20Q3002-Amendment 0001.pdf
PDF 138 KB Posted
- Attached to
- Pull Ring and Chain Assembly Federal contract opportunity
- Solicitation number
- W52P1J-20-Q-3002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Exhibit B - CDRL A002 - Technical Report - Certificate of Analysis and Material Certification.PDF | ||
| Exhibit A - CDRL A001 - Test Inspection Report - First Article.pdf | ||
| Attachment 0001 - Pull Ring and Chain Assembly Price Matrix.xlsx | XLSX spreadsheet | |
| W52P1J-20-Q-3002 - Pull Ring and Chain Assembly Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0001 is to answ er clarif ication questions and extend the closing date.
Response date is extended to 2 December 2019, 12:00 PM CT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Nov-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J20Q3002
X 9B. DATED (SEE ITEM 11)
15-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Nov-2019
CODE
ARMY CONTRACTING COMMAND ROCK ISLAND
CCRC-IS
BLDG 60, 3RD FLOOR
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W52P1J20Q3002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
1. The purpose of Amendment 0001 to Solicitation W52P1J-20-Q-3002 is to respond to questions and extend the closing date as follows:
Questions/Answers:
Question a: The assembly consists of the chain and one pull ring only (there must already be one ring on the smoke pot?). Drawing 36-1-300 shows two rings on the finished pot, but drawing PL36-1-300 (which is the bill of material) only calls out one pull ring.
Answer a: The Pull Ring and Chain Assembly comes with one pull ring. The fuzes arrive with the other pull ring attached to it with a cotter pin. Pine Bluff Arsenal (PBA) attaches the free end of chain to the fuze pull ring. There are two pull rings on the Smoke pot drawings. The contractor will supply only one at the end of that chain.
Question b: Also on drawing PL36-1-300, the 3rd, 4th and 5th items on this BOM list are not part of the finished Pull Ring and Chain Assembly?
Answer b: If the contractor is referencing the fuze adapter, Smoke pot and clamp. This would not be associated with pull ring and chain assembly.
Question c: Drawing 13-10-9 requires salt fog testing for the Pull Ring. Is salt fog testing required for the chain also?
Answer c: The salt fog testing requirement is still active and required on the chain also. It is no longer listed in the drawing. It has been moved to MIL-DTL.
Question d. MIL-DTL-51353 is controlled distribution and is locked on Quick Assist. Can the government provide this specification?
Answer d: This specification is Distribution D. This specification is provided as Attachment 0006.
Question e. MIL-DTL-11522 and NOR 782-0105-002 are not on Quick Assist. Can the government provide these.
Answer e: This specification and NOR are Distribution D. The specification is provided as Attachment 0007 and the NOR is provided as Attachment 0008.
Question f. FAT due 30 days AFATA. This is very aggressive considering the items must undergo salt fog testing. Recommend 60 days AFATA.
Answer f: The salt fog testing requirement is not a change from previous requests, therefore, FAT due 30 days after contract award is appropriate. Production quantity is due 30 days AFATA.
2. Response date is extended from 27 November 2019, 12:00 PM CT to 2 December 2019, 12:00 PM CT.
W52P1J20Q3002
3. All other terms and conditions remain unchanged.
4. Point of Contact is Cindy Witherspoon, E-Mail cindy.s.witherspoon.civ@mail.mil
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Nov-2019 12:00 PM to 02-Dec-2019 12:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .