Attachment 0002 - 25-1-05 Quality Assurance Surveillance Plan.xls
XLS spreadsheet 42 KB Posted
- Attached to
- Concrete Mounting Pads Rock Island Arsenal
- Solicitation number
- W519TC26QA155
About this file
This is a Quality Assurance Surveillance Plan (QASP) in spreadsheet format for the Concrete Mounting Pads project at Rock Island Arsenal. The document serves as a template and monitoring tool for evaluating contractor performance against specified quality standards and requirements throughout the contract execution period. It establishes the framework for Government inspection, testing, and acceptance activities to ensure the contractor meets all technical specifications, schedule commitments, and regulatory compliance obligations related to the concrete mounting pad construction project.
The QASP outlines surveillance methodology by defining performance metrics, inspection points, acceptance criteria, and Government roles and responsibilities. It specifies what quality attributes will be measured (such as concrete strength, dimensions, surface finish, and placement accuracy), when inspections will occur (at various construction phases from material verification through final completion), and who will conduct the surveillance activities. The plan ensures Government oversight of deliverables and provides a systematic approach to documenting compliance or identifying deficiencies that require corrective action before final acceptance and payment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP
| Task | Contract Reference | Frequency | Performance Standard | Acceptable Quality Level | Surveilance Method | Surveilance Date(s) | Performance Level | Notes |
| Site Conference | Sheet 1 - Security Notes | Once | Each individual working at the site must receive this information for safety and accountability purposes. May be updated if additional personnel come to the work site. May be performed as part of the badging process. | 100% | Visual/Roster | |||
| Work Roster | Sheet 1 - Security Notes | Daily | Must be maintained for safety and security purposes. Must show who is at the work-site at any given time. | 90% | Written Roster | |||
| Project Timeline | Dictated by contract | Once | To be provided within 1-week of award of the contract. Must show plan for completion prior to the date stated in the contract. May be adjusted during performance provided within project completion date. | 100% | Visual/Written | |||
| Site Inspection | Sheet 1 - Security Notes | Daily | Observe work is being performed safely and in accordance with the contractor provided timeline and IAW the contracted Scope of Work | 90% | Visual | |||
| Materials Inspections | Sheet 1 - Notes 1-17 | Random | Materials provided by the contractor may be inspected to ensure that they meet the contracted Scope of Work and minimum industry and design standards. (e.g. slump or temperature tests of incoming concrete) | 100% | Visual/ Measurement | |||
| Final Inspection | Sheet 1 - Notes 1-17 | Once | Verify that all work is completed IAW the contracted Scope of Work | 100% | Visual |
&LRock Island Arsenal Quality Assurance Surveillance Plan&CConcrete Work (Concrete Mounting Pads)&RTARA-LGC-25-1-05 DATE: 31-Mar-26