W52P1J-15-R-3053_released.pdf

PDF 276 KB Posted

Attached to
Expelling Charge Bags
Solicitation number
W52P1J-15-R-3053
Issued by

About this file

Expelling Charge Bag solicitation was released on 23 Dec 2015 with an anticipated closing date of 19 Jan 2016.

View the file

Other files

File Type Posted
W52P1J-15-R-3053-0005.pdf PDF
W52P1J-15-R-3053-0004.pdf PDF
W52P1J-15-R-3053-0003.pdf PDF
W52P1J-15-R-3053-0002.pdf PDF
W52P1J-15-R-3053-0001.pdf PDF
9213757revJ.pdf PDF
PRICE_MATRIX_15R3053_revised.xlsx XLSX spreadsheet
12997548revB.pdf PDF
ACC-RI_Contracting_POC.pdf PDF
CDRL-A002.pdf PDF
CDRL-A001.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local time 19 Jan 2016

X

A X B X C X D

EX

X

G F 29 - 32

33 - 36 H 37 ashanti.d.brown@us.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-A6 1 37

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W52P1J 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See Clause 52.0000-4004 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ASHANTI D. BROWN 309-782-5501

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 3 4 - 7

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

8 - 10

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

12 - 14 15 - 16

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 17 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

18 - 27

PART II - CONTRACT CLAUSES

ARMY CONTRACTING COMMAND ROCK ISLAND

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

W41G265153025I

5. DATE ISSUED

23 Dec 2015

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W52P1J-15-R-3053

Section A - Solicitation/Contract Form

EXECUTIVE SUMMARY

1. The Army Contracting Command ‐ Rock Island (ACC‐RI) hereby issues the Request for Proposal, W52P1J‐15‐R‐3053, for the procurement of Expelling Charge Bags. The solicitation is issued in accordance with FAR 16.504. The result of this solicitation will be a 5 year firm‐fixed price, Indefinite‐Delivery Indefinite‐Quantity (IDIQ) contract.

2. An indefinite‐quantity contract provides for an indefinite quantity, within stated limits, of supplies during a fixed period. The Government places orders for individual requirements on delivery orders. The contract requires the Government to order and the contractor to furnish at least the stated minimum quantity of supplies. In addition, if ordered, the contractor must furnish any additional quantities, not to exceed the stated maximum.

3. Following are the dates of the five ordering periods covered by the solicitation:

Ordering Period 1: Date of award through 30 September 2016 Ordering Period 2: 1 October 2016 through 30 September 2017 Ordering Period 3: 1 October 2017 through 30 September 2018 Ordering Period 4: 1 October 2018 through 30 September 2019 Ordering Period 5: 1 October 2019 through 30 September 2020

4. The minimum guaranteed value of this procurement is a quantity of 11,000 each expelling change bags, which will be awarded under Delivery Order 0001 after the contract has been awarded. The estimated maximum quantity for the procurement is 200,000 each. There is no guarantee the Government will order the maximum quantity under this procurement. This does not obligate the Government to place additional orders beyond the guaranteed minimum quantity.

5. Delivery Orders issued against a contract awarded from this solicitation, shall be utilizing unit prices contained in the Pricing Matrix incorporated into this solicitation as Attachment 4. All Delivery Orders are issued unilaterally by the Army Contracting Command ‐ Rock Island with firm delivery dates.

6. First Article Test (FAT) is required, unless waived per clause 52.209‐3(h). FAT terms shall be

Inspect at Destination; Acceptance at Destination.

7. Delivery Production Rates are as follows:

FAT due 45 days after date of contract award 11,000 each due 30 days after FAT approval

Note: Certificate of Analysis and Material Certification are required with each shipment.

8. All shipment will be FOB Destination to the following:

W41G26 Pine Bluff Arsenal

504th St, Bldg 53‐990 Central Receiving Pt.

Pine Bluff, AR 71602

9. This Executive Summary is provided for administrative assistance only and is not intended to alter the terms and conditions of the contract in any manner. Provisions of this solicitation and technical data shall prevail over this executive summary.

10. The point of contact is Ashanti Brown at ashanti.d.brown.civ@mail.mil or 309‐782‐5501.

CLAUSES INCORPORATED BY FULL TEXT

52.0000-4000 02 NON-RELEASE OF CONTRACT INFORMATION (MAR 2000)

1. Any proprietary, confidential commercial, trade secret or similar type of information in the contract resulting from this solicitation may not be released to anyone outside the Government.

2. Do not release proprietary, confidential commercial, trade secret or similar type of information from this contract to anyone inside the Government that does not have a legitimate need to know the information.

3. If in doubt about what information in the contract may be released, contact the Contracting Officer.

4. Criminal penalties are provided by 18 U.S.C. for the improper release of proprietary and/or confidential commercial information. (End of notice)

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 200,000 Each

EXPELLING CHARGE BAG

FFP

Expelling Charge Bags in accordance with drawing 9213757 Rev J dated 3 May 2013 and specification 12997548 Rev B dated 27 Feb 2012. A 10% Variation in quantity has been included in this requirement.

Pricing shall be submitted on the separately attached Price Matrix. See clause 252.216-7006 in Section I for additional ordering information. Unit prices shall be submitted with no more than two numbers after the decimal point.

Ordering Period 1: Date of award through 30 September 2016 Ordering Period 2: 1 October 2016 through 30 September 2017 Ordering Period 3: 1 October 2017 through 30 September 2018 Ordering Period 4: 1 October 2018 through 30 September 2019 Ordering Period 5: 1 October 2019 through 30 September 2020

Packaging requirements: Pallet not taller than five (5) feet.

Material Certification, Certificate of Compliance (CoC), and Certificate of Analysis (CoA) is required with each shipment.

FOB: Destination

PURCHASE REQUEST NUMBER: W41G265153025I

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 UNDEFINED

First Article Test - Base Year

FFP

First Article Test (FAT), in accordance with FAR 52.209-3 Alt I, First Article Approval - Contractor Testing in Section I. Provide ten (10) FAT samples required with Material Certification, Certificate of Certificate of Compliance (CoC), and Certificate of Analysis (CoA). The ten samples will be measured in accordance with all applicable drawings and specifications, and all requirements will be documented in preparation of the FAT report. The report will be generated at the Contractor's facility. The samples are to be delivered to the Pine Bluff Arsenal for verification of the FAT data. Final FAT approval will come from the Procuring Contracting Officer.

UNIT UNIT PRICE MAX AMOUNT

0003 UNDEFINED

Contract Data Requirements List

FFP

CDRLs. Provide required documents in accordance with DD Form 1423-1 dated 8 June 2015. CDRLs are listed in Section J, List of Documents, Exhibits and Other Attachments.

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

11,000.00 200,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

1,000.00 40,000.00

CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE

The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

0001 11,000.00 200,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

0001 1000.00

40,000.00

Section C - Descriptions and Specifications

CLAUSES INCORPORATED BY REFERENCE

52.211-5 Material Requirements AUG 2000 52.223-11 Ozone-Depleting Substances MAY 2001

252.223-7002 SAFETY PRECAUTIONS FOR AMMUNITION AND EXPLOSIVES (MAY 1994)

(a) Definition. “Ammunition and explosives," as used in this clause --

(1) Means liquid and solid propellants and explosives, pyrotechnics, incendiaries and smokes in the following forms:

(i) Bulk,

(ii) Ammunition;

(iii) Rockets;

(iv) Missiles;

(v) Warheads;

(vi) Devices; and

(vii) Components of (i) through (vi), except for wholly inert items.

(2) This definition does not include the following, unless the Contractor is using or incorporating these materials for initiation, propulsion, or detonation as an integral or component part of an explosive, an ammunition or explosive end item, or of a weapon system --

(i) Inert components containing no explosives, propellants, or pyrotechnics;

(ii) Flammable liquids;

(iii) Acids;

(iv) Powdered metals; or

(v) Oxidizers;

(vi) Other materials having fire or explosive characteristics.

(b) Safety requirements.

(1) The Contractor shall comply with the requirements of the DoD Contractors' Safety Manual for Ammunition and Explosives, DoD 4145.26-M hereafter referred to as "the manual", in effect on the date of the solicitation for this contract. The Contractor shall also comply with any other additional requirements included in the schedule of this contract.

(2) The Contractor shall allow the Government access to the Contractor's facilities, personnel, and safety program documentation. The Contractor shall allow authorized Government representatives to evaluate safety programs, implementation, and facilities.

(c) Noncompliance with the manual.

(1) If the Contracting Officer notifies the Contractor of any noncompliance with the manual or schedule provisions, the Contractor shall take immediate steps to correct the noncompliance. The Contractor is not entitled to reimbursement of costs incurred to correct noncompliances unless such reimbursement is specified elsewhere in the contract.

(2) The Contractor has 30 days from the date of notification by the Contracting Officer to correct the noncompliance and inform the Contracting Officer of the actions taken. The Contracting Officer may direct a different time period for the correction of noncompliances.

(3) If the Contractor refuses or fails to correct noncompliances within the time period specified by the Contracting Officer, the Government has the right to direct the Contractor to cease performance on all or part of this contract.

The Contractor shall not resume performance until the Contracting Officer is satisfied that the corrective action was effective and the Contracting Officer so informs the Contractor.

(4) The Contracting Officer may remove Government personnel at any time the Contractor is in noncompliance with any safety requirement of this clause.

(5) If the direction to cease work or the removal of Government personnel results in increased costs to the Contractor, the Contractor shall not be entitled to an adjustment in the contract price or a change in the delivery or performance schedule unless the Contracting Officer later determines that the Contractor had in fact complied with the manual or schedule provisions. If the Contractor is entitled to an equitable adjustment, it shall be made in accordance with the Changes clause of this contract.

(d) Mishaps. If a mishap involving ammunition or explosives occurs, the Contractor shall --

(1) Notify the Contracting Officer immediately;

(2) Conduct an investigation in accordance with other provisions of this contract or as required by the Contracting Officer; and

(3) Submit a written report to the Contracting Officer.

(e) Contractor responsibility for safety. (1) Nothing in this clause, nor any Government action or failure to act in surveillance of this contract, shall relieve the Contractor of its responsibility for the safety of --

(i) The Contractor's personnel and property;

(ii) The Government's personnel and property; or

(iii) The general public.

(2) Nothing in this clause shall relieve the Contractor of its responsibility for complying with applicable Federal, State, and local laws, ordinances, codes, and regulations (including those requiring the obtaining of licenses and permits) in connection with the performance of this contract.

(f) Contractor responsibility for contract performance. (1) Neither the number or frequency of inspections performed by the Government, nor the degree of surveillance exercised by the Government, relieve the Contractor of its responsibility for contract performance.

(2) If the Government acts or fails to act in surveillance or enforcement of the safety requirements of this contract, this does not impose or add to any liability of the Government.

(g) Subcontractors. (1) The Contractor shall insert this clause, including this paragraph (g), in every subcontract that involves ammunition or explosives.

(i) The clause shall include a provision allowing authorized Government safety representatives to evaluate subcontractor safety programs, implementation, and facilities as the Government determines necessary.

(ii) Note: The Government Contracting Officer or authorized representative shall notify the prime Contractor of all findings concerning subcontractor safety and compliance with the manual. The Contracting Officer or authorized representative may furnish copies to the subcontractor. The Contractor in turn shall communicate directly with the subcontractor, substituting its name for references to "the Government". The Contractor and higher tier subcontractors shall also include provisions to allow direction to cease performance of the subcontract if a serious uncorrected or recurring safety deficiency potentially causes an imminent hazard to DoD personnel, property, or contract performance.

(2) The Contractor agrees to ensure that the subcontractor complies with all contract safety requirements. The Contractor will determine the best method for verifying the adequacy of the subcontractor's compliance.

(3) The Contractor shall ensure that the subcontractor understands and agrees to the Government's right to access to the subcontractor's facilities, personnel, and safety program documentation to perform safety surveys. The Government performs these safety surveys of subcontractor facilities solely to prevent the occurrence of any mishap which would endanger the safety of DoD personnel or otherwise adversely impact upon the Government's contractual interests.

(4) The Contractor shall notify the Contracting Officer or authorized representative before issuing any subcontract when it involves ammunition or explosives. If the proposed subcontract represents a change in the place of performance, the Contractor shall request approval for such change in accordance with the clause of this contract entitled "Change in Place of Performance - Ammunition and Explosives".

(End of clause)

Section D - Packaging and Marking

52.0000-4026 STANDARD PRACTICE FOR COMMERCIAL PACKAGING (JUN 2005)

Preservation/Packaging/Packing shall conform to commercial level in accordance with the requirements of American Society for Testing and Materials, ASTM D 3951 (DEC 21 1990). The contractor shall mark all shipments in accordance with the requirements of ASTM D 3951 (DEC 21 1990).

D1. MARKING OF SUPPLIES

TRANS OFC M F PROPERTY

RECEIVING SECTION RSI BRCH

BLDG. 23-330

PINE BLUFF, AR 71602-9500

CONTRACT NO. W52P1J-16-D-****

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 252.246-7000 Material Inspection And Receiving Report MAR 2008

52.0000-4042 INSPECTION AND ACCEPTANCE SITES (JUN 1997)

1. CLIN(S):

0001, 0002, 0003.

2. Government Procurement Quality Assurance Actions And/Or Inspection Will Be Performed At:

Government Facility Pine Bluff Arsenal, Pine Bluff, AR.

3. Government Acceptance Will Be Performed At:

Government Facility Pine Bluff Arsenal, Pine Bluff, AR.

CERTIFIED MATERIAL TEST REPORTS

52.0000-4402 PB

For those material(s) identified below, a certified test report shall be made available to the Government/DCAS Quality Assurance Representative (QAR). The test results contained on the certified test reports(s) shall be adequate to determine compliance with all applicable requirements of the material specifications(s) listed below. Availability of the certified test reports are in addition to other contract requirements and does not reduce or prejudice the

Government’s right to inspect supplies under other provisions of this contract. The test report(s) shall contain the following:

(a) Name and Address of Supplier.

(b) Purchase Order Number.

(c) Identification of material by specification, revision, amendment and dates, together with type, grade, size, etc.

(d) Quantity of material.

(e) Test results identified by reference to the applicable requirements.

(f) Quantity tested, sample size, and specimen type as applicable.

(g) Date, signature, and title of the authorized representative of the Contractor that is attesting to the accuracy of test report content.

PART NO. MATERIAL SPECIFICATION REQUIREMENTS FOR

WHICH RESULTS ARE

REQUIRED ALL

SPECIFIED CRITERIA

Expelling Charge Bag Material Certification, Certificate of

Analysis, Certificate of Compliance

52.0000-4528 REWORK AND REPAIR OF NONCONFORMING MATERIAL (MAY 1994)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

MIL-STD-1916 (OCT 2000)

52.0000-4545

The Department of Defense (DoD) Preferred Methods for this Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC

0001 60 dys. AFATA 11,000 PINE BLUFF ARSENAL

CENTRAL SHIPPING AND RECEIVING

POINT

(CSRP)

BLDG 53-990, 506TH STREET

PINE BLUFF AR 71602-9500

870-540-3610

W41G26

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

52.211-16 Variation In Quantity APR 1984 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991 252.223-7003 Changes In Place Of Performance--Ammunition And

Explosives

DEC 1991

52.0000-4002 SHIPPING/DELIVERY INSTRUCTIONS AND INFORMATION (FEB 2004)

1. THE COMPLETE 13-DIGIT PURCHASE ORDER, DELIVERY ORDER, OR CONTRACT NUMBER (The Number that starts with W52P1J----) MUST BE ON THE OUTSIDE OF THE SHIPPING CONTAINER. This number must also appear on all packing slips, invoices, bills, or any communications regarding this order.

2. A Packing List must be included with each shipment.

3. Any excess quantity delivered, that is not covered by a Variation in Quantity clause, is subject to rejection.

4. SHIPMENT OR DELIVERY TO ANY ADDRESS OTHER THAN THE ₃ SHIP TO₄ ADDRESS

DESIGNATED IN THE PURCHASE ORDER/DELIVERY ORDER/CONTRACT (Block 14 of the DD1155, Block 15 of the SF1449, or Block 11 of the SF 26) MAY RESULT IN A DELAY IN PAYMENT.

5. ANY CHANGE IN THE ₃ SHIP TO₄ ADDRESS MUST BE APPROVED BY A WRITTEN CONTRACT

MODIFICATION FROM THE CONTRACTING OFFICER.

6. Information from FAR clause 52.232-25, Prompt Payment (FEB 2002), Paragraph (a)(5)(i): For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.

(End of Provision)

PINE BLUFF ARSENAL WORKING HOURS

52.0000-4400 PB

Receiving hours at Bldg 23-330 are from 6:30 a.m. until 2:30 p.m. Monday through Thursday.

All shipments must be at Dexter Gate (truck gate) on or before 2:30 p.m. unless prior arrangements have been made.

No shipments will be accepted on Friday.

No shipments will be accepted on Government holidays. Government holidays are as follows:

New Years Day, Martin Luther King Day, President’s Day, Memorial Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day. If the holiday falls on a Sunday, the holiday will be observed on the following Monday.

Section G - Contract Administration Data

52.0000-4834 AMC-LEVEL PROTEST PROGRAM

(LS7000) May 2014

If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting Officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the Contracting Officer) to:

Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Fax: (256) 450-8840 e-mail: usarmy.redstone.usamc.mbx.protests@mail.mil

The AMC-level protest procedures are found at:

http://www.amc.army.mil/amc/commandcounsel.html

If Internet access is not available, contact the Contracting Officer or HQ, AMC Office of Command Counsel to obtain the AMC-Level Protest Procedures.

(End of provision)

Section I - Contract Clauses

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-6 Data Universal Numbering System Number JUL 2013 52.204-13 System for Award Management Maintenance JUL 2013 52.204-16 Commercial and Government Entity Code Reporting JUL 2015 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.211-5 Material Requirements AUG 2000 52.211-15 Defense Priority And Allocation Requirements APR 2008 52.211-17 Delivery of Excess Quantities SEP 1989 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--

Modifications

AUG 2011

52.215-14 Integrity of Unit Prices OCT 2010 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns OCT 2014 52.219-14 Limitations On Subcontracting NOV 2011 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2014 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment

Exceeding $15,000

MAY 2014

52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity APR 2015 52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans OCT 2015 52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.229-3 Federal, State And Local Taxes FEB 2013

52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-9 Limitation On Withholding Of Payments APR 1984 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984 52.232-25 Prompt Payment JUL 2013 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes MAY 2014 52.233-2 Service Of Protest SEP 2006 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.242-13 Bankruptcy JUL 1995 52.243-1 Changes--Fixed Price AUG 1987 52.244-6 Subcontracts for Commercial Items OCT 2015 52.246-23 Limitation Of Liability FEB 1997 52.248-1 Value Engineering OCT 2010 52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-8 Default (Fixed-Price Supply & Service) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7000 Disclosure Of Information AUG 2013 252.204-7002 Payment For Subline Items Not Separately Priced DEC 1991 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting.

SEP 2015

252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.213-7000 Notice to Prospective Suppliers on Use of Past Performance Information Retrieval System--Statistical Reporting in Past Performance Evaluations

MAY 2015

252.215-7000 Pricing Adjustments DEC 2012 252.223-7004 Drug Free Work Force SEP 1988 252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Nov 2014)

NOV 2014

252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.225-7013 Duty-Free Entry--Basic (Nov 2014) NOV 2014 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.225-7041 Correspondence in English JUN 1997 252.225-7048 Export-Controlled Items JUN 2013 252.227-7013 Rights in Technical Data--Noncommercial Items FEB 2014 252.227-7016 Rights in Bid or Proposal Information JAN 2011 252.227-7030 Technical Data--Withholding Of Payment MAR 2000 252.227-7037 Validation of Restrictive Markings on Technical Data JUN 2013 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7010 Levies on Contract Payments DEC 2006

252.237-7007 Termination for Default DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.246-7000 Material Inspection And Receiving Report MAR 2008 252.246-7001 Alt I Warranty Of Data (Mar 2014) - Alternate I MAR 2014 252.247-7023 Transportation of Supplies by Sea APR 2014 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

52.204-7 SYSTEM FOR AWARD MANAGEMENT (JULY 2013)

(a) Definitions. As used in this provision--

Data Universal Numbering System (DUNS) number means the 9-digit number assigned by Dun and Bradstreet, Inc.

(D&B) to identify unique business entities.

Data Universal Numbering System +4 (DUNS+4) number means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.)

This 4-character suffix may be assigned at the discretion of the business concern to establish additional System for Award Management records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same parent concern.

Registered in the System for Award Management SAM database means that--

(1) The offeror has entered all mandatory information, including the DUNS number or the DUNS+4 number, the Contractor and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see Subpart 4.14) into the SAM database;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS +4” followed by the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number--

(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and Zip Code.

(iv) Company Mailing Address, City, State and Zip Code (if separate from physical).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) Offerors may obtain information on registration at https://www.acquisition.gov.

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989) - ALTERNATE I (JAN 1997).

[Contracting Officer shall insert details]

(a) The Contractor shall test ten (10) unit(s) of Lot/Item 0001 as specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within 45 calendar days from the date of this contract to Marianne Whitmer at marianne.whitmer.civ@mail.mil and Kenneth Daniel at kenneth.g.daniel2.civ@mail.mil marked "FIRST ARTICLE TEST REPORT: Contract No. W52P1J-16-D-****, Lot/Item No. 0001" Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph

(b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Indefinite Delivery, Indefinite Quantity contract resulting from this solicitation.

52.216-19 ORDER LIMITATIONS. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 11,000 ea, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of 40,000 ea;

(2) Any order for a combination of items in excess of 40,000 ea; or

(3) A series of orders from the same ordering office within 60 calendar days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.

Upon receiving this notice, the Government may acquire the supplies or services from another source.

52.216-22 INDEFINITE QUANTITY. (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after the final delivery date of the final delivery order issued against the contract or when the maximum quantity is reached, which ever is sooner.

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JULY 2013)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 313210- assigned to contract number W52P1J-16-D-****.

(Contractor to sign and date and insert authorized signer's name and title).

52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)

(a) Definitions. As used in this clause --

Acceptance means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing supplies, or approves specific services as partial or complete performance of the contract.

Supplies means the end items furnished by the Contractor and related services required under this contract. The word does not include ``data.''

(b) Contractor's obligations.

(1) Notwithstanding inspection and acceptance by the Government of supplies furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the Contractor warrants that for 2 years after acceptance.

(i) All supplies furnished under this contract will be free from defects in material or workmanship and will conform with all requirements of this contract; and

(ii) The preservation, packaging, packing, and marking, and the preparation for, and method of, shipment of such supplies will conform with the requirements of this contract.

(2) When return, correction, or replacement is required, transportation charges and responsibility for the supplies while in transit shall be borne by the Contractor.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .