Solicitation Amendment 0002 - W519TC26RA072 (02SEP26).pdf
PDF 4 MB Posted
- Solicitation number
- W519TC-26-R-A072
About this file
This is Amendment 0002 to Solicitation W519TC-26-R-A072, a Firm-Fixed-Price (FFP) commercial construction solicitation issued by the United States Army Contracting Command - Rock Island (ACC-RI) for utility installation at a new RV Campground Site on Rock Island Arsenal, Rock Island, Illinois. The project involves furnishing all labor, equipment, and material to install an 8-inch HDPE water main with fire hydrant, a 1-inch poly gas main with meter, and a 13.8 KV overhead electrical feed to a 750 KVA transformer, including excavation and restoration of existing surfaces. This is a 100% Small Business Set-Aside procured under FAR Part 12 commercial service regulations in conjunction with FAR Part 36 construction requirements. The contractor must complete all work within 180 working days of receiving the Notice to Proceed, with liquidated damages assessed at $1,000 per working day for delays. Amendment 0002, effective August 31, 2026, updates the wage determination attachment and adds site visit attendee information; the site visit is scheduled for September 1, 2026, at 10:30 AM Central Time with RSVP required by August 28, 2026.
Proposals are due September 15, 2026, at 10:00 AM Central Time and must be submitted electronically with a maximum 10 MB per email. Offerors must have active System for Award Management (SAM.gov) registration at submission and submit a Bid Bond (SF 24) equal to 20% of bid price or $3,000,000, whichever is less. The price proposal must include CLIN 0001 for the base bid total FFP, CLIN 0002 for rock excavation (595.0 cubic yards) at a unit price per cubic yard, and CLIN 0003 for granular stabilization (70.7 tons) at a unit price per ton; costs for CLINs 0002 and 0003 must not be included in the base bid. Contractor must commence work within 45 working days of receiving the Notice to Proceed and submit the project schedule and Contractor Quality Control Plan within 15 days of NTP, with other pre-construction submittals due within 30 days of NTP. Davis-Bacon prevailing wage rates apply per the Department of Labor Wage Determination for Rock Island, Illinois. All questions must be submitted in writing via email no later than September 8, 2026. Primary point of contact is Hila Anderson, Contract Specialist (hila.r.anderson.civ@army.mil); secondary contact is Kathleen M. Ward, Contracting Officer (kathleen.m.ward20.civ@army.mil).
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form
The following changes have been made:
Miscellaneous text in this section has been modified to:
Section A: Executive Summary
Project Overview
The United States Army Contracting Command - Rock Island (ACC-RI) is issuing this commercial solicitation for a Firm-Fixed-Price (FFP) contract to furnish all labor, equipment, and material to install utilities for a new RV Campground Site located on the Rock Island Arsenal, Rock Island, IL.
The work includes the installation of an 8" HDPE water main with a fire hydrant, a 1" poly gas main with a meter, and a 13.8 KV overhead electrical feed to a 750 KVA transformer. The scope also includes excavation and the repair of existing surfaces to match the original condition. All work shall be performed in accordance with the attached Statement of Work (SOW) and technical appendices.
Acquisition Strategy
This requirement is a 100% Small Business Set-Aside and is being procured as a commercial service under FAR Part 12 in conjunction with mandatory FAR Part 36 construction regulations.
Project Completion & Liquidated Damages
The contractor is required to complete the entire project within 180 working days after receiving the Notice to Proceed (NTP). Failure to complete the project within the allotted 180-working-day timeframe will result in the assessment of liquidated damages (FAR 52.211-12) in the amount of $1,000.00 for each working day of delay until the work is completed and accepted.
Site Visit & Questions
Site Visit: A site visit is scheduled for . September 1, 2026, at 10:30 AM Central Time Interested vendors must RSVP to the Contacts listed below no later than August 28, 2026.
Attendance is highly encouraged. This will be the offeror's opportunity to verify site access, assess the general topography, and identify any visible conditions that may impact the work.
W519TC26RA0720002
1.
2.
3.
Offerors are responsible for information that would be available from a reasonable site investigation Questions (RFIs): All questions regarding this solicitation must be submitted in writing via email no later than September 08, 2026.
Proposal Submission and Evaluation The Government will award a single FFP contract to the responsible offeror whose proposal is determined to be the most advantageous to the Government through a comparative evaluation.
Offerors are strongly encouraged to carefully review the following sections to ensure their proposals are compliant:
How to Submit: Please refer to Section L, Instructions to Offerors, located on Page 57. This outlines the required Schedule and Key Personnel, Past Performance, Price Proposal and Responsibility Documents (Bid Bond (SF 24) requirements and Licensing).
How You Will Be Evaluated: Please refer to Section M, FAR 52.212-2, Evaluation Factors, located on Page . This explains the comparative evaluation process focusing on the 61 Schedule and Key Personnel, Past Performance, and Price.
Price Proposal should include the following CLINs:
CLIN 0001 (Base Bid): Provide a total Firm-Fixed-Price (FFP) for all work described in the
SOW.
CLIN 0002 (Rock Excavation, 595.0 Cubic Yards): Provide a Firm-Fixed Price (FFP) Unit Price per Cubic Yard for rock excavation, based on the Government-estimated quantity. Do not include costs for this material in the CLIN 0001 base bid.
CLIN 0003 (Granular Stabilization (Core Out), 70.7 Tons): Provide a Firm-Fixed Price (FFP) Unit Price per TON for granular stabilization, based on the Government-estimated quantity.
Do not include costs for this material in the CLIN 0001 base bid.
Quantity Estimate and Overage Instructions
The quantity provided for this CLIN is a Government estimate for initial funding and proposal evaluation purposes only. This is a Firm-Fixed Price Unit-Price CLIN. The Government will only pay the Contractor for actual, verified quantities utilized on-site, calculated at the Contractor's established firm-fixed unit price. All utilized quantities must be verified and signed for daily by the Contracting Officer's Representative (COR).
Overages: If subsurface conditions require quantities that exceed the initial funded estimate, the Contractor must stop work on this specific task and notify the Contracting Officer in writing immediately. The Government will pay for verified overages at the established fixed unit rate;
however, no work shall be performed, and no payment shall be made for quantities exceeding this initial estimate until the Contracting Officer issues a formal, bilateral contract modification adding the necessary funds.
1.
2.
3.
4.
5.
Proposal Deadline and Contacts
Proposals are due no later than: 2026, at 10:00 AM Central Time.September 15, SAM.gov Registration: Offerors must have an active registration in the System for Award Management (SAM) at the time of proposal submission to be considered for award.
Primary Point of Contact: Hila Anderson, Contract Specialist, hila.r.anderson.civ@army.mil Secondary Point of Contact: Kathleen M. Ward, Contracting Officer, Kathleen.m.ward20.
civ@army.mil
Critical Operational and Compliance Requirements
Potential offerors are strongly encouraged to thoroughly review the Scope of Work (SOW) and Specifications for significant operational requirements that may impact proposal pricing and staffing. Key requirements include stringent personnel qualifications, extensive post-award submittals such as detailed Accident Prevention (APP) and Contractor Quality Control (CQC) Plans requiring a Site Safety and Health Officer (SSHO); following all environmental requirements in accordance with SOW Section 4.2; and mandatory security measures in SOW Section 3.1.
Critical Administrative and Compliance Instructions Offerors are advised that the following requirements are mandatory. Failure to submit any of these documents in the format and manner prescribed will render the proposal ineligible for award.
Bid Guarantee (Bid Bond): In accordance with FAR 52.228-1, offerors must submit a Bid Bond (SF 24) equal to 20% of the bid price or $3,000,000, whichever is less. Electronic submission of the bond is permitted. If the surety seal is unrecognizable or unreadable on the electronic copy, the offeror must provide a verifiable method to confirm the seal's authenticity (e.g., a certified electronic signature/stamp from the surety).
Electronic Submission Instructions: Proposals are due no later than 2026, at September 15, 10:00 AM Central Time. Submissions must be sent via email to the Contract Specialist and Contracting Officer. Email attachments must not exceed 10 MB per email. Use the subject line: and request a read receipt."Proposal - W519TC-26-R-A072 - [Company Name]" Commencement of Work: The contractor must formally commence work within 45 working days of receiving the Notice to Proceed (NTP).
Post-Award Submittals: The successful contractor shall submit the project schedule and Contractor Quality Control (CQC) Plan within 15 days of NTP. All other required pre-construction submittals (e.g., Accident Prevention Plan) must be provided within 30 days of
NTP.
Davis-Bacon Wage Rates: Prevailing wage rates apply under the Construction Wage Rate Requirements statute. The applicable Department of Labor Wage Determination for Rock Island, IL is attached to this solicitation and will be incorporated into the final contract.
6.
7.
8.
SAM.gov Registration: Offerors must have an active System for Award Management (SAM.
gov) registration at the exact time of proposal submission to be eligible for award.
Administrative Notices: This Executive Summary is provided for convenience and clarity; in the event of any conflict, the formal terms, conditions, and clauses of the solicitation shall govern. Offerors shall not contact the requiring activity (Rock Island Arsenal DPW) directly regarding this requirement.
Points of Contact: All communications must be directed to the following:
Primary: Hila Anderson, Contract Specialist, Hila.r.anderson.civ@army.mil Secondary: Kathleen M. Ward, Contracting Officer, Kathleen.m.ward20.civ@army.mil
Section A: Executive Summary for Amendment 0002
1. The purpose for Amendment 0002 to Solicitation W519TC-26-R-A072 is to provide the following:
Attachment 0005_2023-0742_Wage Determination (Updated) Attachment 0007_2023-0742_Site Visit Attendees (01SEP26)
2. Point of Contact: All questions and communications must be directed to the following:
Primary: Contract Specialist, Hila Anderson (hila.r.anderson.civ@army.mil) Secondary: Contracting Officer, Kathleen Ward (kathleen.m.ward20.civ@army.mil)
3. All other terms and conditions of Solicitation W519TC-26-R-A072 remain in full force and effect.
List of Attachments
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under
Separat e Cover
0005 UPDATED_Att achment 0005_2023- 0742_Wage Determination
Wage Determination 01 Sep
15 Attach ment
No
0007 Attachment 0007_2023- 0742_Site Visit Attendees
(01SEP26)
Site Visit Attendees 01 Sep
Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0005 UPDATED_Att achment 0005_2023- 0742_Wage Determination
Wage Determination 01 Sep
23 Attach ment
No
0007 Attachment 0007_2023- 0742_Site Visit Attendees
(01SEP26)
Site Visit Attendees 01 Sep
1 Attach ment
No
The following contract documents were added:
Attachment 0007_2023-0742_Site Visit Attendees (01SEP26) UPDATED_Attachment 0005_2023-0742_Wage Determination
The following contract documents were deleted:
Attachment 0005_2023-0742_Wage Determination
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
UPDATED_Attachment 0005_2023-0742_Wage Determination 15 23
Attachment 0007_2023-0742_Site Visit Attendees (01SEP26) none 1
| IDCode: J |
| Page: 1 |
| Pages: 7 |
| AmendNo: 0002 |
| EffDate: 31 AUG 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W519TC |
| AdmCode: |
| IssuedBy: W6QK ACC-RI |
ACC ROCK ISLAND BLDG 60, 3055 RODMAN AVE
ROCK ISLAND, IL 61299-0000
UNITED STATES
HILA ANDERSON, EMAIL: HILA.R.ANDERSON.CIV@ARMY.MIL TELEPHONE: 520-693-0185
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W519TC26RA072 |
| SolDate: 24 AUG 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Provide Site Visit Attendance List and update Attachment 0005_2026-0215_Wage Determination. |
| ContNameTitle: |
| CoNameTitle: KATHLEEN M. WARD |
| ContDate: |
| CODate: 02 SEP 2026 |
File details come from the government source that posted it. Updated .