This document is a technical drawing set for the 208B Ultra Sonic Pit project at Rock Island Arsenal JMTC Plant Engineering Directorate, dated 02-24-26 and drawn by B. Niles with approval from R. McClure.
The project involves construction of an underground pit in the basement of Building 208, measuring 66 inches deep with dimensions of 168 inches by 232 inches. The work includes saw cutting and removing the existing concrete floor slab, excavating to 66 inches below finished floor level, placing 6 inches of CA6 compacted base material, installing #5 rebar at 12" x 12" grid spacing in both directions, and constructing an 8-inch-thick concrete pit wall with minimum 5000 PSI concrete. The wall will be dowelled to the existing floor with #4 rebar spaced 12" on center, and the top will be fitted with galvanized angle steel to support metal grating. Expansion board measuring 1/2 inch thick is required between the new wall and existing structure, with 1/2-inch rigid foam insulation for vibration isolation. The contractor must also expand an existing overhead door opening from 72" x 96" to 96" x 112" and install a new insulated powered roll-up overhead door. General construction requirements include dust control through water application, barricading 6 feet from the work area, concrete transport haul time limits based on temperature conditions, jack hammering restricted to 2:30 PM to 11:00 PM or Saturdays, and all work performed by competent qualified workmen per AISC standards. The project site is located inside a 40-foot by 20-foot room with approximately 10-foot ceiling height and existing crane rail that must be protected during construction. Security requirements mandate that all contractor personnel complete AT Level I awareness training, background checks, and comply with installation access procedures and the RAMP program.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
GENERAL LOCATION
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
B. NILES
TARA-LGC
SHEET- 1 OF 6R. MCCLURE
02-24-26
208B ULTRA SONIC PIT
2-G 3-G
4-G
6-G
50 52
X
X
PC
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
M I S S
I P P
I R
I V E R
LOCATION ON ROCK ISLAND ARSENAL
102 104
157120144
301-G
314 312
220210
332333
204203
R O
C K
IS
L
A N
D
U .S . G
O V
E R
N M
E N
T
B R I D
G E
PARKING
RODMAN
D A V E N P
O R T
G
IL
L E
S P
IE
KINGSBURY
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
TERRACE
PARKING PARKING PARKING
HEDGE
LANE
SOUTH AVENUE
NORTHAVENUE
PARKING
PARKING
PARKING
PARKING
E A
S T
RODMAN
DRIVE
BECK
SYLVAN
AV
EN
U E
KING
DRIVE
SHED
B L U
N T
R O
A D
PROSPECT
DRIV
E
D R
IV
E
C E
M E T E R
Y
D R
IV
E
DYKE
ROAD
R O
D M
AN
BLUNT
PARKING
PARKING
PARKING
PARKING
PARKING
79 83
S Y
V N
R
IV
E
AVE
BAUMBECK AVENUE
216212
LO
C
K
AND
DAM
NO
. 1
BETTENDORF
DAVENPORT
MOLINE
ROCK ISLAND
C A N A L
M
O
L
I N
E
S L O U G H
E. RIVER DR. GRANT ST.
2ND ST.
4TH ST.
3RD ST.
STATE ST.
21 29
30-G
70-G
X
X
X
X
X
X
X X
X X
X
X X
X
X X X X X X X X X X X
X X
X
X X
X
X
X
X
X
X X
X
X X
X
X
X
X
X
X X
X
X
X
X
X X X
X
X
X
X
X
XX
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X
X
208B ULTRA SONIC PIT
GENERAL SECURITY NOTES
GENERAL LOCATIONS AND TABLE OF CONTENTS
LAYOUT PLANS
GENERAL NOTES
ELEVATION/DEMO PLANS
ELEVATION/CONSTRUCTION PLANS
bradley.niles Text Box bradley.niles Typewritten Text
ROOM DOOR MODIFICATION/REPLACEMENT
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
NOTES
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
GENERAL NOTES
B. NILES
208B ULTRA SONIC PIT
SHEET- 2 OF 6R. MCCLURE
02-24-26
TARA-LGC
of Discharge F (C) Concrete Temperature at Point
50-64 (10-17.5)
65-90 (18-32) - without retarder
65-90 (18-32) - with retarder
Haul Time
Hours Minutes
DURING THE CONSTRUCTION PROCESS.
WHICH WILL NEED TO BE PROTECTED FROM DEBRI AND DAMAGE
CEILING HEIGHT. THERE IS ALSO A CRANE RAIL IN LOCATION
17.THE AREA IS INSIDE A 40' BY 20' ROOM WITH ROUGHLY 10'
NEW JOINTS.
EXISTING FLOOR EVERY 24". PLACE AUTOLEVELING SEALER ON THE
FLOOR AND FOUNDATION. THE NEW WALL WILL BE DOWELLED TO THE
EXPANSION BOARD IS REQUIRED BETWEEN NEW WALL AND EXISTING
PLACED ON THE TOP OF THE WALL FOR GRATING TO SIT ON.
AND FLUSH WITH EXISTING WALL HEIGHT. GALVANIZED ANGLE WILL BE
WILL HAVE AN OFFSET TO ALLOW FOR METAL GRATING TO BE PLACED
GRID WIRED IN FOR STRUCTURE REINFORCEMENT. TOP OF THE WALLS
HEIGHT. WALL WILL BE 8 INCHES THICK WITH A 12" BY 12" #5 REBAR
TOP OF THE BASE PAD SHOULD BE 48" BELOW EXISTING FLOOR SLAB
COMPACT. PLACE #5 REBAR AT 12" BY 12" GRID IN BOTH DIRECTIONS.
THEN EXCAVATE 66" BELOW FINISHED FLOOR. PLACE 6" OF CA6 AND
18.THE EXISTING FLOOR WILL NEED TO BE SAW CUT AND REMOVED.
RIA REPRESENTATIVE BOB MCCLURE IMMEDIATELY.
SPECIFICATIONS, SHALL BE BROUGHT TO THE ATTENTION OF
16. ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS AND
QUALIFIED WORKMENT.
WORK SHALL BE PERFORMED BY COMPETENT, EXPERIENCED,
CONSTRUCTION (AISC) STANDARDS AND SPECIFICATIONS. ALL
SHALL COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL
15. FABRICATION AND INSTALLATION OF STRUCTURAL STEEL
AND INTO FORMS.
IS WORKED AROUND REINFORCING AND OTHER EMBEDDED ITEMS
EQUIPMENT WITH HAND RODDING AND TAMPING SO THAT CONCRETE
14. CONSOLIDATE PLACED CONCRETE USING MECHANICAL VIBRATING
EXISTING CONCRETE.
MINIMUM OF 6" INTO THE VERTICAL FACE OF THE
IN EACH DIRECTION. DOWELS WILL BE DRILLED A
TOP OR BOTTOM SURFACE AND HAVE A MINUMUM OF 2 RODS
SPACING. REBAR SHOULD BE A MIN OF 3" AWAY FROM
13. DOUBLE TIED LAYER OF #4 REBAR (1/2"), 12" X-W
FOR EQUIPMENT / TRUCKS GOING IN AND OUT OF BLDG.
12. CONTRACTOR WILL PROVIDE SPOTTER / GROUND MAN
CONTRACTOR SHALL PROVIDE AND PLACE THE BARRICADES
11. BARRICADES WILL BE POSITIONED 6' FROM EACH SIDE OF THE WORK AREA.
DUST DURING ENTIRE CONSTRUCTION.
1. THE CONTRACTOR WILL USE WATER TO ELIMINATE
CONSTRUCTION.
FLOOR OR THE UNDERLYING SOIL CAUSED BY THE
3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO
WITH LOCAL REGULATIONS.
BLOCKS, CONCRETE AND REBAR OFF RIA IN ACCORDANCE
AS BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD
4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH
CONVERTER ON ALL DIESEL ENGINES.
*CONTRACTOR SHALL HAVE CATALYTIC*
EQUIPMENT USED ARE GAS ENGINES.
5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE. IF
AFTER COMPLETION OF THE PROJECT.
7. THE CONTRACTOR SHALL CLEANUP THE WORKSITE
A MIN. 5000 PSI.
6. NEW CONCRETE FOR MACHINE FOUNDATION SHALL BE
JOINT SEALANT SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.
1/2" RIGID FOAM INSULATION FOR VIBRATION ISOLATION.
AFTER CLEANUP IS COMPLETE, LINE FOUNDATION WITH
8. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL.
WITH SAW CUTS.
REBAR WILL BE PRESENT AND MUST BE CUT OFF EVEN
2. WHEN SAW CUTTING FLOOR AROUND WORK AREA,
WILL BE DAY SHIFT WORK.
*POURING OF NEW CONCRETE,FRAMING, TYING OF REBAR
2:30 PM AND 11:00 PM OR SATURDAYS.
9. JACK HAMMERING / REMOVAL WILL BE DONE BETWEEN THE TIMES OF
OR TRUCK AGITATORS SHALL BE ACCORDING TO THE FOLLOWING:
THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS
WORKABLE CONDITION. SATISFACTORY FOR PLACEMENT IN THE WORK.
SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC AND
10. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATORS
208B ULTRA SONIC PIT
bradley.niles Text Box
PLANT ENGINEERING
B. NILES
JMTC CONCRETE PROJECTS
SHEET- 3 OF 6
SECURITY NOTES
R. MCCLURE
02-24-26
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
TARA-LGC
The RAMP program is discussed in the RIA-JMTC AT training.
Department.
Contractors will comply with any instructions given by the Rock Island Arsenal Police installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc.).
Contractor personnel working on Rock Island Arsenal are subject to participation in change.
The COR will keep the contractors informed on the current FPCON or any possible FPCON
The FPCON descriptions will be provided in the RIA-JMTC AT training.
threat. Services will resume when FPCON level is reduced to level Bravo or lower.
During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher iWATCH program. The iWATCH training will be provided in the RIA-JMTC AT training.
The Contractor and all associated subcontractors shall brief all employees on the local support of any future contract.
Contractors who routinely fail to return these items will not be issued them in placed in a drop box at a RIA-JMTC access point.
within 24 hours of no longer being needed. Items will returned to the COR or
RIA-JMTC electronic keys and access passes are accountable items and will be returned contractor5#32s employment.
IF00015 IF00015 at the end of the contract or the last day of an individual
Cards, installation badges, and/or access passes. Use FAR 52.204-9 or PADDS Clause
Contractor will acquire and need to return all issued U.S. Government Common Access thru the RIA Directorate of Emergency Services.
will provide guidance to complete the Access Control Records Check request Form security policies and procedures (provided by government representative). The COR
(Army Directive 2014-05/AR 190-13), applicable installation, facility access and local identification Index (NCIC-III) and Terrorist Screening Database (TSDB) standards and procedures using the National Crime Information Center interstate
Contractor and all associated subcontractor employees shall comply with adjudication training will be provided in the RIA-JMTC AT training.
all employees on the local iWATCH program. The iWATCH
The Contractor and all associated subcontractors shall brief be issued them in support of any future contract.
Contractors who routinely fail to return these items will not box at a RIA-JMTC access point.
needed. Items will returned to the COR or placed in a drop items and will be returned within 24 hours of no longer being
RIA-JMTC electronic keys and access passes are accountable individual contractor�s employment.
IF00015 at the end of the contract or the last day of an access passes. Use FAR 52.204-9 or PADDS Clause IF00015 Government Common Access Cards, installation badges, and/or Contractor will acquire and need to return all issued U.S.
Form thru the RIA Directorate of Emergency Services.
guidance to complete the Access Control Records Check request (provided by government representative). The COR will provide facility access and local security policies and procedures Directive 2014-05/AR 190-13), applicable installation, Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army National Crime Information Center interstate identification comply with adjudication standards and procedures using the Contractor and all associated subcontractor employees shall require changes in contractor security matters or processes.
individual facility or installation change, the Government may contract, should the Force Protection Condition (FPCON) at any changes otherwise authorized by the change clause of this directed by DoD, HQDA, and/or local policy. In addition to the Personal Identity Verification of Contractor Personnel) as identity verification requirements (FAR clause 52.204-9, The contractor workforce must comply with all personal the installation Director of Emergency Services.
to meet installation access requirements to be accomplished by shall provide all information required for background checks The contractor and all associated subcontractors employees access pass being issued.
Operations Center prior to a RIA-JMTC electronic keys and contractor employee and subcontractor employee to the RIA-JMTC The contractor shall sign a Memorandum of Record for each completed.
Level I awareness training and assuring the training is training. The COR will be provided a copy of the RIA-JMTC AT controlled access areas shall complete AT Level I awareness requiring access to Army installations, facilities, or All contractor employees,including subcontractor employees, SECURITY NOTES
208B ULTRA SONIC PIT
bradley.niles
9.16 18.06
27.25 9.27
14.17
10.78
2.87
2.16
W O
M E N
B
M E N
B
M E N
B
B208-B-J3
B208-B-H3
B208-B-D11
B208-B-D11B
BURR POLISHING
RECOIL MACHINING
31925
VIDMAR
SHELFSHELF
14872
BENCH
A/C
STEEL TABLE
DIP TANK
R A
G S
T O
R A
G E
CART
TOP OF RAIL 10'
APPROX 18'
BEAM LENGTH
PIPE
CONDENSATE
6"EAST OF
END OF BEAM
30689
30697
29689
30507 28612
33781
VIDMAR
SHELFSHELF
30411
14872
S T
A N
L E
Y
V
ID
M A
R
S T
A N
L E
Y
V
ID
M A
R
S T
A N
L E
Y
V
ID
M A
R
17,700 SQ.FT.
10"D
25997
28340
SURFACE FURANCE
LEAD POURING HOOD
18095
ENGRAVER
BENCH
HOUSE WATER
UP
U P
A
B
C
D
E
F
G
H
J
1 2 3 4
6 7 8 9
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
208B ULTRA SONIC PIT
PROJECT LOCATION
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
B. NILES SHEET- 4 OF 6R. MCCLURE
02-24-26
TARA-LGC
LOCATION IN BLDG 208 BASEMENT
208B ULTRA SONIC PIT
bradley.niles
6"-8" EXISTING FOUNDATION
8"-12" EXISTING CONCRETE
8" THICK PIT WALL - 4'DEEP
4' DEEP4'
8"
8"
6"
66"
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
B. NILES
LAYOUT DRAWING
SHEET- 5 OF 6R. MCCLURE
02-24-26
208B ULTRA SONIC PIT
TARA-LGC
208B ULTRA SONIC PIT
RECESSED 3" BY 3" GALVANIZED ANGLE TO RECIEVE METAL GRATES
1/2" EXPANSION BOARD
bradley.niles
PLANT ENGINEERING
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
B. NILES
DEMOLITION PLAN/FLOOR CUT PLAN
SHEET- 6 OF 6R. MCCLURE
02/24/26
208B ULTRA SONIC PIT
208B ULTRA SONIC PIT
TARA-LGC
EXISTING SLAB CUT DESCRIPTION
66 INCHES
168 INCHES
bradley.niles
CONCRETE BLOCK WALL CONCRETE BLOCK WALL
NEW OVERHEAD DOOR OPENINGEXISTING OVERHEAD DOOR OPENING
DOOR.
NEW INSULATED POWERED ROLL-UP OVERHEAD
3) CONTRACTOR SHALL PROVIDE AND INSTALL A
THE EXISTING PEDESTRIAN DOOR.
DIMENSIONS. NOTE EXPANDING UP AND AWAY FROM
IN THE EXISTING CONCRETE BLOCK WALL TO THE NEW
2) CONTRACTOR SHALL EXPAND THE DOOR OPENING
DISPOSE OF THE DOOR
OVERHEAD DOOR LEADING INTO THE ROOM AND
1) CONTRACTOR SHALL REMOVE THE EXISTING MANUAL
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
B. NILES
OVERHEAD DOOR MODIFICATION
SHEET- 7 OF 7R. MCCLURE
02-24-26
208B ULTRA SONIC PIT
TARA-LGC
208B ULTRA SONIC PIT