W52P1J13R0156-0002.pdf
PDF 18 KB Posted
- Attached to
- Pyrotechnics Federal contract opportunity
- Solicitation number
- W52P1J13R0156
About this file
AMENDMENT 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATT_0009-Solicitation_W52P1J-13-R-0156_Q A.pdf | ||
| W52P1J13R0156-0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0002 2015SEP29
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
AARON S. LAYNE
EMAIL: AARON.S.LAYNE.CIV@MAIL.MIL
W52P1J-13-R-0156
2015AUG25
X
X 2015OCT07 04:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 6
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: AARON S. LAYNE
Buyer Office Symbol/Telephone Number: CCRC-AR/(309)782-7833
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of this amendment 0002 to solicitation W52P1J-13-R-0156 is the following;
1. Extend the solicitation closing date from 1 October 2015 to 7 October 2015 at 1600 hours Central time.
2. To add to Solicitation W52P1J-13-R-0156, ATT 0009-Solicitation W52P1J-13-R-0156 Q&A.
3. Clause 52.246-4520 (ACC-RI) Ammunition Data Card Sept 2014 is hereby updated to change the drawing number for the M115A2 Flash
Composition from 12972321 to 12972326.
4. DFAR Clause 252.204-7012 Safeguarding of Unclassified Controlled Technical Information Nov 2013 is hereby updated.
All other terms and conditions of Solicitation W52P1J-13-R-0156 remain unchanged and applicable.
*** END OF NARRATIVE A0003 ***
2 6
W52P1J-13-R-0156 0002
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
E-1 CHANGED 52.246-4520 AMMUNITION DATA CARDS SEP/2014
(ACC-RI)
Detailed requirements and guidance for the preparation of Ammunition Data Cards (ADCs) and Ammunition Lot Numbers are contained in MIL-
STD-1168, DI-MISC-80043 and the Worldwide Ammunition-data Repository Program (WARP) online user's manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in
MIL-STD-1168 and the WARP users manual. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term "should" are considered to be replaced with the word "shall."
(a) The contractor shall develop and submit ADCs in accordance with the requirements of this clause, MIL-STD-1168, and the user's manual located on the WARP database. The WARP application is accessed through the Munitions History Program (MHP) website. (Refer to the clause in Section C of this contract entitled "Statement of Work - Ammunition Data Cards, Report of Contractor Ballistic/Function
Testing" for more information.) The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(b) The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.
(c) Unless otherwise authorized by the Procuring Contracting Officer, the contractor shall include, in the components sections on the
ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.
End Item Component Listing:
The following is for the M115A2:
Nomenclature: Simulator, Projectile, Ground Burst, M115A2
PN:13019987 NSN:1370-01-557-8527 DODIC:L594
Drawing Number Nomenclature
12972326 Flash Composition
12972564 Binder, cellulose Nitrate-Camphor
7549218 Sleeve
7549227 Whistle Loading Assembly
7549228 Disc
7549229 Tube, Outer
7549233 Tube, Spacer
7549234 Cover Assembly
7549245 Tube, Inner
8833714 Ferrule
8833721 Igniter, Blasting Fuse, Friction Type
8865589 Disc & Washer Assembly
9212301 Adhesive
9256477 Priming Paste
9345134 Fuse Cord, Safety
9345144 Glue, Hot Melt
The following is for the M116A1:
Nomenclature: Simulator Hand Grenade Assembly, M116A1
PN:9256467-1 NSN:1370-01-614-5083 DODIC:L601
Drawing Number Nomenclature
12912921 Support, Priming Paste
12972327 Aluminum Powder, Flaked
12972564 Binder, Cellulose Nitrate-Camphor
13013011 Tube, Spacer
8833714 Ferrule
8833721 Igniter, Blasting Fuse, Friction Type
8835120 Label
9212301 Adhesive
9256461 Disc
9256462 Disc, Upper
9256464 Tube, Inner
9256465 Tube, Outer
3 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
9256477 Priming Paste
9345134 Fuse Cord, Safety
9345144 Glue, Hot Melt
MIL-P-00223 Powder, Black
(d) The component items identified below are from paragraph (c) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168 and WARP requirements.
The following is for the M115A2:
Nomenclature: Simulator, Projectile, Ground Burst, M115A2
PN:13019987 NSN:1370-01-557-8527 DODIC:L594
Drawing Number from paragraph (c) above 8833721, components as follows:
Component Drawing Number Nomenclature
8833712 Tube
8833717 Sleeve
9212301 Adhesive
8833713 Clip,Safety
The following is for the M115A2:
Nomenclature: Simulator, Projectile, Ground Burst, M115A2
PN:13019987 NSN:1370-01-557-8527 DODIC:L594
Drawing Number from paragraph (c) above 12972326, components as follows:
Component Drawing Number Nomenclature
12972327 Aluminum Powder
MIL-P-223 Black Powder
(e) Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements. Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components. When not required by technical data package and not an end item or major component, the component lot number may be constructed through contractor lot number convention.
(f) The flowdown of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.
(g) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user's manual provides information on the level of detail required.
(h) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.
(ES6200) (End of clause)
4 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 CHANGED 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING AUG/2015
5 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0009 ATT 0009-SOLICITATION W52P1J-13-R-0156 Q&A 004
6 6
| SECTION A |
| SECTION E |
| SECTION I |
| SECTION J |
File details come from the government source that posted it. Updated .