B08 Att 0026 PWS Annex C - Transportation PRS.pdf
PDF 259 KB Posted
- Attached to
- EAGLE Ft. Carson CO W519TC-27-R-A014
- Solicitation number
- W519TC-27-R-A014
About this file
This is a Performance Work Statement (PWS) Annex detailing Transportation Performance Requirement Summary (PRS) standards for a federal transportation contract. The document establishes performance metrics across six operational categories: Transportation-General, Fleet Management Operations, Unit Movements, Cargo Movements, Container Yard Operations, and Rail Operations.
The contract requires the contractor to meet specific timeliness and quality standards for each task, with performance measured through random sampling, surveillance activity checklists, or defined lot inspections. Key requirements include: reporting statistical data with 95% AQL (Acceptable Quality Level), controlling and accounting for GSA vehicles with 99% AQL, picking up vehicles within five business days at 98% AQL, scheduling vehicle maintenance with 95% AQL, assisting Unit Movement Coordinators with 97% AQL, properly documenting loaded equipment with 99% AQL, routing military cargo with 100% AQL, managing hazardous materials with 100% AQL, downloading and uploading containers with 99% AQL, issuing ISO container control documents with 100% AQL, performing locomotive maintenance with 100% AQL, ordering petroleum products with 97% AQL, coordinating track repairs with 95% AQL, controlling security seals with 99% AQL, and processing inbound freight documentation with 95% AQL. The AQLs range from 90% to 100%, with most requirements emphasizing complete and accurate work delivered by specified deadlines.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS Annex C - Transportation Performance Requirement Summary (PRS)
Task/Requirement Standard Sampling Method, Lot & Acceptable
Quality Level (AQL)
TRANSPORTATION - GENERAL
5.26.3 Provide reports and statistical data
Timeliness: Reports and statistical data delivered by the due date.
Quality: IAW DLRS ITD-01 Accurate and complete
Surveillance activity report
Lot: Inspect reports submitted per quarter.
AQL: 95%
FLEET MANAGEMENT OPERATIONS
5.29.1 Control & Account for GSA vehicles, keys, and credit cards report loss/abuse
Timeliness: By COB daily notify COR upon discovery.
Quality: Complete & accurate
Random sampling
Lot: Each GSA vehicle hand receipt completed at time of surveillance.
AQL: 99%
5.29.1 Maintain hand receipts on GSA
vehicles
Timeliness: Hand receipts updated annually, as a minimum.
Quality: Complete & accurate
Random sampling
Lot: Each GSA vehicle hand receipt
AQL: 98%
Pick up and deliver vehicles
Timeliness: Vehicles pickup within (5) business days when notified.
Quality: Pick up & delivery to designated area.
Random sampling
Lot: Each vehicle requiring pickup and delivery completed at time of surveillance.
Maintain a copy of justification on each motor vehicle utilized for official use and notify users when it is due to expire excluding LSEV.
Timeliness: Annually
Quality: Justification must meet the requirements of AR 58-1.
Random sampling
Lot: GSA vehicle justifications prepared each year.
AQL: 100%
5.29.11 Schedule for Maintenance of
GSA vehicles.
Timeliness: Users notified 5 business days prior to scheduled maintenance date
Quality: Scheduled maintenance performed.
Surveillance activity checklist
Lot: Each GSA vehicle requiring maintenance completed at time of surveillance.
AQL: 95%
UNIT MOVEMENTS
5.30.1 Provide necessary assistance to
the Unit Movement Coordinator
(UMC) with unit movement data maintenance and movement planning.
Timeliness: Meet UMC’s processing times.
Quality: All unit moves completed as required.
Surveillance activity checklist
Lot: Each unit move
AQL: 97%
5.30.1 Document loaded equipment
Properly
Timeliness: Upon completion of loading.
Quality: Load data will be obtained complete and accurate.
Random sampling
Lot: Each piece of equipment loaded in process or completed at time of surveillance
AQL: 99%
5.30.1 Utilize Radio Communications
Timeliness: At all times during unit movement.
Quality: Radios are operational during unit movements.
Random sampling
Lot: Inspect transportation operation in process or completed at time of
AQL: 95%
5.30.2 Assist and advise unit
movement planning and coordination
Timeliness: Meet UMC’s processing times.
Quality: Assist and advise UMO training 100 percent of the time
Random sampling
Lot: Each unit move
CARGO MOVEMENTS
5.31.1 Route military cargo and
equipment.
Timeliness: To meet mission requirements
Quality: Shipment will be routed IAW
DTR PART II. Data entry into
ETA/FAST/GFM CMOS will be accurate and complete.
Random sampling
Lot: Each shipment competed at time of surveillance.
AQL: 100%
5.31.2 Hazardous materials, oversized, sensitive items properly identified, documented, marked, labeled, and/or placarded
Timeliness: Prior to preparation of
GBL/CBL.
Quality: Certified HazMat preparers are verified; documents are complete and accurate.
Random sampling
Lot: Each hazardous materials, oversized, sensitive shipments in process or
CONTAINER YARD OPERATIONS
5.33.1 Download, upload, reposition, retrieve, and transport
containers
Timeliness: To meet training exercise/deployment requirements with no additional commercial charges being incurred.
For non-deployment movement, when current scheduled workload permits support.
Quality: Containers placed safely and correctly at designated location.
Random sampling
Lot: Each container transported in process or completed at time of surveillance.
AQL: 99%
5.33.1 Issue & Receive ISO containers
& MILVANS
Timeliness: Control document prepared for each asset at the time of transfer.
Quality: Completely & accurately.
Random sampling
Lot: Each control document in process or completed at time of surveillance.
AQL: 100%
5.33.1 Inspect & certify ISO containers.
Timeliness: NLT 2 1/2 years from date of last certification.
Quality: To meet international CSC standards.
Random sampling
Lot: Each ISO container in process or
Arrange for scheduled and/or emergency maintenance of light sets.
Timeliness: Scheduled: IAW manufacturer’s recommendation Emergency: Same day
Quality: Required maintenance scheduled.
Random sampling
Lot: Each light set scheduled for maintenance at time of surveillance.
Reposition or retrieve light sets
Timeliness: Within 48 hours of directive.
Quality: Lights sets relocated safely to designated location.
Random sampling
Lot: Number of light sets repositioned/retrieved or completed at time of surveillance.
5.33.2 Conduct inventory of ISO
containers and light sets
Timeliness: Containers: Inventoried & reported quarterly.
Light sets: Reported NLT 5th business day of each month.
Quality: Completely & accurately
Random sampling
Lot: Each inventory completed at time of surveillance.
AQL: 99%
5.33.2 Manage containers
Timeliness: 100 percent of containers used for movement are ISO compliant prior to use
Random sampling
AQL: 90%
RAIL OPERATIONS
5.34.1 Perform operator level
maintenance on on-hand government owned locomotives
Timeliness: IAW applicable maintenance manuals and to meet mission requirements.
Quality: Complete & accurate
Random sampling
Lot: Each maintenance inspection completed at time of surveillance.
AQL: 100%
5.34.1 Order all required petroleum
liquids and lubricants for locomotives.
Timeliness:
Fuel: Ordered when on hand fuel reaches 1000 gallons minimum.
Oil: Ordered when on hand oil reaches
Surveillance Activity Checklist
Lot: Inspect fuel order request per quarter.
110 gallons minimum.
Oil sample: submitted every 25 hours of operation or 90 days, whichever occurs first.
Quality: fuel & petroleum levels maintained at or above level of ordering.
AQL: 97%
Take oil samples for oil test
Timeliness: oil sample: submitted every 25 hours of operation or 90 calendar days, whichever occurs first.
Quality: Completely, efficiently, and effectively.
Random sampling
Lot: Inspection completed at time of
Coordinate for track repairs & foliage/debris removal.
Timeliness: Second and fourth week of each month.
Quality: Completely, efficiently, and effectively.
Random sampling
Lot: Track coordination performed and complete at time of surveillance.
AQL: 95%
5.34.1 Control Government and/or
Commercial Security Seals
Timeliness: To meet mission requirements.
Quality: Security seals will be properly requisitioned, received, controlled, and utilized.
Surveillance Activity Checklist
Lot: Inspect security seals inventory
AQL: 99%
5.34.1 Process inbound freight
documentation
Timeliness: SF 361, Discrepancy report, and necessary reshipment will be completed within 30 calendar days of receipt of shipment.
Quality: Misconsigned and/or mismarked shipments will be correctly re-consigned inbound shipment documentation processed, recorded, and reviewed promptly and accurately.
Random sampling
Lot: Each inbound shipment received, or
AQL 95%
Movement of DODX Railcars
Timeliness: Disposition instructions from SDDC will be requested within 2 business days of notification of completion of mission. Coordinate with TSP to meet SDDC timelines. CBL will be provided to TSP at the time of pick up.
Quality: DODX cars will be completely and safely moved. Random sampling
Random sampling
Lot: Each request for DODX railcar movement completed at time of surveillance.
AQL: 99%
5.34.2 Provide loaded/empty rail car
numbers to TSP, UMC, & SDDC;
release rail cars to TSP.
Timeliness: Within 4 hours of interchange.
Quality: Information & release order is complete and accurate.
Surveillance activity checklist
Lot: Inspect rail car load plan completed at time of surveillance.
AQL: 99%
5.34.3 Coordinate interchange with
TSP
Timeliness: Coordination completed not less than 24 hours prior to arrival/departure of railcars.
Quality: To meet mission requirements.
Surveillance activity checklist
Lot: Inspect interchange completed at time of surveillance.
AQL: 97%
5.34.3 Protect Rail Crossings
Timeliness: Prior to Locomotive approach at pedestrian/vehicle crossing.
Quality: Completely and safely.
Flagmen will possess PPE which is visible in day and night.
Surveillance activity checklist
Lot: Each track crossing protected at time of surveillance.
5.34.3 Perform Interchange with rail
carrier. Clear obstructions on track.
Timeliness: Arrive 30 minutes prior to scheduled interchange. Obstructions cleared to allow timely arrival at interchange.
Quality: Safely and efficiently.
Surveillance activity checklist
Lot: Inspect interchange with Carrier.
File details come from the government source that posted it. Updated .