ATT_0020_QARESPONSES_AMD02_12FEB2021.pdf
PDF 131 KB Posted
- Attached to
- Hazardous Materials Supply Operation (HMSO)
- Solicitation number
- W52P1J-21-R-0012
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001, Attachment 0007 Service Contract Act Wage Determinations Amendment 0001 includes a new Attachment 0007, which adds WD
2015-5455, Rev. 14. The WDs for all other locations provided with this new Attachment 0007 reverted to a prior revision number. For example, the Attachment 0007 provided with the original solicitation included WD 2015-5681, Rev. 11, dated 12/21/2020 while the Attachment 0007 provided with Amendment 0001 includes WD 2015- 5681,Rev. 10, dated 07/27/2020. The WDs dated 12/21/2020 include the 2021 Executive Order 13658 minimum wage. Would the Government confirm that Offerors are to use the WDs provided with Amendment 0001’s Attachment 0007 and not the current WDs for all locations? If this is incorrect, would the Government provide the current WD for all locations? A new Attachment 0007 is being provided
Attachment 0007 Service Contract Act Wage Determinations
Attachment 0007 includes the following SCA WDs for Alaska: 2015- 5683 for Fairbanks North;
2015-5681 for Anchorage, Anchorage Matanuska-Susit;
Fort Greely, AK is not within these boroughs and appears to fall under WD 2015-5687. Would the Government specify which WD Offerors are to use to price work at Fort Greely, AK? A new Attachment 0007 is being provided
Attachment 0019 Q&A Responses and Amendment 0001, Section A, page 2
Attachment 0019 Q&A 1 indicates that L.5.2.1.1(c)(4) was to be revised to remove the requirement to provide a Position Description within Attachment 0002. Amendment 0001 section L.5.2.1.1(c)(4) still includes this requirement. Would the Government provided an updated section L.5.2.1.1(c)(4) with the position description requirement removed? Updated the requirements at section L.5.2.1.1(c)(4) to remove the words "Position Description" and replace with "Duty Title".
RFP, Page 57,L.5.4.2 Cost/Price Proposal Specific Instructions. L.5.4.2.1
RFP States, “The Offeror shall submit a table of contents outlining all of the documents (by document file name) comprising the Offeror's Cost/Price Volume." As part of the list of documents being submitted and included in the ToC does the government want and expect a cost/price narrative describing or methodologies of how we developed our pricing?
No, See L.5.4 for cost price instructions.
TD-01 Historical Workload Can the Government please clarify what positions receive a HAZMAT pay differential and whether it is 4% or 8%?
It is up to the contractor to quote in accordance with the Service Contract Act and its pay differentrial for HAZMAT if required.
PWS 1.4.5 Attachment 0001; Attachment 0002, Attachment 0005 The Government states that "The contractor shall provide a Project
Manager (PM) no later than the full operational capability (FOC) date and throughout the period of performance of this effort. Additionally, the contractor will designate an alternate PM to be available in the event the PM is absent or otherwise unavailable. The contractor’s PM and designated alternate shall be authorized to act on behalf of the contractor for all matters relating to this contract. The contractor shall provide the PM (and alternate) name and contact information in writing to the KO. The PM or designated alternate shall be available during normal operational hours and for contact with the Government during all other times. The PM or designated alternate may be required to attend briefings, conferences, and other Government designated meetings as required in the execution of this effort or as requested by the COR" however, neither Attachment 0002 or Attachment 0005 accommodate a PMO CLIN. Will the Government provide a CLIN for PMO? Will the Government state at which location the PM will be located?
This is a business decision for each respective contractor on how the PM is proposed and where the PM is located.
ATT 0007
The Government indicated that an updated Attachment 0007 replaced 15-5447 with 15-5455 however only the original WD is present in the "revised" Attachment 0007. Additionally there are more current WDs available. Will the Government update Attachment 0007 will the most current WDs to be used in this solicitation A new Attachment 0007 is being provided
ATT 0007 Will the Government incorporate the newest WD in the solicitation?
A new Attachment 0007 is being provided
ATT 0011 One of our contract references has an end date that goes beyond 12/31/2025 with all options exercised. When entering this date in Column J we receive an error stating, "This value doesn't match data validation restrictions defined for this cell." Would the government provide an updated Att0011_Contract+References+Spreadsheet which allows entry of dates beyond 12/31/2025? For any contracts that have an end date past 12/31/2025, please use 12/31/2025 for contract end date.
Ready to be Posted
File details come from the government source that posted it. Updated .