This is a Requisition for Improvements and Procurement Document (RIPD) for the construction of an airlock wall at Building 299, Rock Island Arsenal. The document outlines specifications and requirements for the installation of Airlock Wall B299 (Revision 1), with an anticipated completion date of November 10, 2026. The project is associated with Solicitation Number W519TC27RA013 issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal for airlock doors at Rock Island Arsenal.

The solicitation includes a mandatory pre-construction site visit scheduled for December 3, 2026, at 10:00 AM Central Time at the Northeast corner of Building 299, Rock Island Arsenal-Joint Manufacturing and Technology Center (RIA-JMTC). All attendees must register at least two business days in advance and comply with safety requirements including steel-toed safety shoes and safety glasses. Reservations are mandatory regardless of existing installation access or badge credentials, as the government will control attendance numbers. This site visit is a prerequisite for participation in the bid process for this construction improvement project.

View the file

Other files

File Type Posted
25-4-05 Quality Assurance Surveillance Plan.xls XLS spreadsheet
W519TC27RA013.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCK ISLAND ARSENALRIPD: E4000-25-4-05
PURCHASE DESCRIPTIONDATE: 10-NOV-26

B299 AIRLOCK WALL

GENERAL SYSTEM DESCRIPTION

The purpose of this purchase description is for the construction of an airlock wall containing a high-speed large overhead door and one standard man-door within B299 at RIA-JMTC.

STANDARDS AND PUBLICATIONS

Clarification Any ambiguities, questions, requests for clarification or discrepancies between sections of this purchase description, drawings, national or industry standards discovered by the contractor in reviewing this purchase description shall be reported by the bidder in writing to the contracting officer BEFORE THE DATE SCHEDULED FOR CLOSE OF BIDDING/receipt of proposal. Submission of a proposal or bid shall be construed as evidence that such examination has been made. Therefore, later claims for labor, material, or equipment required, or for difficulties encountered, which could have been foreseen had such reasonable examination been made, may be denied.

National Standards and Specifications The contractor shall conform and provide equipment conforming to all local and federal codes and standards applicable to the equipment they are providing based on location and purpose of equipment in effect on the date of the opening of solicitation. It is not the responsibility of the government to make modifications to ensure compliance.

DESIGN

General Design Standards DEVIATION FROM PRODUCT: Modifications to the manufacturer’s standard design to achieve requirements as specified in this document are only permissible as dictated by good design practice. For example, mounting a 20-hp motor in a power train designed and normally using a 10-hp motor would not be acceptable.

UNITS OF MEASURE: Dimensions and capacities in this purchase description are given in the English-US (in-lb) system. All dials, gauges, and drawings shall be in the English-US system or both the English-US and the metric systems, unless otherwise specified in this document.

ID DATA PLATE: The equipment shall include a main data plate which will include the following data as a minimum requirement (additional information is acceptable): Manufacturer Name, Manufacturer’s Dunns and Bradstreet Number, Manufacturer’s Model Number, Manufacturer’s Serial Number, Year of Manufacture, Contract Number, Machine Weight. This information is necessary for compliance with the Government’s Unique Identification Program (UID).

DATA PLATES: All instruction, data and identification plates and labels attached to this equipment and its controls shall be manufactured of corrosion and oil-resistant metal or plastic material. All wording shall be in the English language using plain, bold face lettering. Lettering shall be permanent and have a contrasting background.

UTILITY CONNECTION: Equipment supplied to the Rock Island Arsenal will have single point shut-off for each utility supplied to a system. This means that equipment constituting a single system shall be wired to a single main electrical disconnect point, plumbed to a single pneumatic shut-off valve, etc… This will be referred to as the “point of first connection”. Each type of power source may have only one point of first connection. E.g. (1) pneumatic shut-off valve, (1) water supply shut-off valve, (1) electrical disconnect, etc… Each point of first connection shall be clearly labeled on the system and shown in the safety lockout portion of the documentation package. These points must be located on a stationary component and positioned such that they will not create a hazard to personnel during normal operation of the system. The first connection points shall be accessible from the shop floor without the use of ladders, steps, or stools. Access cannot be hampered by operation of the system.

UTILITY CONNECTION LABOR: Rock Island Arsenal shall provide only such labor and materials as will be needed to connect facility utilities to each point of first connection of the system. The supplier will be responsible for all connections beyond the point of first connection for each utility.

UTILITIES AVAILABLE: Rock Island Arsenal shall be responsible for providing the following:

1.1.1.1 Connection of 460-V, 60-Hz, 3-Ph AC electrical power to the fused or breaker type disconnect switch required in the ELECTRICAL DISCONNECT paragraph of this purchase description. Connection does not include filters, surge protection, or any peripheral equipment necessary to make the equipment functional.

ELECTRICAL DISCONNECT: The equipment shall be equipped with a manual, fused or breaker type disconnect switch, readily accessible to the operator, which will deactivate the entire equipment. It shall be located no more than 6-ft 7-in from the floor to the highest point the control device. It shall be capable of being locked in the de-energized state (OFF) only.

DEFLECTION: The system shall recover from distortion and deflection at no load. The machine and its components shall be sufficiently rigid that work piece finish and tolerances are not impaired by machine vibration.

NEW EQUIPMENT: The equipment furnished under this purchase description shall be new and unused.

COMPONENT ENVIRONMENT: Under no circumstances shall a component be used in an application not recommended by the component manufacturer. Components shall not be subjected to conditions of operation beyond the recommendations of the manufacturer, such as excessive heat, lack of lubrication, over-loading.

FASTENING DEVICES: All screws, pins, bolts, and similar parts shall be installed in such a manner as to prevent change in tightness. Those devices subject to removal or adjustment shall not be swaged, peened, staked, or otherwise permanently deformed. They shall not be installed using permanent bonding adhesives.

PAINTING: All unfinished surfaces of the equipment shall be painted with a lead-free and chromium-free commercial grade of metal primer and a minimum of one finish coat. The color shall be in accordance with the manufacturer’s standard commercial practice, or as necessary to maintain compliance with OSHA regulations, as applicable.

Safety, Security and Environmental SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safeguards, various precautions, and plant protection measures. All of the below requirements will be necessary of contractors visiting RIA to satisfy requirements of this purchase description; Additional requirements will be placed on contractors requiring access to the Army Network, or Common Access Card (CAC), as specifically detailed below. At all times during the execution of this work, contractor personnel will maintain adequate plant protection devices to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the island.

1.1.1.2 Access and General Protection/Security Policy and Procedures: The contractor and any associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Director of Emergency Services. All contractor employees must comply with all personal identity verification requirements (IAW FAR clause 52.204-9) as directed by Department of Defense (DoD), Headquarters Department of the Army (HQDA), and any local policy. If the Force Protection Condition (FPCON) changes, the Government may require changes in contractor installation access, security matters, or security processes.

1.1.1.2.1 Access to RIA: Contractor and all subcontractor employees performing work at RIA shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) and any applicable installation, facility access screening and local security policies and procedures. The JMTC Representative/ COR shall provide guidance to complete the Access Control Records Check request Form though the Rock Island Arsenal Directorate of Emergency Services.

1.1.1.2.2 Random Antiterrorist Measures Program (RAMP) Participation: Contractor personnel are subject to RAMP security program (i.e. vehicle searches, wearing of ID badges, etc.). Contractor shall comply with all instructions issued by the Rock Island Arsenal Police Department. The RAMP is discussed in the RIA-JMTC Anti-Terrorism Training.

1.1.1.2.3 During FPCONs levels of Charlie or Delta, services may be discontinued/postponed due to a higher National or local security threat. Services will resume when FPCON Level is reduced to Bravo, or lower. FPCON levels are described in Anti-Terrorism Level I Training.

1.1.1.2.4 Contractor personnel shall return all Installation Badges and access passes as soon as possible prior to contract completion. RIA-JMTC electronic keys and access passes are accountable items, shad shall be returned within 24-hours of no longer being needed. Items will be returned to the COR, or paced in a drop box at a RIA-JMTC access point.

1.1.1.3 Security Training: The contractor shall complete the following training:

1.1.1.3.1 Anti-Terrorism, Level I: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Anti-Terrorism (AT) Level I Awareness training. The COR will be provided a copy of the Rock Island Arsenal –Joint Manufacturing and Technology Center (RIA-JMTC) AT Level I Awareness Training and assure that the training is complete. The contractor shall sign a memorandum of record for each contractor employees and subcontractor employee to the RIA-JMTC Operations Center prior issuing any electronic keys, or access pass being authorized.

1.1.1.3.2 iWatch (See Something, Say Something) Training: The Contractor and all associated subcontractors shall complete iWatch Training. iWatch Training shall be provided during the Anti-Terrorism Training.

1.1.1.4 For Contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks onsite, or remotely or (2) Remote access via logon, to a DoD network using DoD-approved remote access procedures, or (3) Physical access to multiple DoD facilities or multiple Non-DoD Federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6-months, or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management. Contractors needing a NACI or equivalent investigation or higher investigation will coordinate this investigation through their COR. Contractor personnel shall turn in CAC cards upon completion of their contractual obligations, or at the request by the COR, or at the request of the Contracting Officer.

1.1.1.4.1 No CAC cards will be issued for this action.

FEDERAL MARIJUANA LAWS REMAIN UNCHANGED: Note: Rock Island Arsenal is under the exclusive federal jurisdiction of the United States. Under federal law, marijuana is still defined as a Schedule I drug, and possession and use of marijuana is still illegal. Any person using or in possession of marijuana on Rock Island Arsenal may be criminally prosecuted in federal district court. In addition, such individuals may be permanently barred from entering Rock Island Arsenal.

REAL ID: Starting 07-May-2025 all personnel entering Rock Island Arsenal will be required to show a Real ID form of identification.

FIRE PREVENTION AND PROTECTION: The contractor shall comply with all fire prevention measures prescribed in the installation Fire Regulations, a copy of which is on file in the office of the Contracting Officer. A written fire permit shall be obtained from the installation Fire Marshall for use of open-flame devices, such as torches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment, in, on, or within 15-ft of the building. The contractor shall be liable for any fire loss to the Government properly attributable to negligence on the part of the contractor, including failure to comp1y with fire prevention measure described by the terms of this purchase description.

INDUSTRY AND REGULATIONS: The equipment shall comply with the most current of all local, state, and federal laws and regulations listed in Standards and Publications.

MATERIAL EXCLUSIONS: The equipment shall not contain polychlorinated biphenyl (PCB), ozone depleting substances (Class I or Class II), or asbestos materials.

SAFETY REGULATION COMPLIANCE: The contractor shall comply with standard OSHA and RIA safety standards, including but not limited to conforming to confined space work requirements when applicable and wearing of Personal Protective Equipment (PPE) where designated.

SAFETY LOCKOUTS: Each point of first connection shall be designed and constructed to allow the utility to be completely isolated from the equipment. This isolation shall be insured by application of a standard key locking padlock. The device(s) shall only be lockable in the de-energized (OFF) condition.

EMERGENCY STOP: The system will incorporate a clearly identified, red, mushroomed, control button with a yellow backing plate. Upon momentary operation, any emergency stop button shall de-energize all machine motions and override all other controls without creating additional hazards. All motion stopped shall be restarted by the deliberate action of the operator (requiring manual reset). No other mushroomed red buttons shall be allowed on the equipment. It is preferred that there are no other red buttons of any type.

Responsibilities SITE INSPECTION: Any site inspections and/or measurements, which must be taken in order to determine the suitability of the proposed location or to perform the design of the system, are the sole responsibility of the contractor. This may begin prior to completing the bidding process. Rock Island Arsenal will support this function through the POC (point of contact) by guiding personnel, facilitating security registration, and providing general assistance. The contractor will be responsible for providing all equipment necessary for this process.

COMPONENT SPECIFICATION

Equipment: The supplier shall furnish all equipment normally considered by him to be standard for his machine unless identified in this requirement to be of specific manufacture. The following equipment shall be provided in addition to the equipment specified in other sections of this purchase description, which may not be standard. The inclusion of standard equipment in this paragraph is inadvertent and should not be construed to allow duplication. The contractor shall construct/supply an airlock wall containing a high-speed overhead door and one standard man-door within B299 RIA-JMTC.

Specifications:

Fire and Life Safety

1.1.1.5 Fire-Resistance Rating: Non-Rated (0-Hour)

1.1.1.6 The following flame spread standards must be met:

1.1.1.6.1 Flexible/Fabric Panels: Must be certified flame-resistant, complying with NFPA 701 (Standard Methods of Fire Tests for Flame Propagation of Textiles and Films).

1.1.1.6.2 Rigid Wall/Panel Systems: Must meet Class A Interior Wall Finish requirements per ASTM E84 or UL 723 (Flame Spread Index 25, Smoke-Developed Index 450).

1.1.1.6.3 Structural Framing: Must be non-combustible construction.

1.1.1.6.4 Sprinkler Coordination: The contractor must evaluate existing fire sprinkler head placements per NFPA 13. The airlock wall must not create non-compliant sprinkler obstructions.

1.1.1.6.5 Connection to Building Fire Suppression Control Panel: The overhead door must be connected to the building’s fire suppression control panel. The reset switch must be located such that it can be reset from floor level. Comment by Niles, Bradley D CIV USARMY RIA-JMTC (USA): Add this paragraph to ensure that the overhead door is connected to the Fire panel. Also make sure that the reset switch is located so that it can be reset from floor level (no use of man lifts to reset)

1.1.1.6.6 Door Width Specification: The door leaf must have a minimum nominal size of 3-ft width by 7-ft height to guarantee a minimum 32-inches of continuous clear opening width (measured from the face of the door at 90 degrees open to the frame stop). Nominal 2-ft 8-inches door leaves are strictly prohibited as their net clearance fails to meet life safety codes. The door must swing in the direction of exit travel and be equipped with code-compliant, single-motion panic hardware.

1.1.1.6.7 Ramp Landings: Because this wall is at the top of a ramp, the door cannot swing directly over the sloped surface. The contractor must ensure a flat, level landing extending a minimum of 12-inches beyond the full swing of the door before the ramp slope begins. Comment by Niles, Bradley D CIV USARMY RIA-JMTC (USA): JMTC should be able to control this by identification of the location of the wall and by the size of the pedestrian door.

Airlock Wall:

1.1.1.7 Shall be located at the top of an existing ramp, approximately ~82-ft inward from the West exterior of the building, in-line or next to (East side) of column R5. Comment by Niles, Bradley D CIV USARMY RIA-JMTC (USA): Specify the column line location

1.1.1.8 Shall be approximately 60-ft (W) x 38-ft (H).

1.1.1.9 Shall contain within its dimensions, one (1) large high-speed overhead door and one (1) standard man-door.

1.1.1.10 The power strip from the existing overhead bridge crane will need to be shortened and terminated.

QTY (1) Large High-Speed Overhead Door

1.1.1.11 Shall be 24-ft (W) x 21-ft (H).

1.1.1.12 Shall be contained within the dimensions of the air lock wall.

1.1.1.13 Shall operate via buttons and/or switches.

1.1.1.14 The door shall automatically stop at a height of 15-ft on its way up, with an override allowing the door to open to its full height.

1.1.1.15 Location shall be in-line with existing exterior overhead door.

QTY (1) Standard Man-Door

1.1.1.16 Shall allow access through the airlock wall.

1.1.1.17 Shall be non-locking and contain a viewing/transparent window.

1.1.1.18 The door shall be placed on the north end of the wall in line with the existing man-door of the exterior OH door.

APPROVAL/SHIPPING

Shipping RESPONSIBILITY: The contractor is responsible for delivery of the equipment to Rock Island Arsenal. Adequate preserving of equipment surfaces, packing, marking, and skidding of materials for shipment shall be the responsibility of the contractor.

SHIPPING SCHEDULE: Be aware, the Rock Island Arsenal will only off-load equipment arriving between 6:00 am and 12:00 pm (noon), local time Mondays through Thursdays except federal holidays. For information concerning holidays, the contractor should consult the contracting officer. There is no place to stage transporting vehicles awaiting the arrival of contractors. All equipment shall be delivered at the same time, meaning the same day (multiple trucks are acceptable) unless it is pre-authorized to deliver on multiple days by the RIA-JMTC contracting officer.

RECEIVER: All shipments to Rock Island Arsenal including installation tools and/or replacement parts, as well as the original shipment of the equipment, shall be marked “ATTN: Mr. Drew Canada TARA-LGC”. Items not correctly marked are subject to being returned at the vendor’s expense.

Installation SITE PREPARATION REQUIREMENTS: The contractor shall be solely responsible for any necessary site inspections required for determining the specifications of work that must be completed prior to final system installation. The contractor will then provide detailed information of any preparation work that the vendor must perform prior to system installation to Rock Island Arsenal.

SITE PREPARATION EXECUTION: The contractor will be solely responsible for site preparation except as specifically excluded in this document. This includes but is not limited to excavation, foundation work, and surface preparation. This work may be performed through the use of a sub-contractor, but the specification, supervision, and certification of the work remains the responsibility of the primary contractor.

PREPARATION EXECUTION SUPPORT: Rock Island Arsenal will support the preparation portion of the installation by providing utilities to the points of first connection.

LABOR AND MATERIAL: The supplier is solely responsible for providing all labor, materials, hardware, tools, and equipment necessary for complete installation/start-up of this system except as specifically listed in this document as being provided by the Rock Island Arsenal.

SUPERVISION: Supervision of the installation process will be the responsibility of the contractor. Rock Island Arsenal shall retain the right to periodic inspection and evaluation of the process, as it deems necessary.

OFF-LOADING/PLACEMENT: Off-loading of the equipment from the delivery vehicle, and placement of the equipment in position for the installation is the responsibility of the contractor. The contractor shall not be allowed to use government equipment to accomplish this work.

SET-UP: The contractor shall be responsible for construction and connection of the equipment beyond connections of the utilities to the points of first connection.

Completion Final acceptance of the equipment shall occur after the following:

1.1.1.19 Set-up completion by the contractor.

1.1.1.20 Successful completion of performance testing at Rock Island Arsenal.

1.1.1.21 Final inspection approval by the government representative or inspector. This is to verify full compliance with this description to include amendments and modifications to the final contract. The government representative shall perform any and all tests he deems necessary to insure compliance with this description and industry standards to include, but not limited to ease of control, convenience of operation, safe operation, and adequacy of lubrication devices.

1.1.1.22 All required training is complete.

1.1.1.23 Complete documentation packages are delivered.

SERVICE

Service/Support Requirements The contractor shall have as a minimum, a verifiable service/repair capability which meets or exceeds the following requirements:

STAFF: Staffed by qualified, English-speaking personnel fully knowledgeable in the service/repair of the equipment offered.

TELEPHONE ACCESS: Telephone access to service/repair personnel shall be available for consultation during Rock Island Arsenal normal working hours. Rock Island Arsenal normal working hours are 8:00 am CST to 3:00 pm CST, Monday through Friday, except legal federal holidays.

ON-SITE RESPONSE: Physical, on-site response shall be possible within 48-hrs of notification that service/repair of the equipment is necessary.

MAINTENANCE PARTS: Parts necessary for periodic replacement such as belts, hoses, filters, and other parts normally considered as spare parts, by the manufacturer, shall be stocked and available for shipment.

PRIOR HISTORY: Said service/repair capability shall have been available to the general public prior to the issue date of this purchase description. Adequate proof of prior availability shall be provided upon request.