25-4-05 Quality Assurance Surveillance Plan.xls
XLS spreadsheet 42 KB Posted
- Attached to
- Airlock Doors - Rock Island Arsenal
- Solicitation number
- W519TC27RA013
About this file
This is a Quality Assurance Surveillance Plan (QASP) template document in spreadsheet format. The file is designed to establish monitoring and evaluation procedures for contractor performance on the Airlock Doors project at Rock Island Arsenal. While the specific performance metrics and surveillance activities are not detailed in the provided file reference, this QASP would typically outline inspection schedules, acceptance criteria, testing protocols, and performance standards that the contractor must meet throughout the contract execution period. The plan serves as the government's tool for ensuring the contractor delivers compliant products and services in accordance with the solicitation requirements for the airlock door installation and construction activities at Rock Island Arsenal's Joint Manufacturing and Technology Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W519TC27RA013.pdf | ||
| RIPD E4000-25-4-05 Airlock Wall B299 (R1) (10-Nov-26).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP
| Task | Contract Reference | Frequency | Performance Standard | Acceptable Quality Level | Surveilance Method | Surveilance Date(s) | Performance Level | Notes |
| Site Conference | Sheet 1 - Security Notes | Once | Each individual working at the site must receive this information for safety and accountability purposes. May be updated if additional personnel come to the work site. May be performed as part of the badging process. | 100% | Visual/Roster | |||
| Work Roster | Sheet 1 - Security Notes | Daily | Must be maintained for safety and security purposes. Must show who is at the work-site at any given time. | 90% | Written Roster | |||
| Project Timeline | Dictated by contract | Once | To be provided within 1-week of award of the contract. Must show plan for completion prior to the date stated in the contract. May be adjusted during performance provided within project completion date. | 100% | Visual/Written | |||
| Site Inspection | Sheet 1 - Security Notes | Daily | Observe work is being performed safely and in accordance with the contractor provided timeline and IAW the contracted Scope of Work | 90% | Visual | |||
| Materials Inspections | Sheet 1 - Notes 1-17 | Random | Materials provided by the contractor may be inspected to ensure that they meet the contracted Scope of Work and minimum industry and design standards. (e.g. slump or temperature tests of incoming concrete) | 100% | Visual/ Measurement | |||
| Final Inspection | Sheet 1 - Notes 1-17 | Once | Verify that all work is completed IAW the contracted Scope of Work | 100% | Visual |
&LRock Island Arsenal Quality Assurance Surveillance Plan&CAirlock Wall&RTARA-LG-25-4-05
DATE: 06-10-2026
File details come from the government source that posted it. Updated .