This is an amendment to a solicitation for the manufacture and delivery of TNT and PBXN-9 Supplementary Charges from fiscal year 2019 through 2023. The amendment provides clarification on technical issues, drawings, and process maps. It adjusts the production delivery timeline to 300 days and confirms other key dates. The solicitation will be issued by the Army Contracting Command-Rock Island on behalf of the Office of Project Manager Combat Ammunition Systems and is restricted to US and Canadian offerors. Awards of up to two firm fixed price IDIQ contracts with a minimum $5,000 guarantee and maximum $69.9M ceiling are expected to cover the five one-year ordering periods. First article testing is required with delivery FOB origin to locations specified in delivery orders.

Amendment 0002

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

CHET A. JACKS

EMAIL: CHET.A.JACKS.CIV@MAIL.MIL

W52P1J-17-R-0088

2018JUN29

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 8

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: CHET A. JACKS

Buyer Office Symbol/Telephone Number: CCRC-AC/(309)782-4952

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0002 for Solicitation W52P1J-17-R-0088 is to:

1. Provide the following clarifications:

a. Issue: Drawing 13026064, Rev E PBXN-9 Supplementary Charge Assembly:

1). Part No. Or Identification No. block for item 6 lists drawing number as 13023710 for Adhesive, Sealant

2). Note #7 on the drawing identifies the adhesive as 13027310

3). TDPL13026064, Sheet 1 and Adhesive, Sealant Drawing number listed as 13027310

It appears that the Adhesive, Sealant drawing number is transposed in the ID Block on the referenced drawing.

Clarification: Sealant number 13023710 is incorrect. The correct part number is 13027310

b. Issue: Solicitation, page 2 and 6, Part Number for CLIN 0001, TNT Supplementary Charge is identified as

8838130. The part number as called out is in error. It should be 8797090.

Clarification: Part number should read 8797090.

c. Issue: Contract C Requirements- Revision-A, TDPL 8797090 Supplementary Charge Assembly, Page 2 19-48-4116/44H (Appendix 44H) is reflected to Add, and also reflected under the delete column.

Please confirm if intent is to add. Also, please verify if the following are intended to be removed as reflected by "X" under the delete column: 19-48-4116, ACV00831

Clarification: 19-48-4116/44H is to be added to TDPL 8797090 NOT deleted. It should be included in both TDPLs. 19-48-4116 and ACV00831 are both applicable and are not to be deleted.

d. Issue: Contract C Requirements: TDPL 13026064 PBXN-9 Supplementary Charge Assembly. Confirm if the following are to be applicable: 19-48-4116, ACV00831

Clarification: 19-48-4116 and ACV00831 are both applicable and are not to be deleted.

e. Issue: Reference Solicitation, page 3, Option Two, states the following: For CLIN associated with PBXN-9 Supplementary Charges

(NSN 1320-01-583-1139), there is a combined maximum of 10 slides for sub-factor 1, sub-factor 2, and sub-factor 3.

Reference Solicitation, page 77, submission for an Oral Presentation states the following: For CLIN associated with PBXN-9 Supplementary

Charges (NSN 1320-01-583-1139): Sub-factor 1 Production Capability: maximum of 35 slides Sub-factor 2 Quality System: maximum of 35 slides Sub-factor 3 Management System: maximum of 10 slides.

Please clarify and provide the maximum number of slides allowed for each sub-factor.

Clarification: Page 77 should read the same as Page 3.

f. Issue: Reference Solicitation, Section B, page 6-7, lists four (4) CLINS and the Pricing Matrix identifies only two (2) CLINS.

Please confirm that CLINs 0003 and 0004 are not be priced separately.

Clarification: The Pricing Matrix only applies to CLINs 0001 and 0002. CLINs 0003 and 0004 provide a list of the CDRLs the offeror will be required to submit if it is awarded a contract. The CDRLs list is found in Exhibit A and not B as stated.

g. Issue: References:

a) Exhibit A Contract Data Requirements List

2 8

W52P1J-17-R-0088 0002

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

b) Attachment 0004 Instructions for Completing DD Form 1423

If CLINS 0003 and 0004 (CDRLS), are not to be priced separately, does Blocks 17 and 18 of Exhibit A, Contract Data Requirements List need to be filled out for each CDRL as per the instructions?

Clarification: Block 17 and 18 are not applicable to this solicitation. Please disregard.

h. Issue: Reference Solicitation, page 6, Section B, CLINS 0001 and 0002 requires First Article Test (FAT) quantities to be due 180 days after delivery order award date.

As the Government is aware that there are only limited sources available to procure TNT and PBXN-9 and the lead time to obtain these materials is considerable, the requirement of 180 days for FAT may not be viable. Would the Government consider reassessing this requirement?

Clarification: The United States Government (USG) takes into account the long lead time required to procure TNT or PBXN-9 when placing delivery orders.

i. Issue: Reference Solicitation, page 6, Section B, CLINS 0001 and 0002 requires production quantities will be due 300 days after delivery order award date. In order for us to provide the best proposal with a competitive pricing we respectfully request the following:

a) Approximate award date

b) Required or minimum monthly delivery requirements for each CLIN

Clarification: The USG anticipates awarding the first production Delivery Order (0002), 2nd quarter fiscal year 2019. Minimum monthly delivery requirements can be found on page 87, section M.4.1.1.1 of the solicitation.

h. Issue: Reference Solicitation, page 2, paragraph 5, Technical Proposal Submission Option One. Since TNT and PBXN-9 Supplementary

Charges are similar items except for the explosives and since we intend to, would USG consider accepting Option 1 for both if we meet all the requirements of Option 1 for only one of the Supplementary Charges.

Clarification: The USG will consider only one DD 250 for Option 1 provided it is for the PBXN-9 and the offeror intends to use the same facilities, equipment, and processes to Load Assemble Pack both the TNT and PBXN-9.

j. Issue: Section L, Paragraph L 4.1.1.1. sub-paragraph c) states: "25,000 each TNT and/or PBXN-9 Supplementary Charges per month."

Should a contractor be awarded a delivery order for both TNT and PBXN-9 Supplementary Charges is the combined required deliverable quantity 50,000 total supplementary charges per month?

Clarification: If a Contractor is awarded a delivery order for both the TNT and PBXN, the total quantity combined will not exceed 25,000 units per month.

k. Issue: Section A, Para d states " .... (IMS) that shall include Contract Data Requirement Lists (CDRL) Exhibit A, First Article

Requirements (including vendor/sub-contractor), equipment prove-out, holiday/maintenance days, and Contractor Furnished Material (CFM)

Understanding there is no Government Furnished Material (GFM) offered, is the accurate interpretation of "Customer Furnished Material

(CFM)" simply the delivery schedule for vendor/sub-contractor materials to the prime contract holder?

Clarification: Correct

l. Issue: Are there any restrictions on sourcing for TNT powder as long as the supplier meets all applicable military standards and specifications?

Clarification: No

m. Issue: Sections L.4.3.1 "Section 1 Contract References ... using Past Performance Questionnaire ..." and L.4.3.3: "... The offeror shall include these documents in Volume 3, Section 2 ... " appear to conflict with each other as to which section the questionnaires should be included within.

Clarification: Section L.4.3.3 is revised to read: The contract information to be provided with each contract reference is on the PPQ, Attachment 0002. The Offeror must complete PPQ Sections IIA and IIB for each contract reference and send copies of the PPQ to the respondent(s) Point of Contact (POC) as identified in IIA in a timely manner. The PPQ respondent(s) will send the completed questionnaire directly to the USG POC as shown in Section IV of the PPQ.

2. The following drawings are being provided (PBXN) as Attachment 0010:

3 8

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

13031073 Rev B, DISC

13023710 RTV Rev A, ADHESIVE SEALANT

13027312 Rev B, TAPE

13027374 Rev C, TAB

The TNT has the same components but different drawing numbers:

8858820 Rev. H, DISC

12913704 Rev. J, ADHESIVE SEALANT

12624403 Rev. J, TAPE

8848866 Rev. R, TAB

3. A sample Process Map has been included as Attachment 0009.

4. CLIN 0002 is revised to read Production quantities will be due 300 days after delivery order award date.

5. The closing date remains at 16 August 2018 at 4:30 pm CT.

6. All other terms and conditions remain unchanged.

*** END OF NARRATIVE A0003 ***

4 8

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 TNT SUPPLEMENTARY CHARGE ________________________

Noun: TNT Supplementary Charge

NSN: 1320-00-824-0811

P/N: 8797090

*Do not submit pricing info in Section B for any CLIN.

All pricing shall be submitted on the Price Matrix, Attachment 0001.

Maximum Dollar Amount: $20,752,981.86. The Government is under no obligation to purchase any quantities beyond the minimum ordering obligation.

FOB POINT: Origin

First Article Test (FAT) quantities will be due 180 days after delivery order award date. The Government response time to approve FAT is 30 days (210 days after delivery order award date).

Production quantities will be due 300 days after delivery order award date. If FAT is waived, production quantities will be due 210 days after delivery order award date.

The days listed above apply only to the first delivery order. On all subsequent delivery orders the USG reserves the right to waive additional FATs should the contractor request one.

(End of narrative B002)

0002 PBXN-9 SUPPLEMENTARY CHARGE ___________________________

Noun: PBXN-9 Supplementary Charge

NSN: 1320-01-583-1139

P/N: 13026064

*Do not submit pricing info in Section B for any

CLIN. All pricing shall be submitted on the Price

Matrix, Attachment 0001.

Maximum Dollar Amount: $49,135,753.59. The

Government is under no obligation to purchase any quantities beyond the minimum ordering obligation.

FOB POINT: Origin

First Article Test (FAT) quantities will be due 180 days after delivery order award date. The Government response time to approve FAT is 30 days

5 8

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(210 days after delivery order award date).

Production quantities will be due 300 days after delivery order award date. If FAT is waived, production quantities will be due 210 days after delivery order award date. The days listed above apply only to the first delivery order. On all subsequent delivery orders the USG reserves the right to waive additional FATs should the contractor request one.

(End of narrative B002)

6 8

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0009 PROCESS MAP EXAMPLE 18-JUL-2018 012

Attachment 0010 PBXN DRAWINGS 18-JUL-2018 004

7 8

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

For CLIN associated with PBXN-9 Supplementary Charges (NSN 1320-01-583-1139), there is a combined maximum of 10 slides for sub-factor 1, sub-factor 2, and sub-factor 3 total which addresses program changes required for this alternative. The maximum number of slides is not inclusive of the IMS and the Process Flow Diagram.

*** END OF NARRATIVE L0002 ***