________________________________________

ANALYSIS PLAN 1 LO $ ** NSP ** _____________ __________________

SERVICE REQUESTED: FAILURE MODE, EFFECTS, CRITIC

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

14 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 General. The contractor shall produce M2A4 vehicles from M2A3 and M2 Operation Desert Storm-Situational Awareness (ODS-SA) source vehicles and M7A4 vehicles from A3 Bradley Fire Support Team (BFIST) with Fire Support Sensor System (FS3) and M7 BFIST-SA source vehicles in accordance with (IAW) Section C.9.

C.1.1 Data Deliverables are listed in Section J, unless otherwise specified, contractor format is acceptable. The contractor shall use an editable format for all data deliverables.

C.1.1.2 All CDRLs with XX for dd250 will be Inspected and Accepted (I&A) by the Government in the CDRL delivery tool. BLOCK 7: XX means

CDRLS are submitted to CDRL delivery tool only and I&A will be approved in CDRL tool.

C.1.2 Review and Access.

The Procurement Contracting Officer (PCO) or the Contracting Officer Representative (COR) shall have the right to review, both in-process and upon completion, all project efforts, data and documentation expended and prepared under this contract. This includes, but is not limited to, design, fabrication, assembly, test, calibration, quality, inspection, and Integrated Logistics Support (ILS) documents.

Within 5 working days of a request, the contractor shall make available to the Government any associated records and data including those related to cost, schedule, and performance.

C.1.2.2.1 The contractor shall allow unescorted access to the Bradley A4 assembly and fabrication areas, at BAE facilities, to the

Contracting Officers Representative (COR).

C.2 Meetings, Conferences and Reviews:

C.2.1 The contractor shall participate and host the meetings, conferences, and reviews listed in this contract. Whenever possible, meetings shall be conducted virtually using Government agreed-upon technology.

C.2.1.1 Agendas, Presentation Materials and Minutes. Unless otherwise specified, the contractor shall deliver CDRL A001 Agenda, CDRL

A002 Presentation Materials , and CDRL A003 - Meeting Minutes for all meetings identified in Section C.2. Agendas, Presentation

Materials and Minutes shall reflect the identification of major problem areas, the plans for their resolution, and the assessment of the impact, if any, on the contract objectives.

C.2.2 Start of Work Meeting (SOWM). The contractor shall host a Start of Work meeting at a BAE facility within 40 business days after contract award to review all requirements of the contract. The contractor shall schedule the event with the Defense Contract Management

Agency (DCMA) office, the Procuring Contracting Officer (PCO), and Product Manager (PdM) Bradley office at least 20 business days in advance of the meeting. The contractor shall participate with the Government to arrange a schedule and agenda for the meeting. The contractor shall deliver an agenda in accordance with CDRL A001, presentation materials in accordance with CDRL A002, and meeting minutes in accordance with CDRL A003.

C.2.3 Production Status Meetings. The contractor shall conduct a weekly Production meeting via teleconference to provide the Government with status on the production of vehicles. The Contractor shall coordinate the Production meeting agenda issues, topics and schedules with the Government Production Integrated Product Team (IPT) members. The contractor shall discuss production risks, issues, and any resulting pending and approved Requests for Variance (RFVs) or design changes required to address these issues. The contractor shall track generated Engineering Support In Production (ESIP) requests status and the duration of each request. The presentation materials shall include the following items listed below:

(a) Vehicle status:

1. Current vehicle location

(b) Parts status:

1. Shortage list showing expected delivery date of each short part, and shortage impact to contractual DD 250 dates

(c) Production Issues

(d) Open Contracting action items

(e) Quality Concerns

(f) Failure Analysis and Corrective Action Report (FACAR) (reference section C.10.5)

The minutes shall contain schedules; detailed results and proceedings of discussions, assessments, and guidance; action items; an attendees roster; and all presentations. Action items shall be assigned prior to the close of the meeting.

C.2.4 Quarterly Quality Council (QQC) Meetings. The Contractor shall conduct a single day, semi-annual, Bradley Quality Council IPT meetings at the Contractor's York facility. The Contractor shall coordinate the Quality Council meeting agenda issues, topics and schedules with the Government. The presentation materials shall include the following items for all Contractor facilities including BAE

Red River, BAE Anniston, BAE Aiken and BAE York and major subcontractors:

15 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(a) Current BAE Quality Organizational Charts at each contractor facility

(b) The status of action from previous QQC meetings

(c) Changes in internal and external issues relevant to the Quality Management System (QMS)

(d) Information on the performance and effectiveness of the QMS, including trends in:

o Audit results, internal and external non-conformances, and corrective actions o Measures of process effectiveness o Measures of process efficiency o Process performance and product conformity o Assessments of manufacturing feasibility o Extent to which quality objectives have been met (Government satisfaction) o Review of performance against maintenance objectives o Warranty performance (where applicable) o Review of supplier performance o Identification of potential process or product failures identified through risk analysis (such as Failure Mode & Effects Analysis (FMEA), Control Plan) o Actual process or product failures and their impact

(e) The adequacy of resources

(f) The effectiveness of actions taken to address risks and opportunities

(g) RESERVED

(h) Weld Quality: Defects Per Unit (DPU) Weld, 100% Final Inspection DPU, In Process Inspection DPU at each station, Major

Structure Defect Data, Top Defect count by station, Corrective Actions for each station

(i) In Process and Final Inspection data by vehicle serial number

(j) Product Quality Deficiency Report (PQDR), corrective actions and response time

(k) Internal and Government Audit Findings

(l) First Article Inspection (FAI): Tracking Current Status Schedule, Issues, Corrective Actions

(m) Top 10 Problem Suppliers: Corrective Actions taken to address suppliers

(n) Top 5 defects at each facility: Corrective Actions taken to address defects

(o) Non-Conforming Material

(p) Continuous Process Improvement (CPI)

C.2.4.1 The minutes shall contain schedules; detailed results and proceedings of discussions, assessments, and guidance; action items;

an attendees roster; and all presentations. Action items shall be assigned prior to the close of the meeting.

C.2.5 Reserved

C.2.6 Post-Award Cost and Software Data Reporting Conference (CSDR)

The Contractor shall host a Post-Award CSDR Conference at the Contractors facility where CSDRs are prepared with the Governments Cost

Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoD 5000.04-M-1 (CSDR Manual). The purpose of the Post-Award

CSDR Conference is to review the contracts CSDR requirements and assess how the Contractors accounting system satisfies the CSDR requirements found in DoD 5000.04-M-1, CSDR Manual and Attachment 0002 - CSDR Plan. In a briefing presented by the Contractor in its own format, the Contractor shall:

- Demonstrate how it collects cost data in its accounting system and how that data will be utilized to provide actual cost transactions and minimize cost allocations when preparing CSDR data deliverables.

- Describe how recurring vs. nonrecurring costs are segregated in its accounting system and for the purpose of CSDR reporting.

- Demonstrate how the data from its accounting system will be mapped into the CSDR reports required by Attachment 0002 - CSDR Plan and associated CDRLs.

- Present the methodologies used for mapping internal cost accounts to the Work Breakdown Structure (WBS), specifically showing how individual WBS elements and functional element codes will be populated.

- Propose any changes to Attachment 0002 - CSDR Plan in order to tailor the plan to the Contractors accounting system, to include any

Contractor recommended changes or additions to the WBS elements. These changes may include adjustments to the submission events and/or submission timelines, particularly in the case of a direct-reporting subcontractor performing against a different delivery schedule than the associated prime contractor.

C.2.6.1 The Contractor and CWIPT will also review the initial submission of the Resource Distribution Table (RDT) (CDRL A007), in order to finalize which subcontractors will be required to provide CSDR reporting and electronic submission of deliverables directly to the

Defense Cost and Resource Center (DCARC) and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.

C.2.6.2 The Post-Award Cost and Software Data Reporting Conference shall be held within 60 days of the Start of Work Meeting on a date mutually agreed to by the CWIPT and the Contractor. This meeting has an anticipated duration of one business day.

C.3 Business Management

16 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.3.1 The contractor shall conduct monthly meetings with the Government to analyze the contractors Earned Value Management (EVM) status.

The contractor shall deliver CDRLs A001-A003 for these meetings.

C.3.2 Integrated Baseline Review (IBR). The Contractor and Government will engage in a joint IBR at the contractor's facility no later than 120 business days after contract award. The review will verify the Performance Measurement Baselines (PMB's) realism, accuracy, and technical content. The contractor shall provide all records and data required by the NDIA Guide to the Integrated Baseline Review

(IBR), as agreed to by the USG and contractor, fifteen (15) business days prior to the IBR. A 12-month rolling wave detailed Integrated

Master Schedule (IMS) plan shall be presented at the initial IBR. After the initial IBR, the contractor shall continue to maintain a minimum of a 6 month rolling wave detailed IMS. Subsequent IBRs shall be conducted throughout the life of the contract for initiation of significant follow-on change actions as defined in the NDIA Guide to the Integrated Baseline Review (IBR) dated February 6, 2015.

The contractor shall deliver CDRLs A001-A003 for these IBRs.

C.3.2.1 Joint IBR Training. The contractor shall facilitate joint IBR training at the contractors facility at least 20 business days prior to the initial IBR. The Government, the Contractors Program and Control Account Managers, and Planning, Monitoring, and Control

Resources for this program shall attend the event. Presentation materials shall be delivered IAW CDRL A002 Presentation Materials and shall cover the purpose, outcome and goals of an IBR and include sample documentation and demonstrations to include detailed IMS, Schedule Risk Assessment, Work Breakdown Structure (WBS) and dictionary, Control Account Authorization (CAA), Control Account Plan (CAP) and Earned Value Criteria, dollarized responsibility assignment matrix and time phased PMB by work package. The joint training is intended to level-set both the contractor's Control Account Managers (CAMs) and the Government Leads on what to expect in an IBR. The contractor may work with the Government BRADLEY EVM Lead for assistance. Training is anticipated to last one day at a BAE facility.

C.3.3 Program Performance Management. The contractor shall meet program cost, schedule, supportability, and technical requirements set forth in the contract and its related documents. The contractor shall monitor in support of CDRL A004 Integrated Program Management

Data and Analysis Report (IPMDAR) and Integrated Master Plan (IMP): (a) the attributes of the work products and tasks required under this contract (i.e., measure the actual attributes of the work products and tasks, such as size and complexity, the content or changes to contract or schedule requirements, comparing these changes to the baseline in order to identify significant deviations); (b) the resources used to perform the contract resources including physical facilities, computers, peripherals, software used in design, manufacturing, testing and operation, networks, security environment, project staff, processes; and (c) the knowledge and skills of program personnel (critical skills acquisition, actual training versus projected, and deviations from plan).

C.3.4 Integrated Program Management Data and Analysis Report (IPMDAR) and Integrated Master Plan (IMP). The contractor shall deliver

CDRL A004 IPMDAR and IMP. The contractor shall prepare the IPMDAR and IMP IAW DI-MGMT-81861B, the DoD Integrated Master Plan and

Integrated Master Schedule Preparation and Use Guide and MIL-STD-881C.

C.3.4.1 The IPMDAR shall be updated and delivered at the Control Account IAW CDRL A004 IPMDAR and IMP. The IMS shall be traceable to the IMP. The IMP is an event-based plan consisting of a hierarchy of program events, with each event being supported by specific accomplishments, and each accomplishment reinforced by specific criteria that must be satisfied. The IMS shall roll up directly to the

IMP and corresponding IMP event and criteria. The contractor shall update and maintain an IMS by logically networking detailed program activities. The schedule shall be consistent with the Contract Work Breakdown Structure (CWBS) and contain the planned events and milestones, accomplishments, exit criteria, and activities from contract award to the completion of the contract. The IMS and time-phasing of the PMB shall be consistent. The IMS shall be resource loaded and clearly identify critical path activities. All IMS monthly submissions shall include written schedule analysis.

C.3.4.2 The contractor shall identify, with supporting rationale, any deviations or changes to the program baseline, and review all program plans, activities, and work products for consistency with the baseline requirements and any approved changes made to them. The contractor shall document all changes, including those to be made to the plans and work products resulting from changes to the requirements baseline. Where applicable, the contractor shall initiate and complete corrective action for all inconsistencies reported in CDRL A004 IPMDAR and IMP.

C.3.5 Incorporation of Baseline Changes. The PMB shall be updated with any required work packages upon receipt of the modification implementing the change. Changes shall be incorporated in accordance with the Contractors Earned Value Management System (EVMS) System

Description.

C.3.5.1 Current Period and Retroactive Changes. The contractor shall use American National Standards Institute/Electronic Industries

Alliance Standard (ANSI/EIA) 748 and the approved System Description in complying with changes. Current period or retroactive changes must be approved by the Government EVM Manager.

C.3.5.1.1 The contractor shall identify, with supporting rationale, deviations or changes to the program baseline, and review program plans, activities, and work products for consistency with the baseline requirements and approved changes made to them. The contractor shall document changes, including those to be made to the plans and work products resulting from changes to the requirements baseline.

The contractor shall initiate and complete corrective action for inconsistencies reported in CDRL A004 IPMDAR and IMP.

C.3.5.1.2 The contractor shall include issues identified by its subcontractors in the identification, tracking and management documentation identified in the C.3.5.1.1.

17 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.3.6 Earned Value Management System (EVMS). The contractor shall use an EVMS that complies with the EVMS guidelines in DoD 5000.02, Defense Acquisition Guidebook, the ANSI/EIA-748, CDRL A004 IPMDAR and IMP, and the contractors own documented System Description. EVM shall be used as a tool to identify and track program risks, manage cost, schedule, and technical performance.

C.3.6.1 Application to Subcontractors. The contractor shall flow-down EVMS requirements to subcontractors exceeding $20M. Flow down of requirements to subcontractors of less the $20M (then-year dollars) is a risk-based decision and will be as mutually agreed between the contractor and the Government at the SOWM. The performance information reported by the subcontractors shall be incorporated and integrated in the contractors management system. The contractor shall be responsible for reviewing and assuring the validity of all subcontractors reporting through surveillance and other means.

C.3.7 Over-Target Baseline (OTB) or Over-Target Schedule (OTS). The contractor shall submit a request to the PCO for Government approval to initiate an OTB or OTS. An OTB or OTS may be initiated in exceptional circumstances indicated by contract performance (per the contractor's EVMS Description). The request shall include a top-level projection of cost or schedule growth, a recommendation of whether or not performance variances should be retained on record, and a schedule for implementing a new baseline. The contractor shall not implement the OTB or OTS restructuring prior to receiving written approval from the PCO.

C.3.8 Contract Funds Status Report (CFSR). The contractor shall submit the CFSR quarterly in accordance with CDRL A005. The contractor shall reconcile reporting elements in the CFSR with the IPMDAR when these documents are submitted in the same month. The contractor shall provide a reconciliation of the CFSR with the IPMDAR as an addendum to the IPMDAR.

C.3.9 Cost and Software Data Reporting (CSDR)

C.3.9.1 Cost and Software Data are the primary means by which the Department of Defense (DoD) collects data on the costs that contractors incur on DoD programs. Reliable and comprehensive cost data is essential to produce credible cost estimates as required in both statute and regulation. The Governments goals and use of CSDR data is to improve the quality of cost estimates; ensure proper resource allocation occurs within the DoD; and enable data driven decision making by program and department leadership.

The Contractor shall systematically collect and report actual contract costs in accordance with the following Contract Data Requirements

Lists (CDRLs) and Attachment 0002 Contract CSDR Plan:

Report Title____________ CDRL____

Resource Distribution Table A007

Cost and Hour Report (FlexFile) A008

Quantity Data Report (DD Form 1921-Q) A009

Technical Data Report (DD Form 1921-T) A011

Contractor Business Data Report (DD Form 1921-3) A012

Bill of Materials (BOM) A022

C.3.9.2 Application to Subcontractors. The Contractor shall flow-down CSDR requirements referenced in section C.3.9.1 and its sub-paragraphs to subcontractors (regardless of subcontractor tier) when the subcontract value is expected to exceed $50 million using the most likely contract quantities, hours, or options (as applicable), as required by Department of Defense (DoD) 5000.04-M-1 - CSDR

Manual. The Contractor shall require subcontractors to electronically submit CSDRs deliverables directly to the Defense Cost and

Resource Center (DCARC). The Contractor shall ensure that Subcontractors subject to CSDR reporting thresholds collect data in sufficient detail to meet Attachment 0002 - CSDR Plan requirements. The Contractor shall collect and deliver data on all subcontractors to comply with Attachment 0003 RDT and CDRL A007- Resource Distribution Table and Attachment 0002 - CSDR Plan requirements. A subcontract is any agreement, purchase order, or instrument other than a prime contract calling for work or for the material required for the performance of one or more prime contracts. A subcontract usually covers procurement of major components or subsystems that require the subcontractor to do extensive design, development, engineering, and testing to meet a prime contractors procurement specifications.

C.3.9.3 Resource Distribution Table (RDT). The Contractor shall prepare and deliver IAW CDRL A007 RDT, the Resource Distribution Table

(RDT) to identify the value of work assigned to the Contractor and its subcontractors by for each WBS element listed in Attachment 0002 -

CSDR Plan, and is the primary means of identifying subcontractors who qualify for CSDR reporting.

C.3.9.4 Contract Work Breakdown Structure (CWBS) & Dictionary. The Contractor shall utilize the CWBS identified in Attachment 0002 -

CSDR Plan, as the primary framework for contract budgeting and reporting of incurred costs and hours to perform the contract. The

Contractor shall extend the WBS to provide adequate internal management, surveillance, and performance measurement of the contract. The

Contractor shall ensure all WBS oriented reporting is compliant with at least the levels identified in Attachment 0002 - CSDR Plan. The

Contractor shall develop and maintain a Contract Work Breakdown Structure (CWBS) Dictionary throughout the life of the contract, and shall submit the CWBS Dictionary. The CWBS Dictionary reports a description of the technical, cost, and work content of each WBS element.

C.3.9.5 Cost and Hour Report (FlexFile). The Contractor shall prepare and deliver the Cost and Hour Report (FlexFile) IAW CDRL A008. The

Cost and Hour Report (FlexFile) reports incurred and forecasted costs and hours related business data in order to perform this contract.

18 48

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.3.9.6 Quantity Data Report (DD Form 1921-Q). The Contractor shall prepare and deliver the Quantity Data Report (DD Form 1921-Q)IAW

CDRL A009. The Quantity Data Report (DD Form 1921-Q) reports quantity information to provide context to the data reported in FlexFile submissions and in order to derive accurate unit cost information.

C.3.9.7 Reserved

C.3.9.8 Technical Data Report (TDR, DD Form 1921-T). The Contractor shall prepare and deliver the Technical Data Report (DD Form 1921-T)

IAW CDRL A011. The Technical Data Report (DD Form 1921-T) reports technical parameter data to provide context to the data reported in

FlexFile submissions and in order to derive parametric cost estimating relationships. Each submission of the TDR shall reflect a Full

Combat Configuration vehicle produced during the CSDR reporting period.

C.3.9.9 Contractor Business Data Report (DD Form 1921-3). The Contractor shall develop, maintain, and deliver the data item IAW CDRL

A012, the CSDR Manual (DoD 5000.04-M-1), and as tailored in this CDRL and Attachment 0002 - CSDR Plan. The CSDR Manual is available from the CADE website at https://cade.osd.mil/ . Contractors shall be required to submit 1921-3 Contractor Business

Data Report on an annual basis within 60 days subsequent to the end of the contractors fiscal year for the life of the contract IAW CDRL

A012 . Only one report is required to be completed and submitted by each Forward Pricing Rate (FPR) unit (e.g., plant, site, business unit) per year, independent of the number of contracts within the FPR unit which contain this CDRL item. The Contractor Business Data

Report is to be prepared by and for the business entity (e.g., plant, site, or business unit) responsible for submitting the Forward

Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the Government. In the absence of a FPR requirement, the term FPR unit should be interpreted for reporting purposes as business unit as defined in the FAR.

C.3.9.10 Bill of Materials (BOM)

The Contractor shall develop, maintain, and deliver a priced indentured BOM for all Bradley variants and contract line items that incur material costs (e.g. LRU Repair/Replace, etc.) IAW CDRL A022 Priced Indentured Bill of Material. The indentured BOM shall include:

End Item, Variant/CLIN, Next Higher Assembly (NHA) Item, NHA Item Description, Level, WBS, WBS Description, Component Item, Component

Item Description, Make Buy Code, Component Item Type, Component Quantity, Extended Quantity, Unit of Measure (UOM), CMP Organization

Code, National Stock Number (NSN), BOM WIP Supply Type, End Assembly Pegging, "Discrete Receivable (Y/N)", Supplier, Average Unit Cost

(AUC) , Extended Average Unit Cost (EAUC), Extended Average Unit Price (EAUP). As part of the BOM delivery, CDRL A022, the contractor shall also deliver an adders matrix that identifies all component item types and which adders are applied to each component item type. A sample adders matrix is provided in Attachment 0044. The contractor shall format the BOM in a parent child format and include all of the components required to build the vehicles. The contractor shall provide an analysis that reconciles the BOM data with the data delivered in CDRL A008 Cost and Hour Report (Flexfile) and CDRL A009 - Quantity Data Report (DD Form 1921-Q). The contractor shall deliver CDRL A022 with data that reflects the vehicle configuration at the end of the base order and each option order the BOM delivery is linked to and provide deliverable notes and guides to explain the data represented in the deliverable. The contractor shall provide the information in MS Excel format, without encryption, locks, passwords, or other security protection features which would prevent the

Government from editing, sorting, merging, or otherwise manipulating the data for Government purposes.

C.4 Engineering

C.4.1 Manufacturing Plan. The Contractor shall update and submit the A4 Bradley Manufacturing Plan (CDRL A013) to include material flow plans, process control plans, assembly plans, calibration plans, and corrosion plans to sustain production.

C.4.1.1 The contractor shall update and make available all production plans including quality documents, production lay outs that identify locations for assembly tasks, tooling, fixturing, production equipment, material storage, and preservation and storage of tooling to sustain production.

C.4.1.2 The contractor shall update and submit, IAW CDRL A013, all facility and facilitation plans to sustain production. The plans shall be detailed by contractor facility. The plans shall include plant and facility layout, and assembly tooling installation plans.

C.4.1.3 The contractor shall update and submit, IAW CDRL A013, a Manufacturing Management Plan…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .