W52P1J19R5001_Amendment_4.pdf
PDF 554 KB Posted
- Attached to
- Bldg 211 Roof Repair
- Solicitation number
- W52P1J19R5001
About this file
Amendment 0004
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2006-0669
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See summary of changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W52P1J19R5001
X 9B. DATED (SEE ITEM 11)
02-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Feb-2019
CODE
ARMY CONTRACTING COMMAND ROCK ISLAND
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W52P1J19R5001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
The purpose of this amendment is to answer the following contractor questions:
Q1. Will interior protection be required?
A1. The contractor is required to protect existing conditions and minimize disruption to the tenants. See the Scope of Work Item 1.2.6 and Specification section 02 41 00 Demolition.
Q2. Are 4 roof drain replacements required for both base bid AND option 1?
A2. Yes. Keynote 2 on Sheet A-102 indicates replacing 4 drains and Keynote 2 on Sheet A-104 indicates replacing 4 drains.
Q3. Question/answer #11 in amendment #2 states there are no masonry specifications. Contractor judgement?
A3. The contractor shall make repairs in accordance with Keynote 10 on Sheet A-102 and standard construction means and methods for the type of repair noted.
Q4. Extent of paint only for the repaired concrete areas or the entire wall section?
A4. The paint covers only the repaired concrete areas.
Q5. Are there any specifications for the paint material? Or contractor judgement?
A5. Paint shall be PPG Perma-Crete High Build 100% Acrylic Coating or the equivalent. Apply paint according to manufacturer's instructions. Match adjacent color.
Q6. On G-005, Bid Options 2 and 3 it states that all roof drain heights are to be adjusted to accommodate the additional insulation thickness. If you look at the questions below and only 4 roof drains are figured to be replaced in the base bid and 4 in the bid option 1 then are we to figure on replacing all the roof drains, main and overflow, with bid options 1 and 2 or could we figure on just installing drain extensions on the drains not being replaced?
A6: Roof drain extensions are an acceptable method to raise the drain height.
Q7. On the drains that are figured to be replaced do we need to account for re-insulating the drain bodies and piping?
W52P1J19R5001
A7: Yes, this is covered in the cutting and patching specification.
Q8: Also, how much piping below the deck from the drain are we to figure on replacing?
A8: This is for the contractor to determine. The piping can be readily seen below the deck in both areas. The contractor should request an additional site visit if they wish to verify existing conditions.
Q9: Related the 2nd question below. If we figure on replacing 4 roof drains on each section and it is found that more are going to need to be replaced will you have a unit price line item on the solicitation for us?
A9: We do not anticipate replacing more than 4 roof drains, so a unit price for additional drains is not necessary.
All other terms and conditions remain unchanged.
(End of Summary of Changes)
File details come from the government source that posted it.