Attch_0025_ACWS_Cost_and_SW_Data_Rptg_Plan_2016_04_04.xls

XLS spreadsheet 925 KB Posted

Attached to
ACWS
Solicitation number
W52P1J-16-R-0058
Issued by

About this file

Attachment 0025

View the file

Other files

File Type Posted
Attch_0022_ACWS_SEP_RR_Draft_2016_04_04.pdf PDF
Attch_0013_ACWS_DISA_SRF_Form_RiskReduction_2016_04_04.docx DOCX document
Attch_0023_ACWS_TEMP_Draft_2015_10_17.pdf PDF
Attch_0019_ACWS_CDRL_List_Delivery_Dates_2016_04_01.xlsx XLSX spreadsheet
Attch_0014_ACWS__DD254_2016_04_04.pdf PDF
Attch_0028_ACWS_Offeror_Software_Solution_2016_03_23.xlsx XLSX spreadsheet
Attch_0015_ACWS_Staff_Levels_Skill_Mix_Schedule_2016_04_04.xlsx XLSX spreadsheet
Attch_0011_ACWS_Contracting_Geo_Loc_Auth_Users_List_2015_12_17.xlsx XLSX spreadsheet
Attch_0024_ACWS_Software_License_Disclosure_2016_04_04.xlsx XLSX spreadsheet
Attch_0030_ACWS_RFP_Attachment_List_STATUS_2016_04_04v6.xlsx XLSX spreadsheet
Attch_0018_ACWS_Past_Performance_Questions_2016_04_04.docx DOCX document
Attch_0021_ACWS_Additional_Price__Matrix_2016_04_04v2.xlsx XLSX spreadsheet
Attch_0008_ACWS_OV-2_SV-1_2016_03_30.pdf PDF
Attch_0016_ACWS_Quality_Assurance_Surveillance_Plan_2016_01_15.pdf PDF
Attch_0010_ACWS_Interface_Development_Strategy_2015_12_17.pdf PDF
Attch_0017_Small_Business_Participation_2016_04_04.xlsx XLSX spreadsheet
Attch_0012_ACWS_GFI_GFP_List_2015_12_17.pdf PDF
Attch_0009_ACWS_Business_Process_Models_2015_12_17.pdf PDF
Attch_0020_ACWS_Price__Matrix_2016_04_04.xlsx XLSX spreadsheet
Attch_0029_ACWS_Section_LM_4_4_2016.pdf PDF
Attch_0007_ACWS_CONOPS-OMS-MP_Final_Sign_2015_10_26.docx DOCX document
Attch_0004_ACWS_Program_Schedules_CLINs_2016_03_25.pdf PDF
Attch_0002_ACWS_Task_Order_0001_Statement_Of_Objs_2016_04_04.pdf PDF
Attch_0005_Requirements_Traceability_Matrix(RTM)_2015_11_04.xlsx XLSX spreadsheet
Attch_0001_ACWS_Statement_Of_Objectives_2016_04_04.pdf PDF
Exhibit_C_CDRLS_Test_Evaluation_Data_2016_03_30.pdf PDF
Attch_0006_DASD_SE_Pgm_Protect_Pln_Outline_DBS_Systems_2013_06_13.pdf PDF
Attch_0003_ACWS_Builds_IOC_FD_Definitions_2015_12_17.pdf PDF
Exhibit_B_CDRLS_Systems_Engineering_Data_2016_03_21.pdf PDF
Exhibit_A_CDRLS_Acq_Program_Management_2015_12_17.pdf PDF
Exhibit_D_CDRLS_Operations_Support_2016_03_31.pdf PDF
ACWS_Information_Update_2016_03_22.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

ACWS Investment Pg 1(CSDR Plan)

COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR PROGRAMa. NAME:Army Contract Writing System
b. PHASE/MILESTONEc. PRIME MISSION PRODUCT2. WBS SYSTEM TYPE3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
XPre-ABC-FRPArmy Contract Writing System Increment 1 InvestmentAutomated Information SystemXINITIAL
AC-LRIPO&SCHANGE20151028
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
Kim Reid(703) 545-9061kim.g.reid.civ@mail.mil
7. PLAN TYPE8. PREPARING ORGANIZATION9a. CONTRACTOR NAME/ADDRESS9b. CONTRACT NUMBER9c. APPROPRIATION10. APPROVED PLAN NUMBER
PROGRAMXCONTRACT (PRIME)i. PERFORMING ORGANIZATIONii. DIVISIONTBDXRDT&EA-15-L-C1
CONTRACT (SUB)PEO EISTBDXPROCUREMENT
O&M
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. SRDR

FORMATS

1.01.0Army Contract Writing System (ACWS) InvestmentXXXX
1.11.1Prime Mission ProductXXXX
1.1.11.1.1Custom Application SoftwareXXXX
1.1.11.1.1.xBuild 1..NXXXX
1.1.21.1.2Enterprise Service ElementXXXX
1.1.21.1.2.1Enterprise Service Element HardwareXXXX
1.1.21.1.2.1.xBuild 1..NXXXX
1.1.21.1.2.2Enterprise Service Element SoftwareXXXX
1.1.21.1.2.2.xBuild 1..NXXXX
1.1.21.1.2.3Enterprise Service Element Integration, Assembly, Test and CheckoutXXXX
1.1.21.1.2.3.xBuild 1..NXXXX
1.1.31.1.3Enterprise Information SystemXX
1.1.31.1.3.1.xBuild 1..NXX
1.1.41.1.4External System Interface DevelopmentXXX
1.1.41.1.4..xBuild 1..NXXXX
1.1.51.1.5AIS Platform HardwareXXX
1.1.51.1.5.xBuild 1..NXXXX
1.1.61.1.6System Level IntegrationXXXX
1.1.61.1.6.xBuild 1..NXXXX
1.2.11.2System EngineeringXXXX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. SRDR

FORMATS

1.2.11.2.1Management & PlanningXX
1.2.11.2.2Solution Development & DesignXX
1.3.11.3Program ManagementXXXX
1.41.4Change ManagementXXX
1.4.11.4.1Change Management PlanningXXX
1.4.21.4.2Change Management ToolsXXX
1.51.5System Test and EvaluationXXX
1.5.11.5.1Development Test and EvaluationXXX
1.5.21.5.2Operational Test and Evaluation SupportXXX
1.5.31.5.3Human System Integration SupportXXX
1.5.41.5.4Test and Evaluation SupportXXX
1.5.51.5.5Test FacilitiesXXX
1.5.61.5.6Test ToolsXXX
1.61.6Training (Services)XXX
1.71.7DataXXX
1.7.11.7.1Technical PublicationsXX
1.7.21.7.2Engineering DataXX
1.7.31.7.3Management DataXX
1.7.41.7.4Support DataXX
1.7.51.7.5Data DepositoryXX
1.81.8Peculiar Support EquipmentXN/A
1.91.9Common Support EquipmentXN/A
1.101.10Operational/Site ActivationXXX
1.10.11.10.1Deployment Hardware and SoftwareXXX
1.10.21.10.2User DocumentationXXX
1.10.31.10.3Site ActivationXXX
1.10.41.10.4User TrainingXXX
1.10.51.10.5Data MigrationXXX
1.10.61.10.6Management/Engineering SupportXXX
1.10.71.10.7Interim Logistics SupportXXX
1.111.11Industrial FacilitiesXXX
1.121.12Initial Spares and Repair PartsXN/A
Subtotal CostX
Reporting Contractor G&AX
Reporting Contractor Undistributed BudgetX
Reporting Contractor Management ReserveX
Reporting Contractor FCCMX
Total CostX
Reporting Contractor Profit/Loss or FeeX
Total PriceX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE

ACWS Investment Pg 2(CSDR Plan)

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd. AS OF DATEe. DUE DATE
(YYYYMMDD)(YYYYMMDD)
CWBS DictionaryCWBS Dictionary - 60 days after Contract AwardTBDTBD
1921, 1921-1Initial Report - 60 days after Contract AwardTBDTBD
SRDR InitialRisk Reduction Dev SRDR - Due 60 days after TO 001 AwardTBDTBD
1921, 1921-1Interim Cost Report - Due 90 before MS BTBDTBD
SRDR FinalRisk Reduction Dev SRDR - Due 60 days after TO 001 CompletionTBDTBD
SRDR InitialBuild X Dev SRDR - Due 60 days after TO XX AwardTBDTBD
SRDR FinalBuild X Dev SRDR - Due 60 days after Software DeliveryTBDTBD
SRDR InitialBuild X Dev SRDR - Due 60 days after TO XX AwardTBDTBD
SRDR FinalBuild X Dev SRDR - Due 60 days after Software DeliveryTBDTBD
SRDR InitialBuild X Dev SRDR - Due 60 days after TO XX AwardTBDTBD
SRDR FinalBuild X Dev SRDR - Due 60 days after Software DeliveryTBDTBD
1921, 1921-1Annual Cost ReportTBDTBD
1921, 1921-1Annual Cost ReportTBDTBD
1921, 1921-1Annual Cost ReportTBDTBD
1921, 1921-1Annual Cost ReportTBDTBD
1921, 1921-1Annual Cost ReportTBDTBD
1921, 1921-1Final Cost ReportTBDTBD
DD FORM 2794 (PAGE 2), MAY 2011PREVIOUS EDITION IS OBSOLETE
15. REMARKS
Special Instructions
1.NON-RECURRING/RECURRING DEFINITIONS:
The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the forms 1921, 1921-1, and 1921-2 to segregate Recurring and Nonrecurring costs discretely and not as an aggregate. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference.
2.COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT:
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
3.DD Form 1921-3 Contractor Business Data Report:
a.The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.
b.Reports are submitted annually at the end of the contractor's fiscal year.
c.Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
Software Special Instructions
Software Reporting and Dates
The Software Resource Data Reports (SRDRs) identified in section in Section 14b and 14c will be subject to change pending the proposed development strategy by the contractor. The contractor will be required to provide an SRDR submission for each individual build, increment, release, etc. that is identified in the approved development strategy. Upon contract award the CSDR plan will be revised to ensure the submission events reflect development strategy.
DD FORM 2794 (PAGE 2), MAY 2011PREVIOUS EDITION IS OBSOLETE

ACWS Sustainment Pg1(CSDR Plan)

COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR PROGRAMa. NAME:Army Contract Writing System
b. PHASE/MILESTONEc. PRIME MISSION PRODUCT2. WBS SYSTEM TYPE3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
XPre-ABC-FRPArmy Contract Writing System Increment 1 SustainmentAutomated Information SystemXINITIAL
AC-LRIPO&SCHANGE20151028
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
Kim Reid(703) 545-9061kim.g.reid.civ@mail.mil
7. PLAN TYPE8. PREPARING ORGANIZATION9a. CONTRACTOR NAME/ADDRESS9b. CONTRACT NUMBER9c. APPROPRIATION10. APPROVED PLAN NUMBER
PROGRAMXCONTRACT (PRIME)i. PERFORMING ORGANIZATIONii. DIVISIONTBDRDT&EA-15-L-C2
CONTRACT (SUB)PEO EISTBDPROCUREMENT
XO&M
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. SRDR

FORMATS

1.131.0AIS Sustainment EffortXXX
1.13.11.1Unit Level ManpowerXXX
1.13.21.2Unit Level OperationsXXX
1.13.31.3MaintenanceXXX
1.13.41.4Sustaining SupportXXX
1.13.41.4.1System -Specific TrainingXXX
1.13.41.4.2Support Equipment Replacement and RepairXXX
1.13.41.4.3Sustaining/Systems EngineeringXXX
1.13.41.4.3.1Systems EngineeringXX
1.13.41.4.3.2Sustaining EngineeringXX
1.13.41.4.4Program ManagementXXX
1.13.41.4.4.1Program ManagementXX
1.13.41.4.4.2Change ManagementXX
1.13.41.4.5Information SystemsXXX
1.13.41.4.5.1Tech RefreshXXX
1.13.41.4.5.2License Fees (Software)XXX
1.13.41.4.5.3System SupportXXX
1.13.41.4.5.3.1Help DeskXXXX
1.13.41.4.5.3.1.1Tier 1XXXX
1.13.41.4.5.3.1.2Tier 2XXXX
1.13.41.4.5.3.1.3Tier 3XXXX
1.13.41.4.5.3.2System Database/Administration (DISA, Commercial Hosting) 1...nXXX
1.13.41.4.5.3.3Follow-on User TrainingXXX
1.13.41.4.5.3.4Accreditation (Recurring)XXX
1.13.41.4.5.3.5Independent Verification and Validation (IV&V)XXX
1.13.41.4.6Data and Technical PublicationsXXX
1.13.41.4.7Simulator OperationsXXX
1.13.41.4.8Data Maintenance (Management)XX
1.13.41.4.9Other Sustaining SupportXXXX
1.13.51.5Continuing System ImprovementsXXX
1.13.51.5.1Hardware ModificationsXXX
1.13.51.5.2Software Modification/MaintenanceXXX
1.13.51.5.2.1Software ModificationXXXX
1.13.51.5.2.2Software MaintenanceXXXX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. SRDR

FORMATS

Subtotal CostX
Reporting Contractor G&AX
Reporting Contractor Undistributed BudgetX
Reporting Contractor Management ReserveX
Reporting Contractor FCCMX
Total CostX
Reporting Contractor Profit/Loss or FeeX
Total PriceX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE

ACWS Sustainment Pg2(CSDR Plan)

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd. AS OF DATEe. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1CWBS DictionaryCWBS Dictionary - Contract AwardTBDTBD
21921, 1921-5Annual CCDRTBDTBD
3SRDR FinalAnnual Maintenance SRDRTBDTBD
41921, 1921-5Annual CCDRTBDTBD
5SRDR FinalAnnual Maintenance SRDRTBDTBD
61921, 1921-5Annual CCDRTBDTBD
7SRDR FinalAnnual Maintenance SRDRTBDTBD
81921, 1921-5Annual CCDRTBDTBD
9SRDR FinalAnnual Maintenance SRDRTBDTBD
101921, 1921-5Final Maintenance CCDRTBDTBD
11SRDR FinalFinal Maintenance SRDRTBDTBD
15. REMARKS
Special Instructions
1.NON-RECURRING/RECURRING DEFINITIONS:
The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the forms 1921, 1921-1, and 1921-2 to segregate Recurring and Nonrecurring costs discretely and not as an aggregate. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference.
2.COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT:
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
3.DD Form 1921-3 Contractor Business Data Report:
a.The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.
b.Reports are submitted annually at the end of the contractor's fiscal year.
c.Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
Software Maintenance Special Instructions
CR/DR
The contractor will report the number and age of change requests and discrepancy reports by the level of complexity as identified by the contractor. Also, the contractor must define each level of complexity in the data dictionary.
DD FORM 2794 (PAGE 2), MAY 2011PREVIOUS EDITION IS OBSOLETE

Unclassified

ARMY CONTRACT WRITING SYSTEM

(ACWS)

Attachment 0025

ACWS_Cost_and_Data_Reporting_Plan

Version 1.0

04 April 2016

Solicitation Number: W52P1J-16-R-0058

Per Section L.3.1, Submit with Volume V

Prepared By:

Product Manager

Army Contract Writing System (ACWS)

ACWS Attch 0028 SW Solution

DISTRIBUTION A: Approved for public release; distribution unlimited

Version 1.0 17 Dec 2015 image1.png image2.png

File details come from the government source that posted it. Updated .