Attachment 3 Proposed Price Schedule.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
BRAND NAME ONLY: S&C ELECTRIC COMPANY, PAD-MOUNTED SWITCH GEAR REPLACEMENT
Solicitation number
W51AA125R0004
Issued by

About this file

This document is a Proposed Price Schedule for a federal contract opportunity to remove and replace three (3) S&C Electric Company Vista Medium Voltage Pad-Mounted Switchgear. The contract is a brand name requirement for S&C Electric Company equipment due to deterioration and age of the existing equipment. The work is described in the accompanying Statement of Work. The price schedule breakdown lists various construction divisions and associated labor, material, and subcontractor costs. It also includes line items for insurance, bonds, taxes, manuals, overhead, and profit. The total contract amount should be calculated based on the subtotals provided. The related federal contract opportunity has a solicitation number of W51AA125R0004 and is being issued by the Department of the Army.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposed Price Schedule

PRICE SCHEDULE BREAKDOWN
Title: W51AA1-25-R-0004 Pad-Mounted Switchgear Replacement
Total LaborTotal MaterialTotal SubcontractorTotal Base Item
General Requirements & Facility ConstructionPrice
Division 01 General Requirements (furnish and install)$0.00
01A - Project Manager
01B - Superintendent
01C - Quality Control Manager
01D - Site Safety Officer
01E - Scheduler
01F - DESIGN
Division Existing Conditions (furnish and install)$0.00
Division 3 Concrete (furnish and install)$0.00
Division 4 Masonry (furnish and install)$0.00
Division 5 Metals (furnish and install)$0.00
Division 6 Woods, Plastic and Composites (furnish and install)$0.00
Division 7 Thermal and Moisture Protection (furnish and install)$0.00
Division 8 Openings (furnish and install)$0.00
Division 9 Finishes (furnish and install)$0.00
Division 10 Specialties (furnish and install)$0.00
Division 11 Equipment (furnish and install)$0.00
Division 12 Furnishings (furnish and install)$0.00
Division 13 Special Construction (furnish and install)$0.00
Division 14 Conveying Equipment (furnish and install)$0.00
Facility Services Subgroup
Division 21 Fire Suppression (furnish and install)$0.00
Division 22 Plumbing (furnish and install)$0.00
Division 23 Heating, Ventilating and A/C (furnish and install)$0.00
Division 25 Integrated Automation$0.00
Division 26 Electric$0.00
Division 27 Communications$0.00
Division 28 Electronic Safety & Security$0.00
Site & Infrastructure Subgroup
Division 31 Earthwork$0.00
Division 32 Exterior Improvements$0.00
Division 33 Utilities$0.00
Division 34 Transportation$0.00
Division 35 Waterway & Marine Construction$0.00
Process Equipment Subgroup$0.00
Division 40 Process Interconnections$0.00
Division 41 Material Processing & Handling Equipment$0.00
Division 42 Process Heating, Cooling, & Drying Equipment$0.00
Division 43 Process Gas & Liquid Handling$0.00
Division 44 Pollution & Waste Control Equipment$0.00
Division 45 Industry Specific Mfg. Equipment$0.00
Division 46 Water & Wastewater Equipment$0.00
Division 48 Electrical Power Generation$0.00

TOTAL DIVISIONS $0.00

Insurance / Bonds$0.00
Taxes / Other Fees (provide itemized list)$0.00
O&M Manuals and Red Line Drawings$0.00
OverheadRate _______%N/A
Overhead (daily rate)Per Day $0.00N/A
SubContract Mark-UpRate _______%N/A
ProfitRate _______%N/A
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00
TOTAL$0.00

File details come from the government source that posted it. Updated .