B08 Att 0026 PWS Annex C - Transportation PRS.pdf

PDF 259 KB Posted

Attached to
EAGLE Ft. Carson CO W519TC-27-R-A014
Solicitation number
W519TC-27-R-A014
Issued by

About this file

This is a Performance Work Statement (PWS) Annex detailing Transportation Performance Requirement Summary (PRS) standards for a federal transportation contract. The document establishes performance metrics across six operational categories: Transportation-General, Fleet Management Operations, Unit Movements, Cargo Movements, Container Yard Operations, and Rail Operations.

The contract requires the contractor to meet specific timeliness and quality standards for each task, with performance measured through random sampling, surveillance activity checklists, or defined lot inspections. Key requirements include: reporting statistical data with 95% AQL (Acceptable Quality Level), controlling and accounting for GSA vehicles with 99% AQL, picking up vehicles within five business days at 98% AQL, scheduling vehicle maintenance with 95% AQL, assisting Unit Movement Coordinators with 97% AQL, properly documenting loaded equipment with 99% AQL, routing military cargo with 100% AQL, managing hazardous materials with 100% AQL, downloading and uploading containers with 99% AQL, issuing ISO container control documents with 100% AQL, performing locomotive maintenance with 100% AQL, ordering petroleum products with 97% AQL, coordinating track repairs with 95% AQL, controlling security seals with 99% AQL, and processing inbound freight documentation with 95% AQL. The AQLs range from 90% to 100%, with most requirements emphasizing complete and accurate work delivered by specified deadlines.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Annex C - Transportation Performance Requirement Summary (PRS)

Task/Requirement Standard Sampling Method, Lot & Acceptable

Quality Level (AQL)

TRANSPORTATION - GENERAL

5.26.3 Provide reports and statistical data

Timeliness: Reports and statistical data delivered by the due date.

Quality: IAW DLRS ITD-01 Accurate and complete

Surveillance activity report

Lot: Inspect reports submitted per quarter.

AQL: 95%

FLEET MANAGEMENT OPERATIONS

5.29.1 Control & Account for GSA vehicles, keys, and credit cards report loss/abuse

Timeliness: By COB daily notify COR upon discovery.

Quality: Complete & accurate

Random sampling

Lot: Each GSA vehicle hand receipt completed at time of surveillance.

AQL: 99%

5.29.1 Maintain hand receipts on GSA

vehicles

Timeliness: Hand receipts updated annually, as a minimum.

Quality: Complete & accurate

Random sampling

Lot: Each GSA vehicle hand receipt

AQL: 98%

Pick up and deliver vehicles

Timeliness: Vehicles pickup within (5) business days when notified.

Quality: Pick up & delivery to designated area.

Random sampling

Lot: Each vehicle requiring pickup and delivery completed at time of surveillance.

Maintain a copy of justification on each motor vehicle utilized for official use and notify users when it is due to expire excluding LSEV.

Timeliness: Annually

Quality: Justification must meet the requirements of AR 58-1.

Random sampling

Lot: GSA vehicle justifications prepared each year.

AQL: 100%

5.29.11 Schedule for Maintenance of

GSA vehicles.

Timeliness: Users notified 5 business days prior to scheduled maintenance date

Quality: Scheduled maintenance performed.

Surveillance activity checklist

Lot: Each GSA vehicle requiring maintenance completed at time of surveillance.

AQL: 95%

UNIT MOVEMENTS

5.30.1 Provide necessary assistance to

the Unit Movement Coordinator

(UMC) with unit movement data maintenance and movement planning.

Timeliness: Meet UMC’s processing times.

Quality: All unit moves completed as required.

Surveillance activity checklist

Lot: Each unit move

AQL: 97%

5.30.1 Document loaded equipment

Properly

Timeliness: Upon completion of loading.

Quality: Load data will be obtained complete and accurate.

Random sampling

Lot: Each piece of equipment loaded in process or completed at time of surveillance

AQL: 99%

5.30.1 Utilize Radio Communications

Timeliness: At all times during unit movement.

Quality: Radios are operational during unit movements.

Random sampling

Lot: Inspect transportation operation in process or completed at time of

AQL: 95%

5.30.2 Assist and advise unit

movement planning and coordination

Timeliness: Meet UMC’s processing times.

Quality: Assist and advise UMO training 100 percent of the time

Random sampling

Lot: Each unit move

CARGO MOVEMENTS

5.31.1 Route military cargo and

equipment.

Timeliness: To meet mission requirements

Quality: Shipment will be routed IAW

DTR PART II. Data entry into

ETA/FAST/GFM CMOS will be accurate and complete.

Random sampling

Lot: Each shipment competed at time of surveillance.

AQL: 100%

5.31.2 Hazardous materials, oversized, sensitive items properly identified, documented, marked, labeled, and/or placarded

Timeliness: Prior to preparation of

GBL/CBL.

Quality: Certified HazMat preparers are verified; documents are complete and accurate.

Random sampling

Lot: Each hazardous materials, oversized, sensitive shipments in process or

CONTAINER YARD OPERATIONS

5.33.1 Download, upload, reposition, retrieve, and transport

containers

Timeliness: To meet training exercise/deployment requirements with no additional commercial charges being incurred.

For non-deployment movement, when current scheduled workload permits support.

Quality: Containers placed safely and correctly at designated location.

Random sampling

Lot: Each container transported in process or completed at time of surveillance.

AQL: 99%

5.33.1 Issue & Receive ISO containers

& MILVANS

Timeliness: Control document prepared for each asset at the time of transfer.

Quality: Completely & accurately.

Random sampling

Lot: Each control document in process or completed at time of surveillance.

AQL: 100%

5.33.1 Inspect & certify ISO containers.

Timeliness: NLT 2 1/2 years from date of last certification.

Quality: To meet international CSC standards.

Random sampling

Lot: Each ISO container in process or

Arrange for scheduled and/or emergency maintenance of light sets.

Timeliness: Scheduled: IAW manufacturer’s recommendation Emergency: Same day

Quality: Required maintenance scheduled.

Random sampling

Lot: Each light set scheduled for maintenance at time of surveillance.

Reposition or retrieve light sets

Timeliness: Within 48 hours of directive.

Quality: Lights sets relocated safely to designated location.

Random sampling

Lot: Number of light sets repositioned/retrieved or completed at time of surveillance.

5.33.2 Conduct inventory of ISO

containers and light sets

Timeliness: Containers: Inventoried & reported quarterly.

Light sets: Reported NLT 5th business day of each month.

Quality: Completely & accurately

Random sampling

Lot: Each inventory completed at time of surveillance.

AQL: 99%

5.33.2 Manage containers

Timeliness: 100 percent of containers used for movement are ISO compliant prior to use

Random sampling

AQL: 90%

RAIL OPERATIONS

5.34.1 Perform operator level

maintenance on on-hand government owned locomotives

Timeliness: IAW applicable maintenance manuals and to meet mission requirements.

Quality: Complete & accurate

Random sampling

Lot: Each maintenance inspection completed at time of surveillance.

AQL: 100%

5.34.1 Order all required petroleum

liquids and lubricants for locomotives.

Timeliness:

Fuel: Ordered when on hand fuel reaches 1000 gallons minimum.

Oil: Ordered when on hand oil reaches

Surveillance Activity Checklist

Lot: Inspect fuel order request per quarter.

110 gallons minimum.

Oil sample: submitted every 25 hours of operation or 90 days, whichever occurs first.

Quality: fuel & petroleum levels maintained at or above level of ordering.

AQL: 97%

Take oil samples for oil test

Timeliness: oil sample: submitted every 25 hours of operation or 90 calendar days, whichever occurs first.

Quality: Completely, efficiently, and effectively.

Random sampling

Lot: Inspection completed at time of

Coordinate for track repairs & foliage/debris removal.

Timeliness: Second and fourth week of each month.

Quality: Completely, efficiently, and effectively.

Random sampling

Lot: Track coordination performed and complete at time of surveillance.

AQL: 95%

5.34.1 Control Government and/or

Commercial Security Seals

Timeliness: To meet mission requirements.

Quality: Security seals will be properly requisitioned, received, controlled, and utilized.

Surveillance Activity Checklist

Lot: Inspect security seals inventory

AQL: 99%

5.34.1 Process inbound freight

documentation

Timeliness: SF 361, Discrepancy report, and necessary reshipment will be completed within 30 calendar days of receipt of shipment.

Quality: Misconsigned and/or mismarked shipments will be correctly re-consigned inbound shipment documentation processed, recorded, and reviewed promptly and accurately.

Random sampling

Lot: Each inbound shipment received, or

AQL 95%

Movement of DODX Railcars

Timeliness: Disposition instructions from SDDC will be requested within 2 business days of notification of completion of mission. Coordinate with TSP to meet SDDC timelines. CBL will be provided to TSP at the time of pick up.

Quality: DODX cars will be completely and safely moved. Random sampling

Random sampling

Lot: Each request for DODX railcar movement completed at time of surveillance.

AQL: 99%

5.34.2 Provide loaded/empty rail car

numbers to TSP, UMC, & SDDC;

release rail cars to TSP.

Timeliness: Within 4 hours of interchange.

Quality: Information & release order is complete and accurate.

Surveillance activity checklist

Lot: Inspect rail car load plan completed at time of surveillance.

AQL: 99%

5.34.3 Coordinate interchange with

TSP

Timeliness: Coordination completed not less than 24 hours prior to arrival/departure of railcars.

Quality: To meet mission requirements.

Surveillance activity checklist

Lot: Inspect interchange completed at time of surveillance.

AQL: 97%

5.34.3 Protect Rail Crossings

Timeliness: Prior to Locomotive approach at pedestrian/vehicle crossing.

Quality: Completely and safely.

Flagmen will possess PPE which is visible in day and night.

Surveillance activity checklist

Lot: Each track crossing protected at time of surveillance.

5.34.3 Perform Interchange with rail

carrier. Clear obstructions on track.

Timeliness: Arrive 30 minutes prior to scheduled interchange. Obstructions cleared to allow timely arrival at interchange.

Quality: Safely and efficiently.

Surveillance activity checklist

Lot: Inspect interchange with Carrier.