B08 W519TC25Q2267 AMENDMENT 10 TO POST.pdf

PDF 163 KB Posted

Attached to
ROLL BENDER
Solicitation number
W519TC25Q2267
Issued by

About this file

This document is a Solicitation Amendment (Amendment 10) for Solicitation No. W519TC25P2267 issued by Army Contracting Command - Rock Island. The amendment makes two key changes: 1) modifying the Technical Evaluation Requirement by removing the need to submit the entire RIPD (Requirement Identification and Performance Document) with every paragraph, and instead allowing contractors to submit a comply/non-comply response with explanations for any non-compliant areas, and 2) extending the solicitation closing date to 18 Nov 2025 at 10am CT.

Contractors are required to submit a complete technical package including comply/non-comply statements, equipment brochures, manufacturer details, model information, country of origin, past performance references, and warranty information. Only contractors who submit all required documents and receive a technically acceptable rating will be considered for further price evaluation. Previous submissions will not be considered, and a new submission package is mandatory. All amendments must be acknowledged with the submission package.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CON1RA�TID CODE I PAGE OF PAGES 1 I 3 3. EFFECTIVE DATE 4. REQUISillON/PURCHASE REQ. NO. 15. PROJECTNO.(Ifapplicable)

12-Nov-2025

2. AMENDMENT/MODIFICATION NO.

U0010

6.ISSUEDBY CODE VV519TC 7. ADMINISTERED BY (Ifother than item6) CODE I

ARMY CONTRACTING COMMAND - ROCK ISLAND

See Item 6 ll5 RODMAN AVE

ROCK ISLAND IL 61299

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Cmmty, State and Zip Code) X

9A. AMENDMENT OF SOLICITATION NO.

VV519TC25P2267

X

9B. DATED (SEE ITEM 11)

22-Apr-2025 l0A. MOD. OF CONTRACT/ORDER NO.

l0B. DATED (SEE ITEM 13)

CODE IFACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS�The above nuni>ered solicitation is ammded as set li,rth in Item 14. The hour and date specified fur receipt ofO:lli,r 0 is extended, □ is not extended.

O:lli,r nnst acknowledge receipt of this ammdmmt prior to the hour and date specified in the solicitation or as ammded by one ofthe i>llowing mothods: (a) By col1J)leting Item, 8 and 15, and returning 1 copies of the ammdmmt; (b) By acknowledging receipt of this ammdmmt on each copy of the o:lli,r submitted; or(c)By separate letter or telegramwhichincludes areJi:rence to the solicitation and ammdmmt nuni>ers. FAILURE OF YOUR ACKNOWLEDGMENTTO BE RECEIVED AT 1HE PLACE DESIGN A TED FOR 1HE RECEIPT OF OFFERS PRIOR TO 1HE HOUR AND DA TE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER Ifby virtue of this ammdmmt you desire to change an o:lli,r already subn:itted, such change may be 1111de by telegram or letter, provided each telegram or letter !lllkes rei:rence to the solicitation and this ammdmmt, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (Ifrequired)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS"ORDERS.

IT MODIFIES THE CONTRACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (�ecify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM l0A.

B. THE ABOVE NUMBERED CONTRACT /ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (�ecify type of modification and authority)

E. IMPORT ANT: Contractor D is not, □ is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract sul:!ject matter \\here feasible.)

SEE SUMIIIARY OF OiAI\IGES.

Except as provided herein, all temJ! and conditions of the docum,nt rei:renced in Item9A or I 0A, as heretofure changed, rermins unchanged and in full furce and elli,ct.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEl EMAIL

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED ST ATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

W519TC25P2267

Page 2 of3

SOLICITATION AMENDMENT 10

The purpose of this Solicitation Amendment 10 is to:

1. Remove the Technical Evaluation Requirement to submit the entire RIPD with each and every paragraph including comply/non-comply and replacing it with the contractor submitting a response to if they comply/non-comply to the RIPD document. In the event that the contractor indicates a non-comply, the contractor should supply an explanation of the non-comply statement that the technical team will evaluation to determine acceptability.

2. Extend the closing date of the solicitation to 18 Nov 2025 at 10am CT.

3. All other terms and conditions remain unchanged.

W519TC25P2267

Page 3 of3

**PLEASE NOTE: ALL TECHNICAL REQUIREMENTS MUST BE SUBMITTED WITH THE QUOTE

PACKAGE FOR THE TECHNICAL TEAM TO REVIEW (I.E. COMPLY/NON-COMPLY STATEMENT,

EQUIPMENT BROCHURE, EQUIPMENT MANUFACTURER, MODEL, AND COUNTRY OF ORIGIN,

PAST PERFORMANCE TO INCLUDE REFERENCES, AND WARRANTY INFORMATION)

AS A REMINDER, ONLY THOSE CONTRACTORS WHO SUBMIT ALL REQUIRED DOCUMENTS

AND RECEIVED A TECHNICALLY ACCEPT ABLE RA TING WILL CONTINUE TO BE REVIEWED

FOR THE PRICE TO DETERMINE THE LOWEST TECHNICALLY ACCEPTABLE SUBMISSION.

IN ADDITION, ALL AMENDMENTS NEED TO BE ACKNOWLEDGED WITH YOUR SUBMISSION

PACKAGE.

IF YOU PREVIOUSLY SUBMITTED A PACKAGE FOR CONSIDERATION, A NEW PACKAGE IS

REQUIRED TO BE SUBMITTED WITH ALL REQUIRED DOCUMENTS TO BE CONSIDERED GOING

FORWARD. PREVIOUS SUBMISSION WILL NOT BE CONSIDERED.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 28-0ct-2025 10:00 AM to 18-NOV-2025 10:00 AM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .