This solicitation requests proposals for the manufacture of Ammunition Peculiar Equipment (APE) 1236 and 1400 Deactivation Furnace Retorts. The Army Contracting Command Rock Island Arsenal seeks to award up to two Indefinite Delivery-Indefinite Quantity contracts for a five-year period to supply APE 1236 thick and thin-walled retorts and APE 1400 retorts. The base year estimate is two sets of 1236 thick-walled retorts with options for additional annual quantities. Pricing should be proposed for the base year and four option years. Proposals are due by 12:00 PM on January 20, 2024 and awards will be made on a Lowest-Priced Technically Acceptable basis. The set-aside is for small businesses. Offerors must comply with all requirements in the solicitation, including past performance statements and technical drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 12:00 PM local time 20 Jan 2024
A X B X C
D
EX
X G F
H chet.a.jacks.civ@army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 68
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W519TC 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Electronic Submissions Only conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
CHET A. JACKS 309-782-4952
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 9 10 - 13
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
14 - 23 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
26 - 67
PART II - CONTRACT CLAUSES
ARMY CONTRACTING COMMAND - ROCK ISLAND
3055 RODMAN AVE
ROCK ISLAND IL 61299
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
20 Dec 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W519TC24R2007
Section A - Solicitation/Contract Form
SOLICITATION NARRATIVE
1. The current solicitation is 100% set-aside for participation by small businesses in accordance with Federal Acquisition Regulation (FAR) 6.203 and FAR Subpart 19.5.
2. The NAICS for this action is 331513.
3. The current solicitation is for Ammunition Peculiar Equipment (APE) 1236 and 1400 Deactivation Furnace Retorts requiring fabrication in accordance with the requirements of this solicitation, Purchase Description, entitled Purchase Description (PD) Fabricated Parts, APE 1236 Thick and Thin Walled retorts - APE 1400 Retort IIDIQ contract. Rev. 12-18-2023, and drawings for the 1236 and 1400 Retorts, titled 1236M2007 Rotary Kiln_Dist A and APE 1400 60 inch WP Retort_Dist A, dated 05-07-2019).
4. This solicitation is projected to result in a Firm Fixed Price (FFP), five (5) year Indefinite Delivery - Indefinite Quantity (IDIQ) type contract for the items/quantities specified; initial ordering period (OP) quantity is estimated at two (2) sets of APE 1236 thick walled retort sets for the base year with zero (0) to three (3) sets per year for the remaining four (4) OP’s. Estimated quantities for the APE 1400 retorts are: zero (0) to one (1) set for the base OP with a quantity of zero (0) to one (1) for each of the remaining four (4) OP’s.
5. The solicitation utilizes a Lowest Priced Technically Acceptable (LPTA) approach to determine technically acceptable awardees proposing the lowest prices that offer the best value to the United States Government (USG).
6. The USG intends to award up to two (2) IDIQ contracts. The USG reserves the right to make a single award if determined to be in the best interest of the USG.
7. No funds will be obligated on the basic IDIQ contract; funding will be obligated through delivery orders (DO) issued against the basic IDIQ.
8. The maximum total quantity awarded over all OP’s is expected to not exceed three (3) sets of 1236 retorts and one (1) set of 1400 retorts.
9. The guaranteed minimum will be issued concurrently with this award via DO. The minimum ordering obligation will be two (2) sets of APE 1236 thick walled retorts for a single award. In the event of a multiple award the minimum guarantee will be one (1) set of APE 1236 thick walled retorts per awardee.
The USG does not guarantee quantity in any year of the contract period apart from the guaranteed minimum ordering obligation. The USG is under no further obligation to place additional orders. Each order stands on its own insofar as it obligates the USG.
10. Proposals shall consist of the completed solicitation, W519TC-24-R-2007, including pricing area in Section B of this document, and FAR clauses appropriately completed; ALL information reflected at Section L of the solicitation for submission at time of proposal to include, but not limited to, required past experience/performance information, published data describing the equipment offered, and references as specified at Section L, technical information to include a statement of compliance with the Purchase Description requirements, i.e., “comply/non-comply” as specified, equipment identification and warranty specification, along with the offeror’s written internal quality management system procedures equivalent to ISO 9001:2015, as provided in the PD. See Section L of the solicitation for complete proposal submission requirements.
11. Offeror must quote on all items in this solicitation to be eligible for award. All items shall be awarded only as a unit.
12. Offerors are advised to carefully review the solicitation section L for describing information required at proposal submission as failure to provide all information specified may render the proposal unacceptable for further award consideration.
13. In accordance with FAR clause 52.215-1, the Government intends to award without discussions. Offerors are advised to carefully review the solicitation section L for information required at proposal submission as failure to provide all information specified may render the proposal unacceptable for further award consideration.
14. Offers predicated upon Government acceptance of the offeror’s or manufacturer’s commercial terms and conditions will be determined unacceptable and will receive no further consideration for award. The terms and conditions of this solicitation take precedence over the conduct of the acquisition.
15. As a requirement of any contract awarded as the result of the current solicitation, the contractor shall participate in a post-award meeting scheduled at an agreed upon date/time to be coordinated by the Contracting Officer/Tooele Army Depot (TEAD) Ammunition Equipment Directorate (AED)
16. Preparation for Shipment/Delivery: Adequate packing, marking, and skidding of items for shipment/delivery shall be the responsibility of the contractor.
17. Final inspection/Acceptance for invoicing purposes shall take place at the specified delivery destination in accordance with paragraph 4.3, “Shipment”, of the PD.
18. The contractor shall warranty the APE 1236 Retorts, 1400 Retorts against defects and workmanship for a period of no less than one (1) year after delivery. The warranty shall cover costs, labor, and travel/transportation expenses.
19. Shipping terms are F.O.B. Destination to the addresses reflected in the Schedule B.
20. PAYMENT: You shall utilize the WIDE AREA WORKFLOW – RECEIPT AND ACCEPTANCE SYSTEM IN ACCORDANCE WITH THE INFORMATION SHOWN BELOW. This is the Government’s electronic process for receipt and acceptance documents and contractor payment.
21. Normal working hours for TEAD are Monday through Thursday 7:00 A.M. until 5:00 P.M. All contractor personnel shall depart by 5:00 P.M. The following Federal holidays will be observed:
New Year’s Day, January 1st
Martin Luther King Day, 3rd Monday in January
President’s Day, 3rd Monday in February
Memorial Day, Last Monday in May
Juneteenth, June 19th
Independence Day, July 4th
Labor Day, 1st Monday in September
Columbus Day, 2nd Monday in October
Veteran’s Day, November 11th
Thanksgiving Day, 4th Thursday in November
Christmas Day, December 25th
If a holiday falls on Friday or Saturday, the preceding Thursday is a holiday. If a holiday falls on Sunday, the following Monday is a holiday.
22. See block nine (9) of this document for date and time of proposal submission.
23. Proposal submission shall be electronically via email only to Chet A. Jacks, email:
chet.a.jacks.civ@army.mil and Megan Frost, at email: megan.k.frost2.civ@army.mil.
24. POINT OF CONTACT: Chet A. Jacks, Contract Specialist, Army Contracting Command-Rock Island (ACC-RI), email: chet.a.jacks.civ@army.mil; or Megan Frost, Contracting Officer, email: megan.k.frost2.civ@army.mil.
Army Contracting Command – Rock Island Government Point of Contact (POC) are as follows:
Title Name Phone # E‐mail
Contract Specialist Chet A. Jacks chet.a.jacks.civ@army.mil
Contracting Officer Megan Frost 571-588-8564 megan.k.frost2.civ@army.mil
Branch Chief Marcia Larssen marcia.r.larssen.civ@army.mil
Army Contracting Command – Tooele Army Depot POCs are as follows:
Title Name Phone # E‐mail
Contracting
Officer
Brenda Alverson 435-833-2616 brenda.r.alverson.civ@army.mil
Contracting Officer Representative
Dale Roseman 435-833-5020 dale.l.roseman.civ@army.mil
Contractor Points of Contacts (POCs) are as follows:
Title Name Phone # Cell Phone # E‐mail
President
Vice President
Office Manager/Admin
Contract Administrator
Note: If any of the Contractor POC information changes, the Contractor shall submit a revised POC attachment to the Contracting Officer.
OFFEROR DUNS NUMBER: (http://fedgov.dnb.com/webform)
CAGE CODE: (http://www.dlis.dla.mil/cage_welcome.asp)
TAXPAYER ID:
UNIQUE ENTITY ID:
ACCEPTANCE PERIOD
The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date for receipt of offers, unless otherwise specified by the offeror in its proposal. This supersedes information located elsewhere in this solicitation specifying a different acceptance timeframe.
WIDE AREA WORKFLOW
To implement Defense Federal Acquisition Regulations (DFARS) 252.232-7003, “ELECTRONIC SUBMISSION OF PAYMENT REQUESTS”, TEAD uses Wide Area WorkFlow – Receipt and Acceptance (WAWF-RA) to electronically process vendor requests for payment. This application allows DoD vendors to submit and track invoices and receipt/acceptance documents electronically.
The contractor is required to use WAWF-RA when processing invoices and receiving reports under this order.
Submission of a hard copy DD250/Invoice will no longer be accepted for payment. The contractor shall register to use WAWF-RA at https://wawf.eb.mil. There is no charge to use WAWF. All questions relating to system setup and vendor training can be directed to the help desk at Ogden, UT. Their number is listed below. Web-based training for WAWF is also available at http://www.wawftraining.com, CUSTOMER SUPPORT
DISA DECC Ogden
Electronic Business Service Desk CONUS ONLY: 1-866-618-5988
COMMERCIAL: 801-605-7095
DSN: 388-7095
FAX COMMERCIAL: 801-605-7453
FAX DSN: 388-7453 CSCASSIG@CSD.DISA.MIL
THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE INVOICES THROUGH WAWF.
[ X ] Invoice and Receiving Report Combo (Supplies, OR Supplies And FFP Services) [ ] Invoice as 2-In-1 (Services Only)
If none of the above apply call 1-800-559-WAWF (9293)
Vendor Cage Code: (SF1449 – See Block 17) – (DD1155 – See Block 14) Pay DoDAAC: HQ0303
Issue Office DoDAAC: (SF1449 – See Block 9) – (DD1155 – See Block 6)
ADMIN DoDAAC: W519TC
INSPECT BY DODAAC: W67G22
SHIP TO CODE (DoDAAC): W67G22
WAWF will prompt asking for “additional e-mail submission” after click “SIGNATURE”. Enter the email addresses of the Administrative POC, to expedite the routing process of the Invoice/Receiving Report. The paying office Department of Defense Activity Address Code (DoDAAC) and mailing address will be located on the front of your award. You can track your payment information on the Defense Finance Accounting Service (DFAS) website at http://www.dod.mil.dfas/contractorpay/myinvoice.html. Your purchase order/contract number or invoice will be required to inquire about status of your payment. Questions concerning payment should be directed to the payment office identified in the contract. Please have your purchase order number and invoice ready when calling about payment status.
ANTITERRORISM/OPERATIONS SECURITY
Access and general protection/security policy and procedures. Contractor and all associated sub-contractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by Department of Defense (DOD), Headquarters Department of the Army (HQDA) and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
For contractors that do not require common access card (CAC), but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 15 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.
NON-RELEASE OF CONTRACT INFORMATION
Any proprietary, confidential commercial, trade secret or similar type of information in the contract resulting from this solicitation may not be released to anyone outside the Government.
1. Do not release proprietary, confidential commercial, trade secret or similar type of information from this contract to anyone inside the Government that does not have a legitimate need to know the information.
2. If in doubt about what information in the contract may be released, contact the Contracting Officer.
3. Criminal penalties are provided by 18 United States Code (U.S.C.) for the improper release of proprietary and/or confidential commercial information. (End of notice)
CLAUSES/SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
(FAR 52.252-1/52.252-2)
This solicitation incorporates one or more clauses and/or solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at these addresses: http://www.acquisition.gov
(End of clause/provision)
DISCLOSURE OF UNIT PRICE INFORMATION
This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23,1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the Contracting Officer is notified of your objection to such release prior to submission of initial proposals.
(End of clause)
PROMPT PAYMENT (FAR 52.232-25)
Paragraph (a)(5)(i) is included in full text for the information on the number of days for constructive acceptance.
The remainder of the clause is incorporated by reference. The full text of the entire clause can be requested from the Contracting Officer or found on the Internet at one of the following sites: http://www.acquisition.gov. THE
CONSTRUCTIVE ACCEPTANCE TIME PERIOD STATED IN THIS CLAUSE SUPERSEDES ANY OTHER
PERIOD OF CONSTRUCTIVE ACCEPTANCE THAT MAY BE STATED ELSEWHERE IN THIS
SOLICITATION/CONTRACT.
(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance shall be deemed to have occurred constructively on the 30th day (unless otherwise specified in this contract) after the Contractor delivered the supplies or performed the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision.
If actual acceptance occurs within the constructive acceptance period, the determination of an interest penalty shall be based on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
AUTHORIZED SIGNATURE
The signature on this solicitation, offer or contract should be the signature of:
(a) A Corporate Officer (President, Vice-President, Treasurer, Secretary); or,
(b) An individual authorized in writing by a Corporate Officer to bind the company to a legal document.
Section B - Supplies or Services and Prices
APE 1236 RETORT PRICING
THE OFFEROR SHALL ENTER PRICING WHERE INDICATED BELOW ACCORDING TO THE
DESIGNATED ORDERING PERIODS FOR APE 1236 RETORTS.
BASE YEAR - Award date through 365 days.
Proposed Price – Quantity Range 0 – 1sets, 1236 Thin walls: $______________each Total $______________
Proposed Price – Quantity Range 0 – 2 sets: 1236 Thick walls: $______________each Total $______________
ORDERING PERIOD 1 - End BASE YEAR through 365 days.
Proposed Price – Quantity Range 0 – 1 sets, 1236 Thin walls: $______________each Total $______________
Proposed Price – Quantity Range 0 – 3 sets: 1236 Thick walls: $______________each Total $______________
ORDERING PERIOD 2 - End Ordering Period 1 through 365 days.
Proposed Price – Quantity Range 0 – 1 sets, 1236 Thin walls: $______________each Total $______________
Proposed Price – Quantity Range 0 – 3 sets: 1236 Thick walls: $______________each Total $______________
ORDERING PERIOD 3 - End Ordering Period 2 through 365 days.
Proposed Price – Quantity Range 0 – 1 sets, 1236 Thin walls: $______________each Total $______________
Proposed Price – Quantity Range 0 – 3 sets: 1236 Thick walls: $______________each Total $______________
ORDERING PERIOD 4 - End Ordering Period 3 through 365 days.
Proposed Price – Quantity Range 0 – 1 sets, 1236 Thin walls: $______________each Total $______________
Proposed Price – Quantity Range 0 – 3 sets: 1236 Thick walls: $______________each Total $______________
FOB: Destination
PSC CD: 4430
NET AMT Thin Wall $ __________________ Thick Wall $_________________
APE 1400 RETORT PRICING
THE OFFEROR SHALL ENTER PRICING WHERE INDICATED BELOW ACCORDING TO
THE DESIGNATED ORDERING PERIODS FOR A QUANTITY RANGE FROM 0 – 1 Set, APE 1400 RETORTS.
BASE YEAR - Award date through 365 days.
Proposed Price – Quantity Range 0 - 1 sets: $______________each
ORDERING PERIOD 1 – End Base Year through 365 days.
ORDERING PERIOD 2 – End Ordering Period 1 through 365 days.
ORDERING PERIOD 3 – End Ordering Period 2 through 365 days.
ORDERING PERIOD 4 – End Ordering Period 3 through 365 days.
FOB: Destination
PSC CD: 4430
NET AMOUNT $________________________
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED
APE Retorts 1236
FFP
Manufacture APE Retorts 1236. Two sets APE Retorts 1236 thick-walled Furnace Retorts – in accordance with (IAW) Drawings titled 1236M2007 Rotary Kiln_Dist A.
Delivery to the destination shipping address specified is required 300 calendar days after award. Interested offerors are also encouraged to provide their own delivery schedules. Earlier delivery is acceptable if at no additional cost to the Government.
SHIPPING ADDRESS:
1 Tooele Army Depot Building 503 Tooele, UT 84074
Any resulting contract will have five ordering periods as follows. Delivery order pricing will be in accordance with the ordering period during which the order is issued. Base Year quantity is estimated at 0 to 2 sets 1236 thick walls, an option of 0 to 1 set 1236 thin walls, with 0 to 3 sets with thick walled and 0-1 thin-walled retorts for each of the remaining four (4) Ordering Periods thereafter.
PROJECT: APE
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED
APE Retorts 1400
FFP
Manufacture APE Retorts 1400. Two retort sets consists of 6 individual retort sections in accordance with (IAW) drawing APE 1400 60 inch WP Retort_Dist A, dated 05-07-2019).
Delivery to the destination shipping address specified is required 300 calendar days after award. Interested contractors are also encouraged to provide their own delivery schedules. Earlier delivery is acceptable if at no additional cost to the Government.
SHIPPING ADDRESS:
1 Tooele Army Depot Building 503 Tooele, UT 84074
Any resulting contract will have five ordering periods as follows. Delivery order pricing will be in accordance with the ordering period during which the order is issued. Base Year quantity is estimated at 0-1 set with 0-1 set for each of the remaining ordering periods thereafter.
Any resulting contract will have five ordering periods as follows. Delivery order pricing will be in accordance with the ordering period during which the order is issued. Base Year quantity is estimated at 0 to 2 sets with 0 to 5 sets for each of the remaining four (4) Ordering Periods thereafter.
PROJECT: APE
MAX
NET AMT
Section C - Descriptions and Specifications
DESCRIPTION AND SPECIFICATION
PURCHASE DESCRIPTION (PD)
FABRICATED PARTS
APE 1236 Thick and Thin-Walled retorts – APE 1400 Retort IDIQ contract
1 SCOPE
1.1 Scope: (PD) This Purchase Description establishes the requirements for the manufacture and supporting quality assurance documentation of manufactured items for US Army (APE) Ammunition Peculiar Equipment The contractor shall supply 2 sets of APE 1236 thick-walled retort sets (Drawings 702 V4 Rev. B and 107 V4 Rev. B) on the base year with 0 to 2 sets per year for the four option years. The APE-1236 thin-walled retort sets (Drawing 1236M20007) may 0-1 on the base year with 0-1 sets for the four option years. The APE 1400 retorts (Drawing 60-inch WP) will be 0 sets base year and 0 to 1 retort set in the 4 option years. The contractor shall build to the supplied drawings, finished retort sets shall be delivered to (TEAD) Tooele Army Depot defined in the solicitation and resulting purchase order, FOB Destination. Comply/Non-Comply
1.2 Post-Award Meeting: A post-award meeting may be conducted; Government Ammunition Equipment Directorate (AED), and contractor representatives shall attend any post-award meeting convened. Any meeting convened will be held within 45 days following contract award. The intent of this post award meeting is to conduct a drawing review and to insure the manufacturer’s understanding of performance, manufacture, and inspection requirements. Comply/Non-Comply
1.3 Classification: The APE 1236 and APE 1400 retorts supplied under any resulting purchase order shall be fabricated in accordance with the Technical Data Package (TDP) provided and this PD by a manufacturer regularly engaged in the fabrication of similar items. At submission of quotation, the offeror shall provide a capabilities statement detailing its past performance on commercial or Government contracts of similar size, scope, complexity, and dollar value for the same or similar items performed within the past three years preceding the solicitation issuance. Comply/Non-Comply
2 APPLICABLE DOCUMENTS
2.1 Government Publications: The following documents of the issue in effect on the date of request for quotation form a part of this PD to the extent specified herein.
2.2 Specifications, Standards, and Handbooks: The following specifications and standards form a part of this PD to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplements thereto, cited in the solicitation. Comply/Non-Comply
SPECIFICATIONS:
FEDERAL STANDARDS
DOD Directive 5230.25 – Control of Unclassified Technical Data OSHA 29 CFR - Occupational Safety and Health Standards
2.3 Other Government Documents and Publications: The following other Government documents form a part of this PD to the extent specified herein. All technical documentation packages (TDP) will be released to the offeror according to Distribution Statement A below. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation.
DISTRIBUTION STATEMENT A:
DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited. This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, Et. Seq.) or the Export Administration Act of 1979 as amended, Title 50, U.S.C. App. 2401 Et. Seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
DESTRUCTION NOTICE – Destroy by any method that will prevent disclosure of contents or reconstruction of the documents. Comply/Non-Comply
2.4 Non-Government Documents: The following documents form a part of this PD to the extent specified herein.
Unless otherwise specified, the issues of the documents, which are Department of Defense (DoD) adopted shall be those listed in the issue of the DoD Index of Specifications and Standards (DoDISS) specified in the solicitation.
Unless otherwise specified, the issues of documents, which are not listed in the DoDISS, shall be the issue of the Non-Government documents, which is current on the date of the solicitation.
STANDARDS:
ISO 9001: 2015 - Quality Management System
2.5 Drawings: The following drawings shall be in effect on the date of invitation for bids or request for proposal forms a part of this PD.
APE 1236 and APE 1400 Retorts
60-inch WP retort Sheets 1&2 Dated 7 May 2019 702 V4 Sheets 1-3 Dated 6 May 2019 703 V4 Sheets 1-3 Dated 6 May 2019 1236M20007 Sheets 1-2 Dated 5 January 2005 Comply/Non-Comply
2.6 Order of Precedence: In the event of a conflict between this PD and the TDP takes precedence.
2.7 Contractor Deliverables: The contractor shall fabricate 2 sets of APE-1236 Thick Walled retorts in the base year with 0 to 4 sets in the 4 option years, 0-1 sets of APE 1236 Thin walled retorts in the four option years and 0-1 sets of APE 1400 retorts in the four option years IAW the TDP and this PD. Deliverables shall exclude complete sets of retorts to D2M2, 1 Tooele Army Depot, BLDG. 503 Tooele UT. 84074-5000, prior to deliver all quality report and inspections must be submitted and TEAD Q.C. will review documents with approval within 15 days of receipt.
3 REQUIREMENTS
3.2 Materials and Construction:
3.2.1 Material: Materials not specifically designated herein or in the contract shall be of a quality commensurate with commercial practice, shall be suitable for the intended purpose in the design of the end item, shall meet the requirements specified herein, and shall be in accordance with Federal, Military, or National Technical Society, Association or Institute specifications or standards. The material supplier’s certification shall be available at Government request. Materials shall be free from defects that would adversely affect the performance or maintenance of the individual components or the overall assembly.
3.2.2 Surfaces: Cleaned surfaces shall be free from oil, grease, dirt, mill scale, rust, corrosion, and other foreign matter. The finished surface shall reflect good workmanship standards.
3.2.3 Workmanship: All castings and machined surfaces, shall be free from any defects that will reduce the capability of the requirements specified herein. Any castings, which have been repaired or modified to overcome deficiencies, shall have prior approval of the contracting officer’s representative. External surfaces shall be free from burrs, slag, sharp edges, and shall be finished to at least 3/8” ground finish.
3.3 Technical Data Package: The purchaser (Joint Munitions Command) will maintain and control the drawings, and all specification requirements. Drawings will be provided to the contractor. The solicitation will indicate the process in which contractors must follow to receive copies. “B” Size Drawings will be available at the request of the contractor. Distribution Statement A from clause 2.3 applies to all TDP provided.
Comply/Non-Comply
4. QUALITY ASSURANCE PROVISIONS
4.1 Quality Management: The contractor shall submit with its quotation its written internal quality management system procedure that is equivalent to ISO 9001: The contractor shall certify and maintain substantiating evidence that the product meets the provided drawing TDP, PD, and quality assurance requirements.
Inspection records will be maintained for each item listed in 2.5, Drawings. This includes dimensional, hardness, and welding requirements. The government technical point of contact or project manager reserves the right to witness the inspections of all components of this assembly for conformity of specifications. Fifteen days advance notice to the Government of the contractors inspection date shall be provided in order that travel arrangements can be coordinated for Government personnel attendance.
4.2 Responsibility for Inspection: The contractor shall meet all inspection requirements specified herein.
The supplier may use their own facility or any commercial facility agreeable to the government for the performance of the inspection requirements specified herein. The government reserves the right to witness or separately perform any of the inspections set forth in the TDP or this PD if such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.3 Government Inspection: Technical Staff from Ammunition Equipment Directorate, shall be invited to the location(s) of manufacture to verify inspection’s after contractor performs their fabrication and assembly inspections and before full rate production begins. Technical Staff from Ammunition Equipment Directorate shall be invited to the location(s) of manufacture for inspection prior to shipment, this inspection shall NOT constitute final inspection/acceptance of the final product. Final inspection/acceptance shall occur upon delivery of the product to the designated delivery destination. A minimum 15-day advance notice to the contracting officer representative is required for inspection prior to shipment. This inspection prior to shipment shall include a review of inspection records, material certification, and a random inspection of drawing requirements as per Tooele Ammunition Equipment Directorate. A quality conformance inspection shall be applied to the parts offered for acceptance under this purchase description.
4.4 Warranty: The contractor shall warranty the APE 1236 and APE 1400 retorts against defects and workmanship for a period of no less than one (1) year after delivery. The warranty shall cover costs, labor, and travel/transportation expenses. Components will be assembled at contractor’s site, any parts that are not compliant to the drawing specifications, shall be the contractor’s responsibility to replace or repair as per Tooele Ammunition Equipment Directorate guidance. Comply/Non-Comply
5 PREPARATION FOR SHIPMENT/DELIVERY
5.1 General: Adequate preserving of casting surfaces, skidding of retorts for shipment shall be the responsibility of the contractor.
5.3 Shipment: The contractor shall transport the components via commercial transport to Tooele Army Depot. Contractor shall contact the Contracting Officers representative who will coordinate with Technical Staff, Ammunition Equipment Directorate before shipment to have the TEAD receiving department prepared for delivery.
All retorts shall ship FOB Destination as indicated in the delivery section of the awarded purchase order. Proof of receipt shall be required for every item shipped. Proof of shipping receipts shall a Bill of Lading.
6 NOTES
6.1 Intended Use: When government drawings, specifications, or other data are used for any purpose other than in connection with definitely related Government Procurement Operations, the Unites States Government thereby incurs no responsibility or any obligation whatsoever. The fact the government may have furnished, formulated, or in any way, supplied the said drawings, specifications, or other data, is not to be regarded by implication, or otherwise in any manner licensing the holder or any other person, or corporation, or conveying any rights or permission to manufacture, use, or sell any patented invention that may be in any way related thereto.
Offeror’s response of “Non-Comply” to any of the statements in Purchase Description sections 1-6 listed above will deem the offerors’ proposal unacceptable and will receive no further consideration for award.
QASP
TOOELE ARMY DEPOT JMTE-D2M2
QUALITY ASSURANCE DATE: 20-June-2023
SURVEILLANCE PLAN
APE 1236 and APE 1400 Retort
1. Responsibilities:
• Contractor
i. The contractor shall perform per PD for the manufacture of APE 1236 and APE 1400 foundry manufacturing of Retorts.
ii. The contractor shall provide all materials, labor, and equipment necessary to perform all work.
iii. The contractor shall provide the COR with a planned timeline for project completion.
• TEAD-AED COR
i. The COR shall be the primary point of contact (POC) between the vendor and TEAD-AED
ii. The COR will refer all issues of a contracting nature to the appropriate Contracting Officer.
iii. The COR shall be responsible for contractor performance of the contract.
2. Performance Standards:
• The COR shall compare the work progress to the planned timeline provided by the contractor on a daily basis. The COR shall document progress and maintain in the record file. This will include any plans or adjustments necessary to compensate for experienced delays.
3. Acceptable Quality Level (AQL):
• Completion of the Purchase Description (PD) must be completed within 1-wk of the planned timeline.
Delays greater than 1-wk could impact TEAD-AED production schedule.
4. Evaluation Method:
• The COR shall perform a project review at the end of the project and provide records and evaluation of work compared to the AQL to the contracting officer.
This is an overarching QAP for validation of all APE 1236 and APE 1400 retorts. The cast retort has various interchangeable parts or sections. Retort sections may vary based on materials of composition, length, and thickness. Refer to the specific drawing for details on characteristics desired.
The inspection plan covers complete review and validation of attributes of the retort. All items requested and delivered will be subjected to quality inspection. Frequency and repetition of inspection points will be detailed in the specific retort drawing and agreed upon by the project manager, quality personnel, and the customer of the final product. Inspections will be noted on the in-process documentation in the sequence of production in order to minimize confusion.
In order to recognize the desired/required outcome and potential defect(s) of the product, inspectors must understand (and agree to) what is required for conformance to the specific item or application.
Inspectors should have access to all specifications identified in the contract between TEAD and the vendor in order to have a clear understanding of the expectations and specifications. Additionally, personnel assigned to perform non-destructive testing (NOT) as described below shall be qualified and certified IAW SNT-TC-1A.
Inspections will be based on:
1. Requirements and details noted in the drawings
2. Specification requirements called out
3. Customer requirements and requests
4. Pilot Model Shop Quality Assurance Procedure
The retort subcontractor must provide to TEAD evidence of an active quality management system.
TEAD will require a quality manual, or quality SOP, or an outline of the subcontractor QMS. TEAD will require all inspections that are accomplished by the subcontractor be documented, i.e. an individual inspection report for each inspection completed, detailing the requirement, the inspection procedure, and the results of the inspection performed, including any nonconformance’s and corrective action.
Parts manufactured will require a final QA inspection that may be in addition to other internal inspection criteria. Inspection criteria (and certified mill test reports, or CMTRs) for parts manufactured for TEAD will be submitted to quality assurance (QA) inspectors prior to delivery to vendor. Duplicated parts manufactured from the same drawing will follow sampling plans in accordance with MIL-STD 1916 unless otherwise specified in the inspection form (IAW
Microsoft Excel spreadsheet titled "Evaluation of Acceptance Inspection Equipment Designs").
Pre-production Meeting
Prior to beginning manufacture of the retort, the project manager will organize a pre-production meeting with all interested parties.
• Subcontractor for casting
• AED Engineering
• TEAD Quality
• Subcontractor(s) for NOT inspection
In this meeting this QAP should be reviewed. Requirements for inspection of molds used for casting the retorts, requirements for interim inspection to accomplish the inspection plan discussed. All required certifications communicated, such as Certified Material Test Reports, NOT certification of Inspectors and their inspection processes, unique NDT inspection processes and procedures required, inspection reports and Certificates of Conformance etc. This forum is the time for all to communicate their questions and concerns regarding the manufacturing of the retorts such as: casting; machining;
and inspection of the retorts. Discuss potential issues with the manufacturing and quality requirements. Discuss scheduling of inspections, packaging, and shipment to TEAD, etc.
Testing Methods and Frequency
Subcontractors performing the foundry work are required to inspect/validate/certify that the molds/tooling will perform properly during casting, and conform to drawing and contractual requirements, and provide documentation to TEAD that this step has been accomplished, also provide documentation of any issues/nonconformance’s that may have been discovered during the review.
Subcontractors performing NDT inspections on retort sections shall have a certified Level 3 to develop a certification program IAW SNT-TC-1A, act as the responsible Level 3 for producing inspection processes and work instructions, examine NDT personnel or perform any other qualification or certification Level 3 function. An outside agency may be used for these functions.
Calibrated Tooling Verification shall be performed by a certified testing facility and documented.
Calibration documents must be available for view at request of the quality inspector.
The cast retort has various configurations. Retort testing and inspection requirements are as follows:
The cast retort has various configurations. Retort testing and inspection requirements are as follows:
101) Material certification will be provided to assure material properties are within drawing specifications.
102) Visual Inspection for obvious defects
a. Cold shuts; if the discontinuity penetrates all the way through inner and outer surfaces, or through both surfaces of helix or flanges the retort will be rejected. Repairs may be made to lesser penetrations not going all the way through.
b. Cracks of any type; any crack wider than 1.5" (side to side, not length) at any point will because to reject the retort. Cracks that penetrate through both inner and outer surfaces, or through both surfaces of the helix or flanges will be cause to reject the retort. Repairs may be made to lesser cracks.
c. Pin holes/pits; greater than ¼" deep from any surface will be repaired.
d. Any repairs will be approved by AED engineers before they are made and will agree with the manufacturer regarding the suitability of the repairs or they will not be accepted.
All repairs resulting from the visual inspection will be performed prior to subsequent tests being performed.
103) Magnetic Particle (MP) Inspection
a. Inspections shall be performed IAW ASTM E1444\E1444M.
b. The subcontractor will produce and follow a retort specific MP inspection procedure and work instructions, including technique sheets for specific parts. All written procedures must be approved by a certified level 3. This unique to TEAD retort NOT inspection procedure must be submitted to TEAD for acceptance and authorization before the sub-contractor performs the related inspection.
c. All certified inspectors involved in approving or writing NOT procedures and inspection work instructions for the retorts, and who perform inspection of the retorts, must provide to TEAD a certificate of qualification for the NOT process they will be performing, and eye tests if required.
d. Inspections shall be performed in two perpendicular directions of magnetization.
e. Inspections shall cover 100 percent of the part surfaces, inside and out. Unless otherwise specified in writing by the TEAD project manager.
f. These inspections shall be conducted before shot peening or applying protective coatings.
g. MP inspection reports must include the following minimum information.
1. INSPECTED PART ID NUMBER
2. DISPOSITION OF THE EXAMINATION
3. INSPECTOR NAME AND CERTIFICATION NUMBER
4. TYPE OF INSPECTION AND DATE
5. EQUIPMENT MODEL AND SERIAL NUMBER
6. EQUIPMENT CALIBRATION DATE
7. EQUIPMENT SETTINGS
8. INDICATIONS AND THEIR LOCATION
9. RETORT (MP) INSPECTION PROCEDURE REFERENCE
NUMBER
h. Cracks, cold shuts, and any discontinuity found will be rejected but may be repaired as long as no part of the discontinuity has a gap greater than 1.5".
i. All repairable defects identified from MP testing must be repaired, retested, and be accepted before continuing to the Dimensional Inspection.
104) Dimensional Inspection
a. Dimension Inspection shall be performed IAW "AED Quality Assurance Procedure (QAP) - Pilot Model Shop" and inspection records will be generated (QA Form 20-4).
b. Each retort will be measured using hand measurement tools (dial calipers, hole gauges, radius gauges, etc.). Dimensions must be within tolerances identified on the drawings.
Non repairable dimensions will result in rejection of the retort. Repairs must be agreed upon with AED engineers and the manufacturer in the form of a written waiver or deviation.
c. Wall thickness; Ultrasonic inspection (UT) will be used to inspect wall thicknesses only, of a retort, and the inspection work instruction must conform to ASTM A609. Inspection zones shall be at 90° intervals around the outside circumference of the retorts and occur at 12-inch intervals lengthwise. Also measure the base thickness of the helix. The subcontractor will produce and follow a retort specific UT inspection procedure and work instructions, including technique sheets for specific parts. All written procedures must be approved by a certified level 3.
d. UT inspection reports must include the following minimum information.
1. PART ID NUMBER
2. DISPOSITION OF THE EXAMINATION
3. INSPECTOR NAME AND CERTIFICATION NUMBER
4. TYPE OF INSPECTION AND DATE
5. EQUIPMENT MODEL AND SERIAL NUMBER
6. EQUIPMENT CALIBRATION DATE
7. EQUIPMENT SETTINGS
8. TYPE AND SIZE OF TRANSDUCERS USED
9. INDICATIONS AND THEIR LOCATION
10. RETORT UT INSPECTION PROCEDURE REFERENCE NUMBER
The contractor shall provide reference block calibration standards (using the same material as the material being examined). Thickness values (of the reference block) shall be near the maximum and minimum values of the range of interest.
105) Optional pressure test
a. Depending on the previous inspections and repairs a pressure test may be appropriate to check for leaks through discontinuities. This test will be performed at the discretion of AED engineers. Necessary components will be fabricated by AED but actual testing should occur at the manufacturer's facility to eliminate transportation of the retorts.
b. End caps and gaskets will be designed and fabricated by AED pilot model shop.
d. End caps and gaskets will safely allow retorts to become pressure vessels up to 5 psi.
d. Once the retort is pressurized to 5 psi the outer surface will be sprayed with a soapy solution to look for bubbles indicating leaks.
e. Pin holes, cracks, and other will addressed as in previous sections of this document with appropriate repairs.
f. Areas exhibiting porosity in places greater than 1.5" across (diameter, or length or width in any direction) may be rejected unless adequate repair procedures are identified and accepted by AED engineers. It is unlikely that such defects would pass the previous tests and inspections.
106) Roll test
a. A Physical roll test shall be performed on each section to check for imbalances. This test shall be conducted by AED prior to final acceptance.
b. A level flat hard clean surface will be designated as the surface the retort sections will be roll tested on.
c. The retort will be placed on the floor and allowed to "settle". The roll test will not be started until all movement of the retort has ceased. The "settled" position of the retort section will be indicated on the face of the retort section for reference.
d. A force will be manually applied to the bolt hole furthest from the rolling surface of 20 lbs.
parallel to the rolling surface. The force should be sufficient to rotate the retort section at least 90° from its marked reference position.
e. The applied force shall be removed and the action of the retort section noted.
f. If the retort section does not rotate at least 90°, with the application of the force, then the retort section has failed the roll test.
g. If the response of the retort section with the removal of the force is a slow return to its "settled" position then the retort section has passed the roll test.
h. Weight may be added to or removed from the retort to pass the load test. Locations for added weight must not affect drawing tolerances except on wall thickness and other possible locations that must be approved by AED engineers. Methods of weight attachment must also be approved by AED engineers.
107) Final inspection will be accomplished to ensure all tests, inspections, validations, and certifications have been accomplished and documented, IAW required specifications, customer requirements and this QAP. (AED Form 13-10).
NONCONFORMING MATERIAL OR PRODUCT PROGRAM:
All nonconforming material or product will be placed on material hold. Production of product will cease if the case warrants. A documented nonconforming product process will be initiated using AED form 15-03 or AED Form 48-10 Level II CAR action as condition requires and AED Engineering will be notified within 24 hours to engage MRB (Material Review Board) action.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A N/A 0002 N/A N/A N/A N/A
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.202-1…