TECHNICAL EXHIBIT 2 / Deliverables Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CombSynopsisSoli_W564KV16T0118.pdf | ||
| ATTACHMENT_2.pdf | ||
| ATTACHMENT_1.pdf | ||
| Technical_Exhibit_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 2 W564KV-16-T-0118
DELIVERABLES SCHEDULE
| Deliverable |
| Frequency |
| # of Copies |
| Medium/Format |
| Submit To |
Proof of recognition and certification as specialized firm (PWS para 1.6.15)
| Prior to Contract Award, revised as required |
| 1 Copy for the official file |
| Approved Contractor Format |
| KO |
Post-Award Meeting
Minutes from Post-
Award Meeting (PWS para 1.6.16)
• NLT 7 calendar days after award
• NLT 7 calendar days after meeting 1 Copy for the official file
MS Word by Email
COR and Contractor
Scheduled Meetings
• Minutes from the Meeting (Govt.)
• Contractor Rebuttal
(PWS para 1.6.4)
TBD
• NLT 7 calendar days after meeting
• NLT 7 calendar days after receipt of minutes
1 Copy for the official file
By Email
KO/COR and Contractor
TBD
• NLT 7 calendar days after meeting
• NLT 7 calendar days after receipt of minutes
1 Copy for the official file
MS Word by Email
COR and Contractor
Designation of Project Manager and an Alternate
(PWS para 1.6.2
| At Post Award Conference |
| 1 Copy for the official file |
| Approved Contractor Format |
| COR |
Quality Control Program
(PWS para 1.6.8) NLT 10 calendar days after contract award
1 Copy for the official file
| Approved Contractor Format |
| COR |
Certificates of AT Level I Training
(PWS para 1.6.12) NLT 30 calendar days after contract award
1 Copy for the official file
| Approved official form |
| COR |
Maintenance Checklist and Installation Report
(PWS para 5.2.3)
| NLT 30 calendar days after completion of maintenance |
| 1 Copy for the official file |
| Approved Contractor Format |
| COR |
TÜV Inspection Report
(PWS para 5.2.2)
| NLT 30 calendar days after completion of maintenance |
| 1 Copy for the official file |
| Approved Contractor Format |
| COR |
NOTE: Meeting minutes will be recorded by the Government, and distributed to the appropriate individuals *following any meeting. Should there be disagreement with the minutes, the Contractor will provide a written notification identifying areas of non-concurrence for joint resolution.