This technical specification outlines requirements for a multi-layer corrosion protection lining system for manhole rehabilitation. The scope of work includes surface preparation, material installation, inspection, and warranty provisions. The lining system shall consist of a polyurea adhesion coating, polyurethane surfacer layer, and final polyurea armor layer. The surfacer layer is intended to fill voids and small holes, while the armor layer shall provide a minimum of 500 mils of corrosion protection. Materials and installation methods must conform to the manufacturer's recommendations and be installed by a trained contractor. Inspection will include voltage holiday detection and thickness measurements to ensure complete coverage. The manufacturer and applicator shall warrant the system for 10 years against failure to prevent corrosion or groundwater infiltration.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 02602 – Rehabilitation of Manholes Page 1 of 6
USECTION 02602
UREHABILITATION OF MANHOLES
UPART 1 - GENERAL
1.01 Description
A. This section covers work, materials and equipment required to install a monolithic multi-layer/component concrete manhole/wetwell lining system to provide infiltration and corrosion protection.
B. This section includes procedures for surface preparation, cleaning, application and testing.
1.02 Quality Assurance
A. Coating material shall be produced in an ISO 9001 certified facility.
B. Furnish materials of quality required by ASTM standards or other approved standards and specification.
C. Coating products shall be capable of being installed and curing properly within the specified environments. Coating products shall be resistant to all forms of chemical or bacteriological attack found in municipal sanitary sewer systems and capable of adhering to the substrates and repair products.
D. Coating products must have been tested by and passed ASTM G210-13 Severe Wastewater Analysis Testing (SWAT).
E. Repair product(s) shall be fully compatible with coating product(s) including ability to bond effectively to the host substrate and coating product(s) forming a composite system.
F. Contractor shall utilize equipment for the spray application of the coating product(s) which has been approved by the coating product manufacturer; and, Contractor shall have received training on the operation and maintenance of said equipment from the coating product manufacturer.
G. Contractor shall be trained by, or have their training approved and certified by, the coating product manufacturer for the handling, mixing, application and inspection of the coating product(s) to be used as specified herein.
Section 02602 – Rehabilitation of Manholes Page 2 of 6
H. Contractor shall be trained in the use of testing or inspection instrumentation and knowledgeable of the proper use, preparation and installation of the coating products to be used as specified herein.
I. Provide guarantee against defective materials and workmanship in accordance with the requirements of these specifications.
1.03 Environmental Requirements
A. Do not apply materials when surface and ambient temperatures are outside the temperature ranges required by the Manufacturer. Do not apply the products of this Section to frozen surfaces.
B. Do not apply coatings during rain or snow, or when relative humidity is outside the humidity ranges required by the Manufacturer.
1.04 Delivery, Storage and Handling
A. Delivery and Handling: Prevent moisture damage and contamination of materials during delivery and handling.
B. Storage: Store materials in undamaged condition with seals and labels intact as packaged by the manufacturer.
1. Liquid products shall be protected from freezing while being stored.
1.05 Protection
A. Public Safety: If public safety is endangered during the progress of the rehabilitation work, provide adequate protective measures to protect public pedestrian and vehicular traffic on streets and walkways.
1. Signs, signals and barricades used shall conform to requirements of Federal, State and Local laws, rules, regulations, precautions, orders, and decrees.
B. Existing Facilities Protection: Protect existing structures from damage due to operations associated with work of this Section.
C. Personnel Protection: It is the responsibility of the Contractor to provide appropriate protective measures to ensure that chemicals are under the control of the Contractor at all times and are not available to unauthorized personnel or animals.
1.06 Definitions
Section 02602 – Rehabilitation of Manholes Page 3 of 6
A. Cleaning: Removal of sand, dirt, roots, grease and all other solid or semi-solid material from the structures as required for proper application of patching and coating products.
B. Faults: Leaking joints, cracks, breaks or other imperfections in the structure.
1.07 Warranty
A. Manufacturer and Applicator warrant the liner system against failure for a period of 10 years. "Failure” will be deemed to have occurred if the protective lining fails to prevent the internal deterioration or corrosion of the structure or prevent groundwater infiltration. If any such failure occurs within 10 years of initial completion of work on a structure, the damage will be repaired at no cost to the Owner. "Failure” does not include damage resulting from mechanical or chemical abuse or act of God.
Mechanical or chemical abuse means exposing the lined surfaces of the structure to any mechanical force or chemical substance not customarily present.
PART 2 - PRODUCTS
2.01 Materials
A. Subject to compliance with requirements, manufacturers that may be used include:
1. OBIC, LLC.
2. Approved Equal
B. Protective lining system shall be a multi-layer/component protective lining system including:
1. Polyurea Adhesion Coating
2. Polymer Surfacer Layer
3. Final Polyurea Armor Layer
C. Liner System Armor Layer shall be 100% solids, no volatile organic compound (VOC), moisture tolerant, elastomeric polyurea coating to provide infiltration and corrosion protection. Material shall be capable of curing properly given the project site conditions and temperatures conforming to the following minimum physical requirements:
Property Value Hardness, D-2240 D 48 Tensile strength, D-412 3315 psi 100% Modulus, D-412 1668 psi 200% Modulus, D-412 1960 psi 300% Modulus, D-412 2650 psi Tear resistance/DIE-C, D-624 417 pli
Section 02602 – Rehabilitation of Manholes Page 4 of 6
Ultimate elongation, D-412 395 % Taber Abrasion, mg loss CS17 15 mg loss Flexibility, 1/8” mandrel Pass ASTM G210-13 SWAT Pass
D. Liner System Surfacer Layer shall be 100% solids, no volatile organic compound (VOC), moisture tolerant, elastomeric polyurethane coating to provide infiltration and corrosion protection. Material shall be capable of curing properly given the project site conditions and temperatures conforming to the following minimum physical requirements:
Product Type Value Density (ASTM D – 1622 6-8 pcf Compressive Strength 1” 130-180 psi Closed Cell Content > 94% Water Absorption < 0.03 lbs/sqft Maximum Service Temp 180 deg Viscosity (A side) @ 72 deg F 675 cps Viscosity (B side) @ 72 deg F 200 cps S.W.A.T (ASTM G210-13) Pass
E. Manhole Frame and Cover: Frame and Cover shall be East Jordan Iron Works product No. 00104032, or approved equal.
PART 3 - EXECUTION
3.01 Surface Preparation
A. Conduct surface preparation program to include monitoring of atmosphere for hydrogen sulfide, methane, low oxygen or other gases, approved flow control equipment, and surface preparation equipment.
B. Surface preparation methods may include high pressure water cleaning, hydro blasting, abrasive blasting, grinding, detergent water cleaning and shall be suited to provide a surface compatible for installation of the liner system.
C. Surface preparation method shall produce a cleaned, abraded and sound surface with no evidence of laitance, loose concrete, brick or mortar, contaminants or debris, and shall display a surface profile suitable for application of liner system.
D. After the defects in the structure are identified, repair all leaks with a chemical or hydraulic sealant designed for use in field sealing of ground water. Severe cracks shall be “repaired with a urethane-based chemical” sealant. Product to be utilized shall be as approved by owner/engineer prior to installation. Repairs to exposed
Section 02602 – Rehabilitation of Manholes Page 5 of 6 rebar, defective pipe penetrations or inverts, etc. shall be repaired utilizing non-shrink grout or approved alternative method.
3.02 Repair Materials
A. Repair materials shall be used to fill voids, structurally reinforce and/or rebuild surfaces. Repair materials shall be compatible with the polyurethane hybrid coating and shall be applied in accordance with the manufacturer’s recommendations.
B. Subject to compliance with the polyurea coating manufacturer’s requirements, the following products shall be acceptable as compatible repair base coat materials for polyurea top coating:
1. A hydraulic cement and/or plug shall be used to stop active infiltration. The hydraulic cement and plug shall be suitable for the polyurea top coating and shall be approved by the polyurea coating manufacturer.
2. Hydrophobic and/or Hydrophilic polyurethane chemical grouts used to stop active infiltration. The chemical grouts shall be suitable for the polyurea top coating and shall be approved by the polyurea coating manufacturer.
3.03 Material Installation
A. Application procedures shall conform to recommendations of the manufacturer, including materials handling, mixing, environmental controls during application, safety and spray equipment.
B. Spray equipment shall be specifically designed to accurately ratio and apply the liner system.
C. Application of multi-layer/component liner system shall be in strict accordance with manufacturer’s recommendation. Final installation shall be a minimum of ½” (500 mils).
1. Adhesion Layer (not intended to fill small voids)
2. Surfacer Layer (intended to fill voids, bug holes)
3. Armor Layer
3.04 Inspection
A. Final liner system shall be completely free of pinholes or voids. Liner thickness shall be the minimum value as described herein.
B. Due to the fast gel and set time of the material, thickness of the application can be verified by awl point depth checks into the surfacer component and physical removal of a small area of the polyurea material. Repair of the test areas to be done immediately after the test.
Section 02602 – Rehabilitation of Manholes Page 6 of 6
C. High Voltage Holiday Detection shall be used to inspect for pinholes or breaches in the liner system installation.
D. Visual inspection shall be made by the Owner/Engineer. Any deficiencies in the finished liner system shall be marked and repaired according to the procedures set forth by Manufacturer.
E. The manhole/wetwell may be returned to full operational service after the final inspection has taken place.
F. The structure may be returned to full operation 120 minutes after the final inspection has taken place.
PART 4 – QUANTITY AND PAYMENT
4.01 Multi-Layer Corrosion Protection Lining System
A. The quantity of “Multi-Layer Corrosion Protection Lining System” will be measured in vertical feet (VF) for the actual depth of each manhole treated as described herein.
B. Payment for “Multi-Layer Corrosion Protection Lining System” will be made per vertical foot (VF), and shall include all materials, labor and equipment necessary to perform the work described herein. No additional payment will be made for replacing missing or damaged manhole steps.
END OF SECTION