Vendor Q&A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_Master_-_19-R-L817.pdf | ||
| Q&A_Master_-_19-R-L817.pdf | ||
| Q&A_Master_-_19-R-L817.pdf | ||
| Attachment_0002_-_Base_Contract_WOSB_Certification.pdf | ||
| Attachment_0001_-_Technical_Information_Questionnaire_(TIQ).docx | DOCX document | |
| CDRL_A001_Weld_Performance_Quality_Record.docx | DOCX document | |
| CDRL_A004_First_Article_Inspection_Report.docx | DOCX document | |
| CDRL_A008_Packaging_List.docx | DOCX document | |
| CDRL_A005_Final_Inspection_Report.docx | DOCX document | |
| CDRL_A003_Build_to_Print_Quality_Assurance_Program_Plan.docx | DOCX document | |
| CDRL_A007_Calibration_Certificate_Report.docx | DOCX document | |
| CDRL_A006_Material_Certification.docx | DOCX document | |
| CDRL_A002_Weld_Inspection_Report.docx | DOCX document | |
| W56HZV-19-R-L817.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q No. Doc Doc Ref Question/Comments Answer/Response Status 1 Solicitation Attachment
W56HZV‐19‐R‐L817, refers to Attachment 0001, but there is no attachment released in FedBizOps nor is it part of the RFP document. Similarly CDRLs are referenced, yet they are not part of the RFP package. Could you release them so that we can fully understand the solicitation?
Attachment 0001 and CDRLs uploaded to FBO as of Aug 30, 2019.
Answered
2 Solicitation Misc. Is this a women owned business set aside? Yes. See Sections H.1.5.5; H.2.1; L.4.1; and M.1.3.d. Answered 3 Solicitation Section L We are on the recipients list for the subject solicitation. We would like to meet with you briefly to discuss this contract and the relevant procedures and processes for us to bid on this work. Let me know what days/times work best for you.
The USG will not meet with, or discuss with, offerors on an individual basis. Refer to Section L ‐ Instruction, Conditions, and Notices to Bidders.
Answered
4 Solicitation Sections H, L, & M
Since this is an IDIQ with a site visit, which CLINs actually require pricing with the submission? I understand the CDRL’s, but the ordering years are confusing.
Only CLIN 0003 (CDRLs) requires offerors to provide pricing.
This solicitation will result in the award of Multiple Award (MA) Indefinite Delivery, Indefinite Quantity (IDIQ) contracts.
In accordance with (IAW) A.4.5, Delivery Orders will be solicited under the MA IDIQ and awarded based on a Lowest Price Technically Acceptable (LPTA) basis. Refer to Section L.4 for Evaluation Factors and eleigibility for the MA IDIQ contracts. Refer to Section M.1 for the Basis of Award of the MA IDIQ contracts. Refer to H.1.6 for the Evaluation Process for Delivery Order Proposals.
Answered
5 Solicitation Section I Will there be an amendment to the Build to Print solicitation to include NIST 800‐171 or CMMC compliance? In other words, will there be an amendment to require companies to be compliant to the policies outlines in NIST 800‐171 or
CMMC?
DFARS Clause 252.204‐7012 is incorporated in the RFP and addresses NIST 800‐171 compliance. CMMC compliance is still indevelopment and is not planned to be included in RFDOPs until Fall 2020.
Answered
6 Solicitation Section B To reduce any ambiguity with our submission on pricing, should our price each CDRL (1‐8) equal the sum of the NET AMT for CLIN 0003?
CLIN 0003 should be priced to include all CDRLs. SubCLINs A001 through A008 are NOT SEPARATELY PRICED (NSP) and are marked as such in the RFP.
Answered
7 TIQ Misc. If we can outsource, should we include those items as well or only those we can do directly in house?
Only in‐house capabilities should be listed. Answered
8 Solicitation Section A Can we get a one week extension on this solicitation? The USG does not intend to extend the closing date at this time.
Answered
9 Solicitation Section B If CLIN Item No. 0003 is the only item requiring pricing, what exactly are we pricing? The completing of each CDRL?
Yes. Answered
10 Solicitation Section B Please confirm that all that is being asked to be submitted is the following?:
* Pricing for CLIN Item No 0003
* Completed Attachment 0001
* Completed Attachment 0002
These are the only documents required of Section B. Answered
11 Solicitation Section L Would the government be willing to go to more than one location for the site visit or would everything need to be within the same property?
Yes, if the two locations have different equipment. However, both locations must be within the 50 mile radius as defined in the RFP.
Answered
12 TIQ Misc. Can we include teaming arrangements as in‐house capability? No, the work must be performed in‐house. Answered