About this file

Amendment 0001

View the file

Other files

File Type Posted
W560MY16R0003FMPQuestionsfortheGovernment.pdf PDF
PWSforMoIForensicSupport2016FINAL_.pdf PDF
Attachment_0001PWS.pdf PDF
Attachment0002FMPPriceMatrix.xlsx XLSX spreadsheet
Attachment0003PPQ.pdf PDF
W560MY16R0003.pdf PDF
Attachment0005FMPEQUIP.xlsx XLSX spreadsheet
Attachment0004DD254.pdf PDF
PWS_for_MoI_Forensic_Support_2016-2017_(draft).pdf PDF
AFMP_PWS_12_August_2015.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2016JUL14

W560MY

ARMY CONTRACTING COMMAND - RI-C3

BLDG 60 RODMAN AVENUE

ROCK ISLAND , IL 61299-8000

NANCY B. DE BO

EMAIL: NANCY.B.DEBO.CIV@MAIL.MIL

W560MY-16-R-0003

2016JUN17

X

X 2016JUL25 01:00pm

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 14

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: NANCY B. DE BO

Buyer Office Symbol/Telephone Number: CCRC-RT/(309)782-7625

Type of Contract 1: Firm Fixed Price

Type of Contract 2: Cost No Fee

Kind of Contract: Service Contracts

*** End of Narrative A0000 ***

The purpose of Amendment 0001 is:

1. To respond to questions submitted in response to Request For Proposal (RFP) W560MY-16-R-0003. Reference Attachment 0006 which contains the questions and answers from industry.

2. To update the Performance Work Statement (PWS) dated 12 July 2016 (Attachment 0007), Section L - Instructions, Conditions, and

Notices to Offers and Section M - Evaluation Factors for Award.

3. Due to changes made to the Performance Work Statement and solicitation, the closing date and time for receipt of proposals has been extended to 25 July 2016, 1:00 PM Central Time. All proposals received after the time and date listed above will be considered late IAW

FAR 15.208(b) (1) and may not be considered for award. All proposals will be submitted via electronic mail to both the Contracting

Officer, Thomas Petkunas, email: thomas.a.petkunas.civ@mail.mil and Contract Specialist, Nancy DeBo, email: nancy.b.debo.civ@mail.mil.

4. All other terms and conditions remain unchanged and applicable.

*** END OF NARRATIVE A0002 ***

2 14

W560MY-16-R-0003 0001

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0006 QUESTIONS AND RESPONSES 12-JUL-2016

Attachment 0007 PERFORMANCE WORK STATEMENT 12-JUL-2016

3 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1. GENERAL INSTRUCTIONS. These instructions are a guide for preparing proposals in response to solicitation W560MY-16-R-0003. The instructions describe the extent of information the Offeror should provide and emphasize the significant topic areas the Offeror should address in its proposal. Each Offeror shall submit a maximum of one proposal.

NOTE: THE UNITED STATES GOVERNMENT (USG) WILL NOT REIMBURSE THE OFFEROR FOR COSTS INCURRED IN ASSOCIATION WITH THE PREPARATION OF

ITS PROPOSAL.

The Offeror is expected to review the Performance Work Statement (PWS) of this Request for Proposal (RFP) for further insight into the areas that the proposal must address. The Offeror should include in its proposal sufficient information to enable the USG to determine the Offeror's understanding of the requirements in each of the evaluated areas. Government facilities and Government Furnished Equipment

(FGE) (Attachment 0005) are to be considered when preparing proposals. OFFERORS ARE CAUTIONED THAT REPEATING LANGUAGE OF THE PWS WITH A

STATEMENT OF INTENT TO PERFORM DOES NOT REFLECT UNDERSTANDING OF THE REQUIREMENT.

Clarity and completeness are essential. Data not submitted with the proposal, but submitted previously or presumed to be known, will not be considered as part of the proposal. Proposals lacking such data or information may be considered technically unacceptable and eliminated from any further consideration. In other words, it is incumbent upon the Offeror to provide sufficient and detailed information that allows the USG to make an assessment of the Offeror's understanding and ability to successfully execute the FMP advisory effort.

L.2. POINT OF CONTACT. The Procuring Contracting Officer (PCO) is the point of contact for this acquisition. Any questions or concerns shall be addressed, in English, to the PCO and a copy provided to the Contract Specialist. E-mail is the preferred method of communication.

PCO for this acquisition: Mr. Thomas A. Petkunas

E-mail: thomas.a.petkunas.civ@mail.mil

Contract Specialist: Ms. Nancy DeBo

E-mail: nancy.b.debo.civ@mail.mil

L.3. STANDARD PROPOSAL INSTRUCTIONS. This section specifies the format each Offeror shall use in preparing their proposal. The intent is not to restrict the manner in which proposals are prepared, but rather to ensure a certain degree of uniformity in proposal format for evaluation purposes.

Four separate volumes shall be submitted. These volumes shall be self-contained and shall not be cross referenced, with the exception of the Price Volume. The Government prefers the use of blank pages as the Tabs/Dividers. Unless specifically requested, pricing information shall not be contained in any volume except the Price Volume. Proposals not structured In Accordance With (IAW) these instructions may be considered incomplete and may not be evaluated. The USG will not assume the duty to search for data or information to cure problems discovered in any proposal submitted. The burden of providing complete and thorough information to address the elements below remains with the Offeror. The proposal shall include the following volumes subject to the limitations discussed below:

Volume______ Title_____ Page Limit__________

I - Supplemental Documents No Limit

- Facility Clearance/Executive Summary 10 Pages

II Technical 60 Pages

III Past Performance No Limit

IV Price No Limit

* Exclusions. Each page shall be counted except for the following:

- Cover pages

- Table of contents

- List of figures

- Glossaries

- Tabs/Dividers

- Teaming Arrangements/Joint Ventures/Teaming Agreements

L.3.1. Offers shall be submitted via email to nancy.b.debo.civ@mail.mil and thomas.a.petkunas.civ@mail.mil. Offerors shall redact all company name/logos/pictures from all pages of the proposal with the exception of each volume cover page and the entire Price Volume. The electronic copies shall be submitted using Microsoft Office (MS) Word 2013 or later and, for the Price

4 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Matrix, MS Excel 2013 or later. The electronic submission of the Offeror's proposal shall be signed by an employee of the firm authorized to legally bind the organization.

L.3.2. Each page is defined as one sheet, one-side. Excess pages will NOT be read or evaluated. Page limitations do not prohibit the USG from requesting additional supporting data.

L.3.3. Offerors shall use a 12 point or greater, Times New Roman font. Font requirements apply to bullets and other special text formatting, including tables and graphic displays. Landscaped pages are acceptable for tables/graphic representations;

however, each landscaped page counts as two pages.

L.3.4. Proposal Organization. No classified material shall appear anywhere in the proposal.

L.3.4.1 All proposal volumes shall include:

L.3.4.1.1. Title page, a table of contents, and the body of the proposal. All factor and subfactor narratives shall be separated by a blank page and clearly identified.

L.3.4.1.2. List of Tables and Figures for each Volume.

L.3.4.1.3. Glossary of Abbreviations and Acronyms for each Volume.

L.3.4.2. At a minimum, all Title pages shall contain the following information:

L.3.4.2.1. Offeror's Proposal in response to Solicitation W560MY-16-R-0003 IAW solicitation instructions.

L.3.4.2.2. Volume Number and Title

L.3.4.2.3. Name and Address of Offeror

L.3.4.2.4. Date of Submission

L.3.4.2.5. Offerors Point of Contact information to include Phone Number and e-mail.

L.3.5. THE FREEDOM OF INFORMATION ACT (FOIA). FOIA and its amendment have resulted in an increasing number of requests from outside the USG for copies of contractors' proposals and other documents submitted to federal agencies. If an Offeror's submission contains information that it believes should be withheld from such requestors under FOIA on the grounds that it contains trade secrets and commercial or financial information [5 USC 552(b) (4)], the Offeror should mark its submissions in the following manner:

The following notice should be placed on the title page:

Some parts of this document, as identified on individual pages, are considered by the offeror to be privileged or confidential trade secret or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act.

Material considered privileged or confidential on such grounds is contained on page(s) ___.

Each individual item considered privileged or confidential under FOIA should be marked by placing the text within {brackets} with the following notice placed in the right margin: Privileged or Confidential.

Failure to do so may result in an involuntary release via a FOIA request.

L.4. VOLUME I - SUPPLEMENTAL DOCUMENTS AND PROOF OF FACILITY CLEARANCE FACTOR.

There is no page limit to this volume, except as noted below:

- Facility Clearance Documentation

- Completed and Signed Solicitation and any Amendments

- Executive Summary (10 page limit)

L.4.1. Facility Clearance. Offerors must provide proof of a current U.S. Facility Clearance at the SECRET level IAW Department ___________________ of Defense Directive (DODD) 5220.22, National Industrial Security Program Operating Manual. This SECRET level clearance requirement applies to affiliates, team members, subcontractors, etc., that will require access to classified information and require access to any US facilities.

Proof of a SECRET Facility Clearance shall be provided at the time of proposal submission and should include the following information: Name of company; company cage code; company facility clearance level; company Facility Security Officer (FSO)

5 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

contact information (name, phone number, email address). For those Offerors submitting a proposal as a newly formed partnership, Joint Venture, or Limited Liability Company, the requirement for a current Facility Clearance at the SECRET level can be satisfied through the submittal of documentation evidencing the fact that all of the partners or member companies of the partnership, Joint Venture, Limited Liability Company, etc., currently possess the required SECRET Facility Clearance, or at a minimum, those entities requiring access to classified information and any US facilities possess a current SECRET Facility

Clearance.

*** FAILURE TO HAVE SUBMITTED THE REQUIRED SECRET FACILITY CLEARANCE BY THE PROPOSAL CLOSING DATE SHALL RENDER THE OFFEROR

INELIGIBLE TO RECEIVE A CONTRACT AWARD AND, AS A RESULT, THE PROPOSAL WILL NOT BE EVALUATED ANY FURTHER.

L.4.2. Solicitation. Offerors must provide completed and signed copy of the solicitation including Sections A-K and any _____________

Amendments.

L.4.3. The Executive Summary: This should be a concise narrative of the entire proposal, including a highlight of any key or ______________________ unique features, excluding price. The Executive Summary will not be evaluated for purposes of determining contract award. As such, any summary material presented here shall not be considered as meeting the requirements for any portions of other proposal volumes. The Offeror shall, at a minimum, provide an overview of its proposal and accurately summarize all parts of the proposal, except for the Price Volume.

L.5. VOLUME II - TECHNICAL FACTOR. The Technical proposal shall describe the Offeror's understanding, processes, abilities, and experience to successfully execute all Forensic Mentorship Program requirements outlined in the PWS. The Offeror's Technical proposal shall include the following subfactors:

1. Management Plan

2. Quality Control Plan

3. Transition Plan In/Out

4. Contractors Personnel Qualifications

L.5.1. Subfactor 1.1 Management Plan:_____________________________________

The Management Plan shall be specific, detailed, and complete to clearly and fully demonstrate that the Offeror has the resources needed to acquire, train, maintain staffing levels, and provide Life Support, if not provided by the USG, to meet the requirements of the PWS. The document shall also include a chain of command structure for contractor personnel. The Offerors

Management Plan must fully explain that the offeror considered the operational and fiscal environment and provided a response that reasonably insures the ability to meet the Governments mission support requirements. It shall be specific, detailed, and complete to clearly and fully demonstrate a sound management approach and a thorough understanding of the actions, procedures, and timeliness to meet the start of full contract performance. It shall also include the details for recruiting and retaining the staffing necessary to reach full performance levels and maintain such throughout the life of the contract. Offeror shall include key position resumes (limited to two pages) and describe a sample representative skill set and how it relates to the requirements of the contract. Offeror shall include the following disclosure statement and signature:

"I consent to the disclosure of my resume, technical certifications (or other personal data) for evaluation purposes regarding the proposal submitted in response to RFP W560MY-16-R-0003."

This information shall not be disclosed to those without a need to know, and shall be used solely for evaluation purposes.

L.5.2. Subfactor 1.2 Quality Control Plan:__________________________________________

A Quality Control (QC) Plan shall be specific, detailed, and complete to clearly and fully demonstrate a sound technical approach, and a thorough understanding of quality methods and techniques for meeting performance standards and customer requirements. The Offeror will provide a plan for maintaining its Quality Control Program, specify methods and policies for personnel management and inventory management, and provide a plan for integration of the QC system into daily operations.

Offeror will specify methods to be used for communications with the Government and for measuring customer satisfaction in accordance with the PWS.

L.5.3. Subfactor 1.3 Transition Plan:_____________________________________

Transition Plan shall detail how the Offeror will prepare to become fully operational within the required 30-day timeframe.

The Transition Plan shall include a management and chain of command structure, schedules and milestones, and shall identify any technical or management issues that may arise and contingency plans if these issues arise. Transition plan shall demonstrate an understanding of maintaining operational requirements during the contracts de-mobilization phase as well and how the challenge of de-mobilizing will be met, while still maintaining operations until the end of the period of performance.

L.5.4. Subfactor 1.4 Contractors Personnel Qualifications:__________________________________________________________

Contractors Personnel Qualifications shall detail the persons qualification and experience levels necessary to fulfill the PWS requirements listed under paragraphs 1.6.10.1, 1.6.10.2, 1.6.10.2.1, 1.6.10.2.2, 1.6.10.2.3, 1.6.10.2.4. Offerors are required to submit resumes and letters of commitment for all personnel. All personnel must be able to obtain and maintain a

SECRET security clearance.

L.6 VOLUME III - PAST PERFORMANCE PROPOSAL. This volume shall include the following:

L.6.1. Reference Contracts. The Offeror shall provide documentation outlining its past performance with no more than three (3) ___________________ reference contracts, performed within the past three (3) years, as a prime or major subcontractor, which are the same or similar in size, complexity, and scope to the services being procured under this solicitation. IAW FAR 15.305(2) (ii), the

6 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Offeror may use past or current contracts (including Federal, State and local government) for efforts that are the same or similar to the required services. The following documentation shall be submitted for each contract/project cited:

The Offeror shall submit, within its Past Performance Volume, a list of all the POCs who were sent a questionnaires. The POC list shall be submitted in table format to include the following fields:

* Solicitation Number;

* Company Name;

* Contract Number;

* USG Agency;

* POC Last Name, First Name;

* POC Title; POC Telephone Number;

* POC e-mail Address; and

* Date the questionnaire was e-mailed to the POC.

L.6.2. The Offeror shall provide copies of any cure notices, letters of concern, corrective action requests, or show cause letters received on each contract listed and a description of when and what corrective action was taken by the Offeror or proposed subcontractor.

L.6.3. The Offeror shall provide the required information concerning termination actions for all contracts it has had for the past three (3) years and any currently in the process of such termination. The Offeror shall provide information as to why the termination occurred, as well as Contract Number, Price/Cost of the Original Award and the Final cost, Period of Performance, Name and email for the PCO, ACO, COR, and a copy of any Cure Notices or Show Cause letters received on each terminated contract. The Offeror will further explain the final results of each action, what corrective action was taken and when, date of termination, etc.

L.6.4. Past Performance Questionnaires. The Offeror shall provide, for all recent and relevant contracts identified, a Past

Performance Questionnaire (Attachment 0003 to Solicitation).

L.6.5. The Offeror shall provide information on recent and relevant past performance in the area of quality assurance applicable to recent and relevant past contracts.

L.6.6. The Offeror shall disclose information about previous Quality Deficiency Reports (QDRs), and other quality related problems.

L.6.7. The Offeror shall be clear and concise when describing the deficiency noted in the QDR, stating what corrective action was taken and when the corrective action was implemented.

L.6.8. The Offeror shall provide data explaining corrective actions that have been taken to improve its process and/or solve quality problems.

L.6.9. The Offeror shall describe and specify that a quality control checklist is maintained, as well as a customer feedback system.

L.6.10. The Offeror shall provide information regarding recent, relevant, past performance in the area of timeliness of services.

L.6.11. The Offeror shall demonstrate, through past performance information, the ability to mobilize personnel into the theater of operations, and the ability to handle surge and simultaneous operations.

L.6.12. The Offeror shall detail how they handled schedule slippages, and what corrective action was taken to ensure that additional slippages in the schedule did not occur.

L.6.13. The Offeror shall provide sufficient past performance details to support their ability to produce required deliverables and reports in a timely manner.

L.5.3. Past Performance Questionnaires. For all recent and relevant contracts identified, a Past Performance Questionnaire (Attachment_______________________________________

0003) must be completed and submitted. The Offeror shall complete Part I of the Past Performance Questionnaire and email the questionnaire to the representatives responsible for that contract.

The contract representatives shall be instructed to electronically complete Part II of the questionnaire and email the entire completed questionnaire directly to the Contract Specialist, Ms. Nancy DeBo, at email: nancy.b.debo.civ@mail.mil prior to the solicitation closing date and time as specified above. Untimely submitted questionnaires may not be considered.

The Offeror is reminded that both independent data and data provided by the Offeror in its proposal may be used by the Government to evaluate past performance. One method the Government uses to investigate past performance is to read the questionnaires submitted by the Offeror and, if it chooses, to interview the points of contact provided by Offeror, and to consult the Governments past performance information computer systems listed below. The Government does not assume a duty to conduct deeper investigations, but reserves the right to do so if it chooses.

The Government will consider only objective evidence of past performance, not rumors or unsubstantiated assertions. The Government will read past performance information submitted by Offerors and attempt to verify it using the methods indicated in this paragraph.

Unverifiable assertions will be considered, but may carry little weight. This subfactor will be evaluated on an assessment of the probability that the instant requirements will successfully be completed IAW the contract terms. In addition to the data provided by the Offeror, the Government may utilize the Federal Past Performance Information Retrieval System (PPIRS), information provided by the

Offeror and/or references, and any other information available to determine the quality and relevance of the Offerors past performance.

However, the burden of providing thorough, complete, and current information as requested herein remains with the Offeror. Proposals that do not contain the information requested within this solicitation risk rejection or a less than acceptable performance rating by the Government. In the event that an Offeror has no past performance history, the Offeror may submit past performance information for key personnel proposed to perform the contract requirements, if available.

7 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Recent, relevant past performance will be used as an indicator of the Offerors ability to perform the contract successfully. For the purpose of submitting proposals, recent is defined as occurring within the past three (3) years prior to the solicitations initial closing date. Relevant is defined as same or similar actions in terms of size, complexity, scope, and contract type performed under previously awarded contracts. Offerors shall provide a brief narrative explanation of how/why past performance is relevant; however, the Government reserves the right to determine whether an item/service is the same or similar. The Offeror will also provide any records from previous customers relating to their service performance.

L. 7. VOLUME IV - PRICE FACTOR. Proposed fixed unit rate / fully burdened hourly labor rates will be used by the Government to calculate the total evaluated price and award of the Base Year and exercise of any option year(s). The offeror shall provide proposed prices as follows:

L.7.1. The proposal shall include prices for all CLINs as reflected in Section B of the solicitation. Fixed Unit Rate(s) /

Fully Burdened Labor Rate(s), Fixed Unit Rate for Billeting, and Other Direct Costs (ODCs). The Cost Reimbursable (CR) CLINs are non-fee bearing; (profit/fee will not be applied to these CLINs). These costs may include, but are not limited to, the following: mobilization, demobilization, travel, housing, Cost of Living Adjustment (COLA), hazard pay, differential pay, equipment, and consumable equipment etc. The Government has provided plug amounts for the ODC CLINs in the Base and Option

Years for evaluation purposes only. Offerors ae required to propose a value for billeting. Although Government-provided billeting MAY be available, it is not guaranteed. Accordingly, the Offeror must propose a Fixed Unit Rate for Billeting, which must include the monthly housing cost per person, in the event that Government provided billeting is not available.

L.7.2. Offerors shall provide a completed Price Matrix (Attachment 0002 of the solicitation). Firm Fixed Price (FFP) Fixed

Unit Rate / Fully Burdened Hourly Labor Rates (including Defense Base Act (DBA) Insurance and profit/fee), shall be provided for all CLINs/Labor Categories in the base and option years. Fixed Unit Rate for Billeting / Monthly Housing Cost (Per

Person). All proposed Fixed Unit Rates / Fully Burdened Hourly Labor Rates are limited to two (2) decimal places.

Following are the instructions for completion of the Price Matrix:

L.7.2.1. The offeror shall fill in all cells highlighted in blue on the Price Matrix.

L.7.2.2. The following pricing periods apply for this effort:

Base Year: Date of Award through 365 days after award, Option Year 1: 366 days after award through 731 days after award, Option Year 2: 732 days after award through 1,097 days after award, Option Year 3: 1,098 days after award through 1,463 days after award, and

Option Year 4: 1,464 days after award through 1,830 days after award.

L.7.2.3. The offeror shall enter their full name and Cage Code in the spaces provided on the Price Matrix.

L.7.2.4. Offerors are required to propose binding firm fixed prices, as applicable. Failure to do so may result in the offer being rejected.

L.7.2.5. Offerors shall not make any changes or add any other information to the Price Matrix.

L.7.3. All prices for this acquisition shall be stated in current U.S. dollars. This shall also include escalation, if appropriate.

L.7.4. The offeror must provide additional information considered necessary to explain the proposed pricing. The Government's intention for Offerors to prepare a written Volume IV which shall be in Word format separate from the Attachment 0002 file that will incorporate the elements of L.3.4.1.1 and L.3.4.1.2

L.7.5. Any significant inconsistency between promised performance and proposed prices should be explained in the proposal. The Price

Matrix is supplied. All other information to support pricing shall be provided in the narrative of Price Volume IAW Section L. For example, if the use of new and innovative techniques has an impact on the proposed price, the offeror shall explain the impact on price.

If a management decision has been made to absorb a portion of the program costs that have not been included in the proposed pricing, that decision should be stated and quantified in the proposal. Any significant inconsistency, if not explained, raises a fundamental issue of the offerors understanding of the nature and scope of the work required. The burden of proof as to price credibility rests with the offeror.

8 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE L0002 ***

UPDATES:

1. Paragraph L.3 is hereby clarified to, "The Government requests offerors to use blank pages in their email proposal submission."

2. Paragraph L.3.1 is hereby clarified to, "Proposals will be submitted via email to nancy.b.debo.civ@mail.mil and also to thomas.a.petkunas.civ@mail.mil."

3. Paragraph l.5.4, Subfactor 1.4, is updated to, "Offeror is required to respond to the personnel qualifications in the PWS section

1.6.10.2.4"

4. The PWS has been updated to reflect the removal in reference to "GSA" vendors.

5. Paragraph L.7.2.6 is hereby removed. There is no hard copy requirement for the Price Matrix.

6. Paragraph L.7.4 is hereby updated for clarification. The Government's intention for Offerors to prepare a written Volume IV which shall be in Word format separate from the Attachment0002FMPPriceMatrix.xlsx file that will incorporate the elements of L.3.4.1.1 and

L.3.4.1.2

7. Paragraph L.7.5 is hereby clarified directing all other information to support pricing shall be provided in the narrative of the

Price Volume IAW Section L.

8. Attachment0002FMPPriceMatrix.xlsx, Summary Sheet, Paragraph 2, is hereby clarified that all Offerors are required to propose exactly the same plug ODC amounts as stated in Attachment0002FMPPriceMatrix.xlsx. These values shall not be adjusted based on the

Offeror's Technical Approach.

9. Attachment0002FMPPriceMatrix.xlsx, Columns E and G, is hereby clarified that Offerors are not permitted to change the number of

FTEs and/or the Productive hours per period as stated in Attachment0002FMPPriceMatrix.xlsx.

10. The PWS, Section 1.6.3, Page 2 and RFP Section B, confirms that the labor CLINs are Firm Fixed Price.

11. The PWS, Section 1.6.13, clarifies the Government will consider vehicle lease/fuel/and maintenance, if necessary, from Government approved vendors. The term "GSA" has been removed.

12. The PWS labor categories shall follow the Position Categories as stated on the Attachment0002FMPPriceMatrix.slsx.

13. The PWS, Section 1.6.9, the single point of contact (POC) shall be the Contractor's Program Manager. The Contractor shall not appoint any one (1) of the Forensic Expert Key Personnel as the Program Manager.

14. The PWS, Section 4.4.2 and RFP Section L.7.1, clarification that the Fixed Unit Rate for Billeting should include the Monthly

Housing Cost Per Person, submitted by each Offeror.

*** END OF NARRATIVE L0003 ***

9 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION M - EVALUATION FACTORS FOR AWARD

UPDATES:

1. Paragraph M.4.4, is hereby clarified that Volume IV is the appropriate place for this information. M.4.4 is hereby changed from

Volume III to Volume IV.

2. Paragraph M.5.1.1.4, Subfactor 1.4, is hereby clarified the Offeror is required to respond to the personnel qualification in PWS section 1.6.10.2.4

*** END OF NARRATIVE M0002 ***

M.1. BASIS FOR CONTRACT AWARD: This acquisition will utilize a Lowest Price Technically Acceptable Selection Approach authorized at FAR

15.101-2, when best value is expected to result from the selection of the technically acceptable proposal with the lowest price. There are three evaluation factors Technical, Past Performance and Price. The Government expects to award one firm-fixed price contract for one (1) Base Period (one (1) year, and four (4) one (1) year Option Periods, Option to Extend Services (FAR 52.217-8) (6 months), as a result of this solicitation. The Government reserves the right to: limit the competitive range for the purposes of efficiency; award without discussions; and make no award should no Offeror prove to submit an acceptable offer based on the criteria set forth in the solicitation. The Government will make an award to the responsible (IAW the Federal Acquisition Regulation (FAR 9.1) contractor whose offer conforms to the solicitation and is determined to be the most advantageous to the Government.

M.2. CORRECTION POTENTIAL OF PROPOSALS: The Government will consider, throughout the evaluation, the "correction potential" of any proposal uncertainty. The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of an

Offeror's proposal not meeting the Government's requirements is not considered correctable, the Offeror may be eliminated from the competitive range.

M.3. NUMBER OF CONTRACT AWARDS: The Government reserves the right to award no contract at all, depending on the quality of the proposals, prices submitted and the availability of funds. The Government intends to award one firm-fixed price contract inclusive of a

Base Period of one (1) year, four (4) one-year Option Periods and the Option to Extend Services (FAR 52.217-8) (6 months). All amounts represented in this solicitation are estimates only and do not bind the Government in any way. An award under this solicitation in no way obligates the Government to provide additional funds.

M.4. EVALUATION METHODOLOGY:

M.4.1.The evaluators will evaluate the Offerors proposals using the criteria outlined in this section. Evaluators shall review the Offerors proposals for errors, omissions, and ambiguities and provide the information to the PCO. The PCO will then review the information and obtain any necessary clarification from the Offeror. The Government intends to issue one award without discussions. However, should it be deemed necessary, then the PCO will determine the competitive range and formally open discussions.

M.4.2. Offerors will be evaluated on an acceptable/unacceptable basis for their proof of a current U.S. Facility Clearance.

Failure to have the required Facility Clearance by proposal submission shall make the Offeror rating unacceptable and the

Offeror shall be ineligible to receive a contract award. If the proposal lacks the appropriate facility clearance, the proposal will not be further evaluated and the proposal will be eliminated from any further consideration.

M.4.3. Technical Evaluators will prepare a written evaluation using the Proposal Evaluation Worksheet provided. In order for an Offeror to be rated as Acceptable for the Technical Factor, each of the four Subfactors identified must receive an

Acceptable Rating. The Subfactors to be rated are as follows:

Management Plan

Quality Control Plan

Transition Plan

Contractors Personnel Qualifications.

In addition, an Acceptable rating for the Past Performance proposal must also be received. The Government will only evaluate the Price Factor on those proposals that receive an Acceptable rating for the Facility Clearance, Technical, and the Past

Performance Factors. The Past Performance Team will prepare a written evaluation for each Offeror using the Past Performance

Questionnaire (Attachment 0003) prepared by the Offerors contract references. The written evaluation will provide an overall rating of Acceptable or Unacceptable for the Past Performance Factor with supporting narrative comments substantiating the basis for the rating as applied IAW the stated evaluation criteria of recent and relevant history, quality, and timeliness.

10 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

M.4.4. The Pricing Team will evaluate the Offerors submitted Price Matrix (Attachment 0002) and those portions of the Offerors

Volume IV Price Proposal for price reasonableness on FFP CLINs.

M.4.5. While discussions are not anticipated, if they are opened after the initial Technical and Past Performance reviews, the

Source Selection Authority (SSA) will review any submitted responses and document the results of these discussions.

M.4.6. The SSA will review the evaluations and make a final source selection decision according to the evaluation criteria delineated within the solicitation. The responsible Offeror who submits the proposal that represents the lowest price/technically acceptable offer, including Past Performance, to the Government shall receive the contract.

M.5. EVALUATION FACTORS: Those proposals determined to meet the Facility Clearance requirement will be evaluated on the following

Factors, with underlying Subfactors as described:

M.5.1 TECHNICAL FACTOR. The Government will evaluate the overall Technical Factor on an Acceptable/Unacceptable basis. In order for an Offeror to be rated as Acceptable for the Technical Factor, each of the four Subfactors identified must receive an

Acceptable Rating.

The descriptions of what are Acceptable and what is Unacceptable is as follows:

Technical Acceptable/Unacceptable Ratings

Rating Acceptable

Description - Proposal clearly meets the requirements of the solicitation.

Rating Unacceptable

Description - Proposal does not clearly meet the minimum requirements of the solicitation.

M.5.1.1 Technical Subfactors: The Technical Proposal, Volume I, shall address the following Subfactors:

M.5.1.1.1 Subfactor 1.1 Management Plan:

Offerors Management Plan will be evaluated to determine if the plan is sufficiently specific, detailed and complete to clearly and fully demonstrate that the Offeror has resources needed to acquire, train, maintain staffing levels and provide Life Support to meet the requirements of the PWS. The evaluation shall include a review of the Offerors chain of command structure for contractor personnel. The Offerors Management Plan must show that the offeror considered the operational and fiscal environment and provided a response that reasonably ensures the ability to meet the Governments mission support requirements. It shall clearly and fully demonstrate a sound management approach and a thorough understanding of the actions, procedures, and time management to meet the start of full contract performance. It shall also include the details for recruiting and retaining the staffing necessary to reach full performance levels in accordance with the PWS.

Acceptable: The Offerors Proposal demonstrates a plan that is sufficiently specific, detailed and complete to clearly and fully demonstrate that the Offeror has resources needed to acquire, train, maintain staffing levels and provide Life Support to meet the requirements of the PWS. The proposal includes a review of the Offerors chain of command structure for contractor personnel. The Offerors Management Plan shows that the offerors considered the operational and fiscal environment and provided a response that reasonably ensures the ability to meet the Governments mission support requirements. The Management plan is specific, detailed and complete enough to clearly and fully demonstrate a sound management approach and a thorough understanding of the actions, procedures, and timeliness to meet the start of full contract performance. The Management Plan also includes the details for recruiting and retaining the staffing necessary to reach full performance levels in accordance with the PWS.

Unacceptable: The Offerors Proposal does not demonstrate a plan that is sufficiently specific, detailed and complete to clearly and fully demonstrate that the Offeror has resources needed to acquire, train, maintain staffing levels and provide Life Support to meet the requirements of the PWS. The proposal did not include a review of the Offerors chain of command structure for contractor personnel. The Offerors Management Plan did not show that the offeror considered the operational and fiscal environment and provided a response that reasonably insures the ability to meet the Governments mission support requirements. The Management plan is not specific, detailed and complete enough to clearly and fully demonstrate a sound management approach and a thorough understanding of the actions, procedures, and timeliness to meet the start of full contract performance. The

Management Plan did not include the details for recruiting and retaining the staffing necessary to reach full performance levels in accordance with the PWS.

11 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

M.5.1.1.2 Subfactor 1.2 Quality Control Plan:_____________________________________________

A Quality Control (QC) Plan will be evaluated to determine if the Offerors plan is sufficiently specific, detailed and complete to clearly and fully demonstrate a sound technical approach, and a thorough understanding of quality methods and techniques for meeting performance standards and customer requirements. The Offeror shall provide a plan for maintaining the Quality Control program, specify methods and policies for personnel management and inventory management; provide a plan for integration of the QC system into daily operations; specify methods to be used for communications with the Government, and measuring customer satisfaction in accordance with the PWS.

Acceptable: The Offerors Proposal demonstrates a plan that is specific, detailed and complete enough to clearly and fully demonstrate a sound technical approach, and a thorough understanding of quality methods and techniques for meeting performance standards and customer requirements. The Offeror provided a plan for maintaining the

Quality Control program, specified methods and policies for personnel management and inventory management;

provided a plan for integration of the QC system into daily operations; specified methods to be used for communications with the Government, and measuring customer satisfaction in accordance with the PWS.

Unacceptable: The Offerors Proposal does not demonstrate a plan that is specific, detailed and complete enough to clearly and fully demonstrate a sound technical approach, and a thorough understanding of quality methods and techniques for meeting performance standards and customer requirements. The Offeror did not provide a plan for maintaining the Quality Control program, specify methods and policies for personnel management and inventory management; provide a plan for integration of the QC system into daily operations; specify methods to be used for communications with the Government, and measuring customer satisfaction in accordance with the PWS.

M.5. 1.1.3 Subfactor 1.3 - Transition Plan:__________________________________________

Transition Plan will be evaluated to determine how the Offeror will prepare its company to become fully operational within the required 30-day timeframe. The Transition Plan shall include a management and chain of command structure, schedules and milestones, and shall identify any technical or management issues. Transition plan shall demonstrate an understanding of maintaining operational requirements during the contracts de-mobilization phase and how this challenge of de-mobilizing will be met while maintaining operations.

Acceptable: The Offerors Transition Plan demonstrates that the Offeror has the ability to become fully operational within the required 30-day timeframe. The Offerors Transition Plan includes a management and chain of command structure and proposed schedule and milestones, and identifies any technical or management issues. The Transition plan demonstrates an understanding of maintaining operational requirements during the contracts de-mobilization phase and how this challenge of de-mobilizing will be met while maintaining operations.

Unacceptable: The Offerors Transition Plan does not demonstrate that the Offeror has the ability to become fully operational within the required 30-day timeframe. The Offerors management and chain of command structure, proposed schedules and milestones are not included and any technical or management issues are not identified. The transition plan does not demonstrate the Offerors understanding of maintaining operational requirements during the contracts de-mobilization phase and does not explain how this challenge of de-mobilizing will be met while maintaining operations.

M.5. 1.1.4 Subfactor 1.4 Contractors Personnel Qualifications:______________________________________________________________

Contractors Personnel Qualifications shall detail the persons qualification and experience levels necessary to fulfill the PWS requirements listed under paragraphs 1.6.10.1., 1.6.10.2.1., 1.6.10.2.2., 1.6.10.2.3., 1.6.10.2.4.

The Offerors are required to submit resumes and letters of commitment. All personnel must be able to obtain and maintain a secret security clearance. Resumes shall be limited to two pages and describe a sample representative skill set and how it relates to the requirements of the contract.

Acceptable: The Offerors Proposal details the Contractors Personnel qualifications and credentials as identified in the PWS paragraphs 1.6.10.1., 1.6.10.2.1., 1.6.10.2.2., 1.6.10.2.3., 1.6.10.2.4. The Offeror submitted resumes and letters of commitment. All personnel are able to obtain and maintain a secret security clearance.

Unacceptable: The Offerors Proposal does not detail the Contractors Personnel qualifications and credentials as identified in the PWS paragraphs, 1.6.10.1., 1.6.10.2.1., 1.6.10.2.2., 1.6.10.2.3., 1.6.10.2.4. The Offeror did not submitted resumes and letters of commitment. All personnel are not able to obtain and maintain a secret security clearance.

M.5.2. PAST PERFORMANCE FACTOR: The Government will evaluate Past Performance on an Acceptable/Unacceptable basis. The descriptions of what are Acceptable and what is Unacceptable is as follows:

Rating Acceptable

12 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Description - Based on the offerors performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offerors performance record is unknown.

Rating Unacceptable

Description - Based on the offerors performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have an Unknown Past Performance. In the context of acceptability/unacceptability, Unknown shall be considered Acceptable.

The past performance evaluation results is an assessment of the offerors probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offerors record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements.

1. Did the Offeror provide documentation outlining its past performance with a list of three (3) contracts within the past three (3) years, as a prime or major subcontractor, which are the same or similar in size, complexity, and scope to the services being procured under this solicitation?

2. Did the Offeror provide copies of any cure notices, letters of concern, corrective action requests, or show cause letters received on each contract listed and a description of any corrective action by the Offeror or proposed subcontractor?

3. Did the Offeror provide the required information concerning termination actions for all contracts it has had for the past three (3) years and any currently in the process of such termination?

4. Past Performance Questionnaires. Did the Offeror provide, for all recent and relevant contracts identified, a Past

Performance Questionnaire (Attachment 0003)?

5. Did the Offeror provide information on recent and relevant past performance in the area of quality assurance applicable to recent and relevant past contracts?

6. Did the Offeror disclose information about previous Quality Deficiency Reports (QDRs) and other quality related problems?

7. Was the Offeror clear and concise when describing the deficiency noted in the QDR, stating what corrective action was taken and when the corrective action was implemented?

8. Did the Offeror provide data explaining corrective actions that have been taken to improve its process and/or solve quality problems?

9. Did the Offeror describe and specify that a quality control checklist is maintained, as well as a customer feedback system?

10. Did the Offeror provide information regarding recent, relevant, past performance in the area of timeliness of services?

11. Did the Offeror demonstrate, through past performance information, the ability to mobilize personnel into the theater of operations, and the ability to handle surge and simultaneous operations?

12. Did the Offeror detail how they handled schedule slippages, and what corrective action was taken to ensure that additional slippages in the schedule did not occur?

13. Did the Offeror provide sufficient past performance details to support their ability to produce required deliverables…