Performance Requirements Summary and Quality Assurance Surveillance Plan

View the file

Other files

File Type Posted
Tooele_Vehicle_Repair_Pricing_Matrix_10Mar2016_-_FEDBIZOpps.xlsx XLSX spreadsheet
W52P1J-16-T-3012_Amendment_0003.pdf PDF
Tooele_Vehicle_Repair_Pricing_Matrix_12Feb2016_-_FEDBIZOPPs.xlsx XLSX spreadsheet
W52P1J-16-T-3012_Amdmt_0002.pdf PDF
W52P1J-16-T-3012_Amdmt_0001.pdf PDF
SCA_Wage_Determination_05-2531 _Revision_-_17_dated_29_Dec_2015.pdf PDF
DDForm_1423_Pg_2.pdf PDF
Tech_Exhibit_4.pdf PDF
DD_Form_1423_Pg_1.pdf PDF
W52P1J-16-T-3012.pdf PDF
Tech_Exhibit_6.pdf PDF
Tech_Exhibit_5.pdf PDF
PRAG_FORM_2_dtd_12Feb2016.docx DOCX document
PRAG_FORM_1_dtd_12Feb2016.docx DOCX document
Tooele_Vehicle_Repair_Pricing_Matrix_12Feb2016.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS

SUMMARY (PRS)

AND

QUALITY ASSURANCE SURVEILLANCE

PLAN (QASP)

Technical Exhibit 1

TECHNICAL EXHIBIT 1

PERFORMANCE REQUIREMENTS SUMMARY (PRS) and Quality Assurance Surveillance Plan (QASP)

1. PERFORMANCE REQUIREMENTS SUMMARY (PRS). The PRS charts at the end of this exhibit:

1.1. List the PWS requirements that the Government will survey. The absence of any contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract, including the clauses entitled "Inspection of Services" and "Default."

1.2. Define the standard of performance for each listed service.

1.3. Define the lot used as the basis for surveillance.

1.4. Set forth the surveillance methods the government will use to evaluate the contractor's performance for the listed tasks.

2. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). Contractor performance will be surveilled to determine if performance meets the contract standards. A variety of surveillance methods may be used:

2.1. One hundred percent inspection of the output.

2.2. Periodic inspection of the processes or output.

2.3. Customer complaints.

3. PERFORMANCE EVALUATION. Performance of a service will be evaluated to determine whether or not it meets the performance requirements of the contract. When the performance requirement is not met, a Contract Discrepancy Report (CDR) will be issued to the contractor by the KO. The contractor shall respond to the CDR by completing block 9 and 10 of the form and returning it to the KO within 15 calendar days of receipt. In the case of CDR's issued as the result of other methods of surveillance the KO shall take appropriate measures according to the clause entitled "Inspection Services."

PERFORMANCE REQUIREMENTS SUMMARY

PARAGRAPH NUMBER AND

SERVICE REQUIRED

STANDARD OF SERVICE

METHOD OF

SURVEILLANCE

C.5.2.2. LUBRICATION SERVICE The Contractor shall provide lubrication service to support vehicles/equipment under this PWS.

Periodic inspection.

C.5.2.3. LIFTING DEVICE,

PERIODIC INSPECTION AND

LOAD TESTING

The contractor shall perform periodic inspection as well as load/function tests of Mobile Lifting Devices including inspection of mobile cranes in accordance with TB-43-0142, OSHA 1926.550, 1910, 150, ANSI B, 30.5.

Periodic inspection.

C.5.2.4. ARMY OIL

ANALYSIS PROGRAM (AOAP)

The Contractor shall draw oil samples from all equipment listed in Technical Exhibit 7 with type service code O at the specified day, hour, or mileage frequency indicated.

Periodic inspection.

C.5.2.5. WRECKER AND TOWING

SERVICE

The contractor shall have 30 minutes to respond during normal duty hours and two hours during non-duty hours.

Periodic inspection.

Customer complaint.

C.5.2.6. VEHICLE/EQUIPMENT

PICKUP AND DELIVERY SERVICE

The Contractor shall be required to provide pickup and delivery service for scheduled or breakdown repair maintenance services, between TEAD and DCD equipment user’s and the contractor’s Government furnished, maintenance repair shop, for all Army owned equipment listed in Technical Exhibit 7.

Periodic inspection.

Customer complaint.

C.5.3.3. WORK ORDERS Services that are estimated to exceed $1000.00 including parts and labor will be approved by the COR prior to commencing the work.

Periodic inspection.

C.5.3.3.1. WORK ORDER

REGISTER

The Contractor shall keep a work order register/log for TEAD equipment.

Periodic inspection.

C.5.3.4. TROUBLE CALLS The contractor shall have 30 minutes to respond during normal duty hours from receipt of a request for breakdown trouble call (Field Service) for all equipment listed in Technical Exhibit 7.

Customer complaint.

C.5.3.5. TECHNICAL-

INSPECTION

The Contractor shall technically inspect all vehicles/equipment deemed excess/overage by the

EM.

Period Inspection Customer complaint

C.5.3.6. NEW EQUIPMENT The Contractor shall stencil all new equipment with the assigned U.S. Army registration number, bumper number, and inspect all new equipment upon receipt to insure it is full safe, serviceable, and ready to issue to the operator.

Periodic inspection.

C.5.3.7. INSTALLED AUXILIARY

STANDBY GENERATORS

The Contractor shall perform maintenance and repair service to this equipment at remote site building locations at TEAD.

Periodic inspection.

Customer complaint.

C.5.3.8. INDUSTRIAL PLANT

EQUIPMENT (IPE)

The Contractor shall perform maintenance services on this equipment on site at various building locations at TEAD.

Periodic inspection.

Customer complaint.

C.5.3.9. SPOT PAINTING The contractor shall provide spot painting service on vehicles and equipment.

Periodic inspection.

C.5.3.10. WINTERIZING The contractor shall winterize, mark, and tag as winterized for the current year, all vehicles and equipment in conjunction with annual service.

Periodic inspection.

Customer complaint.

C.5.3.11. QUICKFIX

MAINTENANCE SERVICE

The contractor shall furnish a quick fix/drive in maintenance service for repair of vehicles/equipment that requires maintenance service that can be performed in one hour or less.

Periodic inspection.

Customer complaint.

C.5.3.13. STRADDLE CARRIER

OVERHAUL SERVICE

The Contractor shall accomplish inspection and repair maintenance, to include washing/cleaning, painting and update/modifications to two Straddle Carrier Trailers per year.

Periodic inspection.

Customer complaint.

C.5.3.14. WELDING SERVICE The contractor shall perform all types of normal welding services in house on light metals up to ½ inch in thickness for all vehicles/equipment listed in Technical Exhibit 7.

Periodic inspection.

Customer complaint.

C.5.3.15. WARRANTY WORK Contractor shall coordinate required warranty work on new equipment during its warranty period, with the EM or COR.

Periodic inspection.

Customer complaint.

C.5.5. SHOP MAINTENANCE The Contractor shall maintain the Equipment Shop and other maintenance and repair facilities utilized in a clean, orderly, and hazard free manner, to include the upkeep of the Technical Library, supply, lunch and rest rooms and snow removal, etc.

Periodic inspection.

C.5.6. QUALITY CONTROL The Contractor shall inspect vehicles/equipment prior to scheduled and unscheduled maintenance to identify items requiring correction.

Periodic inspection.

Customer complaint.