ICT SCRM Illumination Tool Industry Day.pdf
PDF 1 MB Posted
- Solicitation number
- W519TC-26-R-SCRM
About this file
ICT SCRM Industry Day Briefing Summary
This is an industry day briefing document for the U.S. Army's Information and Communications Technology (ICT) Supply Chain Risk Management (SCRM) initiative, held on October 1, 2025, with a call for solutions release date of August 24, 2026. The Army seeks a Commercial-off-the-Shelf (COTS) software platform or Software-as-a-Service (SaaS) tool to automate continuous vetting of IT hardware, software, and services across the entire procurement lifecycle, addressing vulnerabilities in the legacy stove-piped and manual approach to compliance.
The solicitation requires vendors to submit two mandatory components: a technical white paper (maximum 7 pages, PDF format, 11-point Cambria font) and a recorded video demonstration (unlisted YouTube link, maximum 15 minutes) due by 1200 EST on September 9, 2026. Submissions must be sent to corene.n.feddersen.civ@army.mil (Contracting Officer) and megan.e.haffey.civ@army.mil (Specialist) with subject line "ICT SCRM Submission – [Company Name]." Evaluation employs a two-pronged approach: five pass/fail gate criteria (completeness, administrative formatting, core software availability, API integration readiness, video demonstration compliance) followed by five weighted technical factors addressing system architecture and API integration, automated catalog ingestion and regulatory vetting, continuous corporate monitoring, workflows and alert management, and supplementary analyst support services. The initiative mandates continuous vetting for Foreign Ownership, Control, or Influence (FOCI), Trade Agreements Act (TAA) and National Defense Authorization Act (NDAA) Section 889 compliance, anti-counterfeiting measures, and Ultimate Beneficial Ownership (UBO) transparency across 10,000+ SKU hardware and software catalogs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ICT SCRM INDUSTRY DAY
WILL COMMENCE AT
10:00 a.m. EST
Information and Communications Technology (ICT) Supply Chain Risk Management (SCRM) Industry Day
PREPARE. PROCURE. PERFORM. OUTPACE. OCTOBER 1, 2025SEPTEMBER 2, 2026
This brief is marked "Distribution Statement A.
Approved for Public Release, Distribution Unlimited".
Time
10:00 - 10:05
10:05 – 10:15
10:15 – 10:25
10:25 – 10:30
[BREAK]
10:40 – 11:00
Speaker Objective
Contracting Officer
Product Manager (PM) / Functional Sponsor
Product Lead (PL)
Deputy PL
DPL (Moderator) & PL
Set ground rules. Emphasize that verbal remarks are non-binding and outline how formal Q&A will be handled via SAM.gov
Explain the strategic vision. Discuss the ICT SCRM Army Memo.
Walk through the Requirements
Topic
Explain the Phased approach and evaluation process
Live Q&A
Welcome & Rules of Engagement
PM Introduction & Problem Statement
Deep Dive: Requirements
Evaluation & Submission Process
Moderated Q&A
AGENDA
Briefer: Jessica Li
OPENING REMARKS
Mr. Doug Haskin Project Manager
Acquisition, Training & Readiness
Ms. Lucy Chung Product Lead Digital Market
Distribution & Publication
• This brief is marked “Distribution Statement A. Approved for Public Release, Distribution Unlimited”.
• The Government will not publish Industry- Proprietary questions/comments or their responses.
• The Government intends to publish Industry- General frequently asked questions (FAQs) with Government-prepared responses.
• The “final” version of these slides will be posted to www.SAM.gov
Acquisition & Authority
• Nothing presented in this Industry Day commits the U.S. Army to any acquisition approach, agreement, or contract.
• Any future published opportunity will take precedence over information presented today or in response to questions.
• Session is conducted under the Commercial Solutions Opening (CSO) framework in accordance with DFARS Part 212—specifically DFARS 212.70— and the Army Open Solicitation procedures.
Resources &
Follow-On Actions
• Post-Industry Event Questions Link:
www.SAM.gov
• Call for Solutions on SAM.gov:
https://sam.gov/workspace/contract/op p/66a6e1dc27954057a1d3279fbcd77f 0f/view
1 2 3
RULES OF ENGAGEMENT
Briefer: Nicole Feddersen
GUIDANCE / VISION KEY REQUIREMENTS:PROBLEM STATEMENT
ICT SCRM ILLUMINATION SOLUTION
Briefer: Doug Haskin
Policy: Army Information and Communications Technology (ICT) Supply Chain Risk Management (SCRM) mandated 20 July 2026.
Mandates continuous vetting of COTS IT products for Foreign Ownership, Control, or Influence (FOCI), vulnerabilities, and counterfeits.
Establish a pre-vetted, trusted ecosystem allowing direct procurement of hardware and software.
The Army's legacy approach to ICT-SCRM is stove-piped and manual, creating critical vulnerability gaps.
Advanced persistent threats and counterfeiting networks can bypass static, point-in-time compliance gates.
Army requires a SCRM illumination and continuous monitoring tool to automate the vetting of IT hardware, software, and services across the entire procurement lifecycle.
“Software not Service” – Government requires a user operable Commercial-off-the-Shelf (COTS) software platform or Software-as-a-Service (SaaS) tool.
REQUIREMENTS: 1 - 3
System Architecture & API Integration
Requirement
• Secure and well-documented RESTful APIs designed to push continuous alerts, risk scores, and compliance data natively.
• Security and Authorization – Vendor must demonstrate zero-trust model.
• Provide description of the platform's technical architecture.
FACTOR
Automated Catalog Ingestion & Regulatory
Vetting (HW/SW) Requirement
• Ability to ingest process for ingesting, normalizing, and screening massive 10,000+ SKU hardware and software catalogs.
• Verify true OEM sourcing - Automatically identify and verify the original manufacturer, avoiding obfuscated supply networks and unauthorized middle-tier entities.
• TAA and NDAA compliance - Instantly flag Trade Agreements Act violations and NDAA Section 889 telecommunication restrictions without manual analyst intervention.
• Anti-Counterfeiting - Vet products for counterfeit indicators and safeguard critical equipment hardware.
FACTOR
Continuous Corporate Monitoring
Requirement
• Tool must continuously monitor prime contractors and evolving sub-tier service providers to ensure the integrity of IT software, hardware, and service-based programs.
• FOCI (Foreign Ownership, Control, or Influence) - Continuous scanning for foreign influence and geopolitical exposure risks.
• Ultimate Beneficial Ownership (UBO) - Expose hidden ownership layers to avoid blocked entities or actors.
• Dynamic tracking of vendor corporate restructuring and financial instability.
FACTOR
Briefer: Lucy Chung
REQUIREMENTS: 4 - 5
Briefer: Lucy Chung
Workflows, Alert Management & Handoffs
Requirement
• Role-Based Access: Distinct views for Contracting and Cyber analysts.
• Alert Tuning: Built-in mechanism to aggressively reduce false positives.
• Digital Routing: Seamlessly escalate automated risk alerts to dedicated SCRM analysis teams.
FACTOR
Supplementary Analyst & Support Services
Requirement
• Understanding of available professional services and analyst support.
• Cost structure - distinctions between included platform support and any add-on professional or engineering services
• Clear separation between standard product features and supplemental services
FACTOR
EVALUATION PROCESS
Gate Criteria (Pass/Fail)
1. Completeness
2. Administrative Formatting
3. Core Software Availability
4. Application Programming Interface (API)
Integration Readiness
5. Video Demonstration Compliance
Technical Evaluation Factors (Weighted)
1. API Architecture & Integration Readiness
2. Automated Catalog & Compliance Scalability
3. Continuous Vendor Surveillance
4. Procurement Usability & Workflow Routing
5. Supplementary Services & Technical Support
Submissions will be evaluated via a two-pronged approach:
SUBMISSION FORMATTING
Government will utilize a single- phase submission process, package will consist of two mandatory parts.
Submission Parts Formatting Requirements
Technical White Paper: A highly focused technical document detailing how the vendor's software addresses the five core operational areas.
Page Limit: Maximum of seven (7) pages (excluding cover page).
Format: PDF format, 11-point Cambria font, single-spaced with standard 1-inch margins.
Prohibitions: General corporate marketing material, boilerplate history, and glossy brochures will not be reviewed. Responses must strictly follow the headers below.
Recorded Video Demonstration: A secure online streaming link containing a recorded walk-through showing the live software platform executing key workflows.
Delivery Method: The recorded demonstration must be submitted exclusively as an unlisted YouTube link. Direct uploads of raw MP4 or other video files, as well as password-protected files or external cloud sharing links (such as Google Drive or Dropbox), will not be accepted.
Duration: The video must not exceed 15 minutes in length.
Data Content: The demonstration must utilize vendor-provided mock data representing typical commercial IT catalogs. No actual Government data will be provided for this effort.
Access Requirements: The provided YouTube video must be configured as unlisted so that it is not searchable by the public, but it must remain active and accessible to Government evaluators for the duration of the evaluation period. Because the video contains non-sensitive mock data, no additional security controls or password protection are required.
Submissions that do not comply with the above formatting requirements will not be accepted.
SUBMISSION DETAILS
Call for Solution Release Date: 24 August 2026
Solution Briefs Due: 1200 EST 09 September 2026
Email Submission Address:
Contracting Officer: corene.n.feddersen.civ@army.mil Specialist: megan.e.haffey.civ@army.mil
Required Subject Line Format: ICT SCRM Submission – [Company Name]
10:00 BREAK
Q&A
Questions & Answers Session
Moderator: Jessica Li
THE ARMY RELIES ON
Capability Program Executive Enterprise Software and Services (CPE ES2)
| Slide Number 1 |
| Information and Communications Technology (ICT) �Supply Chain Risk Management (SCRM) Industry Day |
| Slide Number 3 |
| OPENING REMARKS |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| THE ARMY RELIES ON�Capability Program Executive Enterprise Software and Services (CPE ES2) |
File details come from the government source that posted it. Updated .