EXHIBIT_A_--_60mm_Contract_Data_Requirements_Lists_Rev_2.pdf
PDF 610 KB Posted
- Attached to
- 60 & 81mm Full Range Practice Cartridges, Load Assemble & Pack Federal contract opportunity
- Solicitation number
- W52P1J16R0135
About this file
Exhibit A -- 60MM CONTRACT DATA REQUIREMENT LISTS_REV-B
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. DATA ITEM NO. 17. PRICE
GROUP
A001
18. ESTIMATED
TOTAL PRICE
XX
8. APP CODE
0 1 0
0 1 0
Page: 1 of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
Operations Security (OPSEC) Plan OPSEC Program
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80934C PADDS Clause HS7001 AMSJM-FP/G2
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS AMSJM-FP/G2
D
ONE/R ASREQ*
a. ADDRESSEE
A ASREQ Reg Repro
ASREQ**
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
DELETE REFERENCE 'APPLYING OPSEC TO U.S. GOVERNMENT CONTRACTS'. REPLACE WITH REFERENCE 'SAMPLE ACQUISITIONS OPSEC PLAN'. 10 CALENDAR DAYS REQUIRED FOR GOVERNMENT REVIEW AND APPROVAL. *30 CALENDAR DAYS AFTER THE CONTRACTING OFFICER PROVIDES THE LIST OF KNOWN
CRITICAL INFORMATION (CI)/THREAT INFORMATION. ** RESUBMIT 10 CALENDAR DAYS AFTER
GOVERNMENT REVIEW. SUBMIT ELECTRONICALLY TO usarmy.ria.jmc.mbx.OPSEC-FD@mail.mil.
CO**
Form Approved OMB No. 0704-0188
A002
18. ESTIMATED
TOTAL PRICE
LT
8. APP CODE
0 0 0
0 0 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
ENGINEERING CHANGE PROPOSAL (ECP)
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80639D SECTION C RDAR-EIS-PD
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS SEE ADDRESS CODE
ASREQ ASREQ
a. ADDRESSEE
N/A N/A Reg Repro
ASREQ
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY THE DOD CONFIGURATION CONTROL AUTHORITY. THE PREFERRED METHOD FOR SUBMITTAL IS DD FORM 1692 LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil; COPY FURNISH THIS
SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.
DISTRIBUTION
Form Approved
0 0 0
A003
18. ESTIMATED
TOTAL PRICE
LT
8. APP CODE
0 0 0
0 0 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
REQUEST FOR VARIANCE (RFV)
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80640D SECTION C RDAR-EIS-PD
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS SEE ADDRESS CODE
ASREQ ASREQ
a. ADDRESSEE
N/A N/A Reg Repro
ASREQ
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY THE DOD CONFIGURATION CONTROL AUTHORITY. THE PREFERRED METHOD FOR SUBMITTAL IS DD FORM 1694 LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil; COPY FURNISH THIS
SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.
DISTRIBUTION
Form Approved
A004
18. ESTIMATED
TOTAL PRICE
LT
8. APP CODE
0 0 0
0 0 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
NOTICE OF REVISION (NOR)
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80642D SECTION C RDAR-EIS-PD
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS SEE ADDRESS CODE
ASREQ ASREQ
a. ADDRESSEE
N/A N/A Reg Repro
ASREQ
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY THE DOD CONFIGURATION CONTROL AUTHORITY. THE PREFERRED METHOD FOR SUBMITTAL IS DD FORM 1695 LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil; COPY FURNISH THIS
SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.
DISTRIBUTION
Form Approved
A005
18. ESTIMATED
TOTAL PRICE
DD
8. APP CODE
0 1 0
0 1 0
0 1 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
Measurement System Evaluation (MSE) - Measurement and Inspection Equipment System Design Documentation for Acceptance of Product
Measurement System Evaluation (MSE)/AIE
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81960 Contract Section E MSE Clause AMSJM-QAP
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS AMSJM-QAP
N/A
ASREQ ASREQ
a. ADDRESSEE
A N/A Reg Repro
ASREQ
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
Submit electronically to .CIV@MAIL.MIL
AND FLBK_MCPDQA@NAVY.MIL.
*An MSE Review Guide is available to assist Contractors on the ARDEC Public Website in the application of the MSE Clause. The MSE Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the MSE Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the MSE clause itself nor into the terms and conditions of any underlying contract which contains the MSE clause.
PCO
RDAR-EIQ-
Form Approved OMB No. 0704-0188
0 0
A006
18. ESTIMATED
TOTAL PRICE
NO
8. APP CODE
0 1 0
0 1 0
0 1 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
QUALITY PROGRAM PLAN (QPP)
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81722 Section E AMSJM-QAP
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS AMSJM-QAP
N/A
ASREQ ASREQ
a. ADDRESSEE
A N/A Reg Repro
ASREQ
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
DISTRIBUTION STATEMENT SHALL BE ASSIGNED AND IMPLEMENTED BY DOD CONFIGURATION
MANAGER. PLAN SHALL BE SUBMITTED THROUGH QAR TO ALL ADDRESSES
UNLESS OTHERWISE SPECIFIED, THE
CONTRACTOR SHALL SUBMIT REVISIONS WITHIN 10 DAYS OF RECEIPT OF GOVERNMENT RESPONSE.
SUBMIT ELECTRONICALLY TO AND FLBK_MCPDQA@NAVY.MIL.
PCO
ESED
Form Approved OMB No. 0704-0188
QUALITY PLAN
A007
18. ESTIMATED
TOTAL PRICE
XX
8. APP CODE
0 1 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
AMMUNITION DATA CARD Data Input (ADC)
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80043B NOT 1 SECTION C, MIL-STD-1168C AMSJM-QAP
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS WARP
N/A
ASREQ ASREQ
a. ADDRESSEE
N/A N/A Reg Repro
ASREQ
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
Form Approved
A008
18. ESTIMATED
TOTAL PRICE
NO
8. APP CODE
0 1 0
0 1 0
0 1 0
0 1 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
CRITICAL SAFETY ITEM, CHARACTERISTIC AND CRITICAL DEFECT REPORT
CICL, NOTIFICATION, INVESTIGATION, SEGREGATED MATERIAL
USE AND RESTART REQUEST
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SAFT-80970A NOT 1 Contract Section E Clause AMSJM-QAP
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS QAR
N/A
ASREQ ASREQ
a. ADDRESSEE
A N/A Reg Repro
ASREQ
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
REQUEST TO RESTART OPERATIONS, CONTRACTOR SHALL SUBMIT TO GOVERNMENT,
SEE LIST, FOR APPROVAL. GOVERNMENT WILL RESPOND WITHIN 10 DAYS OF RECEIPT. SUBMIT
ELECTRONICALLY TO AND FLBK_MCPDQA@NAVY.MIL.
AMSJM-QAP
ESED
PCO
Form Approved
A009
18. ESTIMATED
TOTAL PRICE
XX
8. APP CODE
0 1 0
0 1 0
0 1 0
0 1 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
First Article Qualification Test Plan and Procedures
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-81307A Section E AMSJM-QAP
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS ESED
D
ASREQ ASREQ
a. ADDRESSEE
A N/A Reg Repro
ASREQ
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
FIRST ARTICLE TEST PLAN SHALL BE SUBMITTED WITHIN A MINIMUM OF SIXTY (60) DAYS PRIOR TO FIRST ARTICLE TESTING (FAT). DISPOSITION OF PLAN SHALL BE PROVIDED WITHIN THIRTY (30) DAYS OF RECEIPT BY THE PCO. RESUBMITTALS (IF REQUIRED) SHALL BE SENT WITHIN TEN (10) DAYS AFTER
GOVERNMENT DISPOSITION. PCO APPROVAL OF TEST PLAN SHALL BE OBTAINED
PRIOR TO . ELECTRONIC SUBMITTALS ARE ACCEPTABLE (MICROSOFT OFFICE FORMAT ONLY).
DISTRIBUTION STATEMENT D, DOD USE ONLY. PLAN SHALL INCLUDE ALL VERIFICATIONS BY
EXAMINATIONS, ANALYSES, DEMONSTRATIONS OR TESTS NEEDED TO MEET ALL REQUIREMENTS OF PRIME ITEM SPECIFICATION AND s. CONTRACTOR FORMAT ACCEPTABLE, SAMPLE AVAILABLE
UPON REQUEST. SUBMIT ELECTRONICALLY TO AND
FLBK_MCPDQA@NAVY.MIL.
AMSJM-QAP
QAR
PCO
Form Approved
A010
18. ESTIMATED
TOTAL PRICE
LT
8. APP CODE
0 1 0
0 1 0
0 1 0
0 1 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TEST/INSPECTION REPORT FIRST ARTICLE ACCEPTANCE TEST REPORT
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B SECTION E AMSJM-QAP
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS AMSJM-QAP
N/A
ASREQ
a. ADDRESSEE
A N/A Reg Repro N/A
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
ESED
QAR
PCO
Form Approved
A011
18. ESTIMATED
TOTAL PRICE
NO
8. APP CODE
0 1 0
0 1 0
0 1 0
0 1 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
Critical Safety Item, Characteristic and Critical Defect Report Process Maps
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SAFT-80970A NOT 1 N/A AMSJM-QAP
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS QAR
NO
ASREQ 30DAC
a. ADDRESSEE
A AWARD Reg Repro
60DAC
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
SUBMIT TO AND FLBK_MCPDQA@NAVY.MIL.
AMSJM-QAP
PCO
ESED
Form Approved
A012
18. ESTIMATED
TOTAL PRICE
XX
8. APP CODE
0 1 0
0 1 0
0 1 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
STATISTICAL PROCESS CONTROL (SPC) PLAN
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81987 Contract SECTION E AMSJM-QAP
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
Reg Repro
16. REMARKS AMSJM-QAP
N/A
ASREQ ASREQ
a. ADDRESSEE
A N/A
ASREQ
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
GENERAL/DETAIL SECTIONS SHALL BE SUBMITTED AT LEAST 60 DAYS PRIOR TO PRODUCTION OR FIRST
ARTICLE (IF FA REQUIRED). IF GENERAL SECTION WAS PREVIOUSLY ACCEPTED, SUBMIT
UPDATED/REVISED MILESTONES IN TIMEFRAMES STATED ABOVE. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW THE PLAN AFTER RECEIPT. DISPOSITION OF THE GENERAL SECTION , DETAILED SECTION, AND THE CONTRACTOR'S MILESTONES FOR IMPLEMENTATION SHALL BE PROVIDED BY AMSJM-
QAP THROUGH THE PCO. SUBMIT TO AND
FLBK_MCPDQA@NAVY.MIL. THE ACCEPTABLE SOFTWARE PACKAGES WILL BE MICROSOFT OFFICE. IF THESE ARE NOT AVAILABLE, A WORD PROCESSING KIND OF DOCUMENT SAVED IN TEXT FORMAT IS
ACCEPTABLE.
PCO
ESED
Form Approved OMB No. 0704-0188
A013
18. ESTIMATED
TOTAL PRICE
XX
8. APP CODE
0 1 0
0 1 0
0 1 0
0 1 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
CRITICAL CHARACTERISTICS CONTROL PLAN (CCCP)
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81986 Contract Section E Clause AMSJM-QAP
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
Reg Repro
16. REMARKS QAR
N/A
ASREQ ASREQ
a. ADDRESSEE
A N/A
ASREQ
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
CONTRACTOR'S ELECTRONIC FORMAT USING MICROSOFT WORD OR COMPARABLE SOFTWARE IS
ACCEPTABLE. ADDITIONAL GUIDANCE ON CONTENT OF THE CCC PLAN IS AVAILABLE AT
CONTRACTOR SHALL SUBMIT PLAN COVERING ALL CRITICAL
CHARACTERISTICS AS REQUIRED IN CONTRACT CLAUSE REFERENCE. CONTRACTOR SHALL SUBMIT 60
DAYS PRIOR TO FIRST ARTICLE OR PRODUCTION IF FA IS NOT APPLICABLE TO
AND FLBK_MCPDQA@NAVY.MIL. GOVERNMENT WILL RESPOND
WITHIN 45 DAYS OF RECEIPT OF ORIGINAL AND ANY REQUIRED REVISIONS. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL SUBMIT REVISIONS WITHIN 10 DAYS OF RECEIPT OF GOVERNMENT
RESPONSE.
AMSJM-QAP
PCO
ESED
Form Approved
A014
18. ESTIMATED
TOTAL PRICE
XX
8. APP CODE
0 1 0
0 1 0
0 1 0
0 1 0
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
CRITICAL PLAN OF ACTION (CPOA)
TDP____________ TM____________ OTHER____________
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81996 Contract Section E Clause AMSJM-QAP
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
Reg Repro
16. REMARKS QAR
N/A
ASREQ SEE RMKS
a. ADDRESSEE
A N/A
SEE RMKS
J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY
CONTRACTOR'S ELECTRONIC FORMAT USING MICROSOFT WORD OR COMPARABLE SOFTWARE IS
ACCEPTABLE. ADDITIONAL GUIDANCE ON CONTENT OF THE CPOA IS AVAILABLE AT
http://www.pica.army.mil/PicatinnyPublic/organizations/ardec/orgchart/quality.html. CONTRACTOR MAY VOLUNTARILY SUBMIT A CPOA FOR ALL CRITICAL CHARACTERISTICS AS SPECIFIED IN THE CONTRACT CLAUSE REFERENCE. CONTRACTOR SHALL SUBMIT THE CPOA FOR APPROVAL PRIOR TO USE. GOVERNMENT WILL RESPOND WITHIN 45 DAYS OR RECEIPT OF ORIGINAL AND ANY REQUIRED REVISIONS. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL SUBMIT REVISIONS WITHIN 10 DAYS OF RECEIPT OF GOVERNMENT RESPONSE. UNLESS OTHERWISE APPROVED BY THE PCO, THE CPOA IS
NOT AUTHORIZED FOR USE PRIOR TO GOVERNMENT APPROVAL. SUBMIT ELECTRONICALLY TO
AND FLBK_MCPDQA@NAVY.MIL.
AMSJM-QAP
PCO
ESED
Form Approved
18. ESTIMATED
TOTAL PRICE
8. APP CODE
Page: of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
F. CONTRACTORD. SYSTEM/ITEM E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
16. REMARKS
a. ADDRESSEE
Reg Repro
J. DATEG. PREPARED BY
DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
H. DATE I. APPROVED BY
Form Approved OMB No. 0704-0188
A01
18. ESTIMATED
TOTAL PRICE
XX
8. APP CODE
0 1 0
0 1 0
Page: of DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
K. Mosher for SDMO, RDAR-EIS-PD
SUBMIT PROCEDURE FOR APPROVAL THROUGH CONTRACTING OFFICER 60 DAYS PRIOR TO FIRST
ARTICLE TEST OR PRODUCTION IF FIRST ARTICLE IS NOT APPLICABLE. ALLOW 14 DAYS FOR
APPROVAL/DISAPPROVAL. CONTRACTOR TO RESUBMIT CONTRACTOR SHALL RESUBMIT WITH
GOVERNMENT REVISIONS WITHIN 10 DAYS. SUBMIT ELECTRONICALLY TO usarmy.ria.ardec.mbx.ri-corrosion-team@mail.mil. RDAR-MEE-W(R) SHALL PROVIDE PROCEDURE REVIEW RESPONSE BACK TO CONTRACTING OFFICER. A DD FORM 250 IS NOT REQUIRED FOR PHOSPHATE COATING PROCEDURE
APPROVAL. CONTRACTOR FORMAT ACCEPTABLE. SHALL BE SUBMITTED USING A PC COMPATIBLE
format (i.e., .PDF, RICH TEXT FORMAT (RTF) OR WORD).
RDAR-MEE-W
A N/A Reg Repro N/A
16. REMARKS CONTRACTING OFFICER
N/A
ONE/R ASREQ
a. ADDRESSEE
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80603A MIL-DTL-16232G, Para 3.1 RDAR-MEE-W
E. CONTRACT / PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
TEST PROCEDURE - PHOSPHATE COATING PRE-PRODUCTION PROCEDURE
TDP____________ TM____________ OTHER____________
D. SYSTEM/ITEM F. CONTRACTOR
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
Form Approved
FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of
CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.
The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423 (BACK)
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
REQUIRED
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
Reset Page of Pages
Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST Form Approved
(1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
COAI CRTG 60MM FULL RANGE, PR T16A06BQHH
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A017 PERFORMANCE ORIENTED PACKAGING TEST REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-PACK-81059A SECTION D RDAR-EIL-TP (RI)
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT A SREQ ASREQ* b. COPIES Final
8. APP CODE
N/A N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ**
a. ADDRESSEE Draft
Reg
Repro
16. REMARKS RDAR-EIL-P (D) 0 1 0
*30 DAYS PRIOR TO FIRST ARTICLE TES T. REPORT TITLE SHALL INCLUDE RDAR-EIL-TP (RI) 0 1 0
ITEM NAME A ND MODELNUMBER OF THE AMMUNITION THAT GOES I NTO
THE PACKAGE. IF ITEM IS A CO MPONENT OF AMMUNITION, THE
AMMUNITION SYSTEM THAT T HE ITEM IS USED ON S HALL ALSO BE
INCLUDED. REPORT SHALL BE SUBMITTED ELECTRO NICALLY VIA E-MAIL TO
YUEN.H.LAM.CIV@MAIL.MIL A ND AMA NDA.C.PENNOCK.CIV@MAIL.MIL
SAVED IN RICH TEXT FORMAT (RTF), ASCII OR PDF FORMAT. **SUBMI T
EVERY TWO (2) YEARS.
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
mailto:YUEN.H.LAM.CIV@MAIL.MIL mailto:NDA.C.PENNOCK.CIV@MAIL.MIL
Page of Pages
Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A018 GOVERNMENT FURNISHED MATERIEL (GFM) CONSUMPTION REPORT
CONSUMPTION REPORT
DI-MGMT-80438B SEC. C, SOW SFAE-AMO-CAS
NO MTHLY DFDEL* b. COPIES
N/A N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ**
16. REMARKS AMSJM-QAP 0 1 0
*30 DAYS AFT ER PRODUCTION COMME NCES. **3 WO RKING DAYS PCO 0 1 0
FOLLOWING REPORTING MONTH.***SA MPLE FORMAT TO BE PROVIDED BY SFAE-AMO-CAS*** 0 1 0
THE USG. SHALL BE SUBMITTED IN ELECTRONIC FORMAT AND INCLUDE
DESCRIPTION/NSN; TOTAL OF GFM ON CONTRACT VS. TOTAL DELIVE RED AS
OF THE CURRENT MONTH; RECEIPTS: C UMULATIVE VS. CURRENT MO NTH;
CONSUMED: CUMULATIVE VS. CURRENT MONTH: RE JECTED/DAMAGED
MATERIAL: LOT NUMBERS AND SERIAL NUMBERS OF GFM; AND LAP CLINS:
CONTRACT QUANTITY VS. DEL IVERED QUANTITY. THIS INFORMATIO N
SHOULD BE PROVIDED FOR EA CH DELIVERY ORDER. SUBMIT
ELECTRONICALLY TO THE GOVERNMENT CONTRACTING OFFICE,
MICHAEL.T.RI ZZO.CIV@MAIL.MIL AND THE PM-CAS PROJECT OFFICER.
15. TOTAL 0 3 0
mailto:ZZO.CIV@MAIL.MIL
Page of Pages
Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A019 TEST/INSPECTION REPORT SUPPLIER/VENDOR AUDIT SCHEDULE
DI-NDTI-80809B N/A AMSJM-QAP
NO A SREQ ASREQ b. COPIES
A N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
CONTRACTOR SHALL PROVIDE A SCHE DULE OF ALL SUPPLIER/VENDOR PCO 0 1 0
AUDITS WITHIN 30 DAYS AFTER CONTRACT AWARD. THE CONTRACTOR SFAE-AMO-CAS 0 1 0
SHALL NOTIFY THE USG 15 DAYS PRIOR TO A SCHED ULED AUDIT AND THE
USG WILL ADVISE WHETHER OR NOT IT PLANS TO W ITNESS THE AUD IT.
SUBMIT ELECTRONICALLY TO MICHAE L.T.RIZZO.CIV@MAIL.MIL, THE
CONTRACTING OFFICE AND PM-CAS PR OJECT OFFICER.
15. TOTAL 0 3 0
mailto:L.T.RIZZO.CIV@MAIL.MIL
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
COAI CRTG 60MM FULL RANGE, PR T16A06BQHH
A020 CONFERENCE AGENDA MEETING AGENDA
DI-ADMN-81249B N/A CCRC-AC
7. DD 250 REQ
NO
8. APP CODE
A
9. DIST STATEMENT
N/A
10. FREQUENCY
ASREQ
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
b. COPIES
Reg Repro
CONTRACTOR SHALL SUBMIT AN AGENDA AND POWERPOINT SLIDES FOR PCO 0 1 0
THE POST AWARD MEETING AND ALL PROGRAM MANAGEMENT REVIEWS, 30 SFAE-AMO-CAS 0 1 0
DAYS PRIOR TO MEETING, FOR GOVERNMENT REVIEW AND COMMENTS TO CCRC-AR 0 1 0
THE CONTRACTING OFFICE AND PM-CAS PROJECT OFFICER.
15. TOTAL 0 4 0
Page of Pages
Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
COAI CRTG 60MM FULL RANGE, PR T16A06BQHH
A021 CONFERENCE MINUTES MEETING MINUTES
DI-ADMN-81250B N/A CCRC-AC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
b. COPIES
Reg Repro
CONTRACTOR SHALL MINUTES FROM THE POST AWARD MEETING AND ALL PCO 0 1 0
PROGRAM MANAGEMENT REVIEWS NLT THAN 10 DAYS AFTER MEETING OR SFAE-AMO-CAS 0 1 0
REVIEWS TO THE CONTRACTING OFFICE AND PM-CAS PROJECT OFFICER. CCRC-AR 0 1 0
Page of Pages
Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
Page of Pages
Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A022 INTEGRATED PROGRAM MANAGEMENT REPORT INTEGRATED MASTER SCHEDULE (IMS)
(IPMR)
DI-MGMT-81861A N/A SFAE-AMO-CAS
NO A SREQ 30DAC b. COPIES
A N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
ALL OF THE REPORTING REQUIREMENTS FOR CRITICAL PATHS SHALL BE PCO 0 1 0
REPORTED WI THIN 30 DAYS AFTER CONTRACT AWARD. CONTRACTOR SFAE-AMO-CAS 0 1 0
FORMAT IS ACCEPTABLE,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .