Questions and Answers 2.docx

DOCX document 16 KB Posted

Attached to
BRAND NAME ONLY: S&C ELECTRIC COMPANY, PAD-MOUNTED SWITCH GEAR REPLACEMENT
Solicitation number
W51AA125R0004
Issued by

About this file

This document is a set of Questions and Answers related to a federal contract opportunity for the removal and replacement of three (3) brand name S&C Electric Company Vista Medium Voltage Pad-Mounted Switchgear.

The key details are:

  • Sean Tufano will be the Contracting Officer Representative and Subject Matter Expert.
  • No ground penetrating radar (GPR) or Dig Safe is required as there should be no need to disturb the earth adjacent to the existing vault.
  • The grounding configuration will be specified to the manufacturer's recommendation, not anticipated to vary much from the existing configuration.
  • There are no lightning protection requirements.
  • The contractor will provide onsite backup generator as needed during the phased switchgear replacement.
  • There are no new wiring or conduit requirements, only transferring secondary terminations and supporting/installing new primary conductor terminations.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers 2 Question 1. Who is being considered PE of record?

Answer 1. Sean Tufano will be the Contracting Officer Representative and Subject Matter Expert.

Question 2. Will GPR or Dig Safe be required for this project?

Answer 2. I do not believe so as we should not need to disturb the earth adjacent to existing vault.

Question 3. Is there a new grounding configuration for the new switchgear upgrade?

Answer 3. Grounding configuration spec’d to manufacturer’s recommendation, I do not anticipate this to vary much from what is existing.

Question 4. Are there lightning protection requirements for this scope?

Answer 4. No Lightning protection involved.

Question 5. Does the SOW call for onsite backup generator for phasing of each MV switchgear?

Answer 5. As needed by contractor as phasing is required.

Question 6. Are there any new wiring/conduit requirements for this project?

Answer 6. No conduit requirements, wiring includes transferring all secondary terminations, supporting and installing new terminations on primary conductors, tending both primary and secondary conductors as needed.

File details come from the government source that posted it. Updated .