Attachment 0001 Scope of Work.pdf
PDF 190 KB Posted
- Attached to
- Repair Sewer Collector Inflow and Infiltration
- Solicitation number
- W519TC-24-R-2000
About this file
This scope of work document outlines requirements for a federal contract to repair a sewer collector system at Rock Island Arsenal in Illinois. The contractor will be required to submit plans and schedules, conduct site work within 45 days of the notice to proceed, and complete all work within 120 working days. Key tasks include cutting and sealing portions of existing CIPP liner, preparing and sealing manhole surfaces, and providing daily reports, weekly meetings, and record documents. The contractor must also comply with security, environmental, emergency management, and energy conservation requirements described in the document.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW for Project# 2019-4461
1 | P a g e
Rock Island Arsenal Scope of Work
PR-2019-4461 Repair Sewer Collector I&I
05 Oct 2023
US Army Garrison-Rock Island Arsenal Directorate of Public Works
Engineering and Services Division
AMIM-RIP-G
1 Rock Island Arsenal Rock Island, IL 61299-5000
2 | P a g e
1 GENERAL INFORMATION
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
The “Contract performance” to complete construction and all close out contract work is 120 working days of the NTP (Notice to Proceed) award date.
1.2 MILESTONES OF WORK:
1.2.1 Submit a practicable schedule and quality control plant for approval within 15 working days after the NTP. The remaining pre-submittals are due within 30 after issuance of the NTP.
1.2.2 Gov’t acceptance must be given prior to commencement of construction.
1.2.3 Site work shall begin within 45 working days of NTP and will be named the
“Mobilization Date”.
1.2.4 The contractor may request the COR (Contracting Officer’s Representative) in writing for a “Winter hold” when weather will not support construction operations.
1.2.5 Flood delays:
1.2.5.1 If the river stage in Sylvan Slough is above 11ft the contractor may request a
“flood delay” in writing until the river returns and remains below the 10ft stage.
1.2.5.1.1 River stage measurements are taken from the Locks and Dam 15 tailwater gage
(https://water.weather.gov/ahps2/hydrograph.php?wfo=dvn&gage=rcki2).
1.2.5.1.2 With an approved “flood delay” the contractor shall close down work, shut all sanitary manholes, and demobilized from the site without cost to Gov’t.
1.2.5.2 The “flood delay” shall end on the fifteenth consecutive calendar day the river remains below the 10ft stage.
1.3 WORK CONDITIONS:
1.3.1 All site condition information provided by the Gov’t shall be field verified by the
Contractor before construction work. Any discovered discrepancies that need correction to prevent added Contractor Cost shall be submitted for clarification to the COR.
1.3.2 A “Staging Area” can be requested in writing from the COR for the temporary storage of construction materials and equipment.
1.3.3 Install new materials in pipe and remove materials without disturbing the environmental protective geotechnical cap material atop the adjacent hazardous landfill.
1.3.3.1 Several of the sanitary sewer manholes are surrounded by an environmentally designed cap material over an old hazardous landfill.
1.3.3.2 No digging is allowed in the geotechnical protective cap by the Contractor in performance of this repair construction.
1.3.3.3 If construction loads are anticipated to damage the turf, then provide matting prior to loading.
1.3.4 Most of the sanitary sewer manholes are in an area prone to flooding.
1.3.5 The work involves confined spaces and noxious gases.
3 | P a g e
1.3.6 Utilities: The Gov’t will furnish on Rock Island Arsenal Garrison (RIA), at no additional charge, the use of electricity and water (see section 5.4 Energy Conservation).
1.3.7 Conduct construction in a manner which minimizes downtime of sewage collection or provide a bypass system to maintain sewage flow during construction.
1.3.7.1 The sanitary system during dry periods averages about 150gpm or less.
1.3.7.2 During and after rain events the sanitary flow can easily double or triple. As an example; the average flow for the 48-hours after a 24 June 2023, 1.7 inch rain event was 300gpm. This average likely had higher flow rates within the overall duration.
1.3.8 Do not impact any other utility without prior permission obtained from the COR.
2 Appendices
2.1 APPENDIX A: SEWER MANHOLE INVENTORY
2.2 APPENDIX B: SELECT PHOTOS
2.3 APPENDIX C: SELECT 1942 MANHOLE PLANS
2.4 APPENDIX D: SPECIFICATIONS
2.5 APPENDIX E: SITE MAPS
3 BASE BID
3.1 SUMMARY
RIA is soliciting a project to reduce and stop I&I (Inflow and Infiltration) of the main sanitary collector trunk along the Sylvan Slough. Inflow to this trunk line increases significantly during flood conditions over River Stage 15ft (or elevation 557.5ft).
3.2 CONSTRUCTION AND MEASUREMENT REQUIREMENTS
3.2.1 Drawings provided by the Gov’t use an older vertical datum associated with the river.
3.2.2 For any drawing work showing elevations or plan views use GIS Projected
Coordinated System NAD1983 (North American Datum of 1983) State Plane Illinois West FIPS 1202 U.S. Feet and NAVD88 (North American Vertical Datum of 1988). (FIPS—Federal Information Processing Standard) when
4 | P a g e performing measurements and work for this project. The contractor shall provide the as-built drawings with the newer datum noted on all drawings with elevations.
3.2.3 The select drawings provided do not show the added height (added rings) and other modifications made to the sanitary manholes since the 1942 installation.
3.3 CONSTRUCTION TASKS
3.3.1 Cut and remove 8-inches to 24-inches of existing CIPP liner to create a mating edge for the installation of a properly engineer end seal(s) that is hydrophilic neoprene conforming to ASTM F3240-19 and is seamlessly constructed.
3.3.2 Perform necessary surface preparation (mechanically and chemically) to seal manholes with an approved product that is resilient to hydrosulfate attack, shall hold until substrate failure, and handle hydrostatic pressure from 30ft water head and 15ft of saturated soil loading.
3.4 PROGRESS MEETINGS, REPORTS, AND RECORD DOCUMENTS
3.4.1 Daily reports at a minimum should provide a listing of equipment on site, equipment in use, the day’s weather, a list of trades employed on site and photographs documenting the work being accomplished with orientating building(s) or structure(s) in the background, or if taken inside a clipboard with location noted included in the picture.
3.4.2 Weekly Progress meetings shall be at the scheduled with the COR. The Contractor is responsible for the establishing the agenda, arranging teleconference connection, and distributing the meeting minutes.
3.4.3 Meeting minutes shall indicate topics discussed and present a list of tasks with an assigned person (or organization) responsible for performing the task and when due. The meeting minutes shall also indicate decisions made during the meeting, and the reason the decision was needed.
3.4.4 Part of the pay application is updating schedule outlining remaining work, providing updated transmittal register, all daily reports, and photographs of the in-progress construction redlines.
4 SECURITY
4.1 OPERATIONAL SECURITY (OPSEC) REVIEW
4.1.1 In order to perform project (Repair Sewer Collector I&I) the Contractor must do the following:
4.1.2 AT Level I training.
This standard language is for Contractor employees with an area of performance within an Army controlled installation, facility or area. All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the Contracting Officer (KO), if a COR is not assigned, within 5-calendar days after completion of training by all employees and subcontractor personnel.
5 | P a g e
4.1.3 Access and general protection/security policy and procedures.
This standard language is for Contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
4.1.4 For contractors that do not require CAC, but require access to a DoD facility or installation.
Contractor and all associated sub-contractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
4.1.5 iWATCH Training.
This standard language is for Contractor employees with an area of performance within and Army controlled installation, facility or area. The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 5 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
4.1.6 For contracts that require OPSEC Training.
Per AR 530-1 Operations Security, the Contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
4.2 RIA SPECIFIC PROVISION/CLAUSE LANGUAGE
4.2.1 A non-disclosure agreement will be signed by the project prime before report/start date of contract.
4.2.2 All Training will be face to face, provided by a level II certified ATO and OPSEC officer, conducted on RIA. Any conflicts with training locations/performance will be directed by the project COR.
4.2.3 Contractors, subcontractors will be escorted by the COR in areas where they may be exposed to classified and/or sensitive materials. All Contractor employees, including subcontractor employees who are not in possession of the appropriate
6 | P a g e security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials. The Vendor will coordinate with the COR and/or the facility security office for access when required.
4.2.4 Building Stand-Off: All occupied buildings on RIA require a 40 feet stand-off by all vehicles and equipment. At no time will unoccupied vehicles, equipment or tools/tool boxes be left unattended within 40 feet of installation buildings.
4.2.5 All personnel requesting access to RIA will only enter through a manned and operational Access Control Point and present a United States National or State issued identification that is capable of being scanned for valid entry. All Contractor and Contractor employees' vehicles, equipment, and packages are subject to inspection or examination (search) at entry/exit of the RIA. Only authorized individuals that pass a screening and vetting process will be permitted access. All Contractor and subcontractor personnel will be required to submit the required identification credentials and must receive a favorable background check as conducted through the National Crime Information Center (NCIC) Interstate ID Index (III) to gain access and work on the installation.
5 ROCK ISLAND ARSENAL SUPPLEMENTAL
GUIDANCE
5.1 EMERGENCY MANAGEMENT CONTRACTOR ORGANIZATION AND
CONTRACTOR REQUIREMENTS
5.1.1 All Contractors working on RIA must comply with Department of Defense Instruction number 6055.17, "DoD Installation Emergency Management Program", Army Regulation 525-27, "The Army Emergency Management Program" and Department of Army Pamphlet 525-27, "Army Emergency Management Program". The Army Emergency Management Program serves as the single integrated emergency management program for the planning, execution, and management of response efforts (designed or intended) to mitigate the effects of an all-hazard incident, to include but not limited to, natural, manmade, and technological disasters, chemical, biological, radiological, nuclear, and high-yield explosive (CBRNE) incidents and accidents on or affecting Army installations, facilities, and/or activities.
5.1.2 Contractor Organizations:
5.1.2.1 All Contractor organizations must participate in the installation quarterly
Protection Working Group. To attend this working group, contact the Garrison DPTMS (Directorate of Plans, Training, Mobilization and Security) Plans and Operations Office.
5.1.2.1.1 Contractor organizations must comply with the installation emergency guide and Building Marshal Warden Program and write supplemental plans that describe actions to take specific to the area the Contractor organization occupies to include but not limited to shelter locations, evacuation points, communication plan and points of contact. The installation emergency guide can be used as a template for this plan. Building Marshal Warden Program Manager can be contacted through the Installation Fire Department (309) 782- 6107.
7 | P a g e
5.1.2.1.2 Contractor organizations must provide Facility Emergency Response Plans to the installation Emergency Manager for inclusion into the installation Emergency Management Plan.
5.1.2.1.3 All Contractor organizations must support the Public Health Emergency Officer policy and guidance relating to the integration of health surveillance requirements within operational/installation decision support schemes.
5.1.2.1.4 All Contractor organizations must comply with installation policies; applicable federal, state, and local laws; regulations; and Executive Orders.
5.1.2.1.5 All Contractor organizations must ensure that non-DOD HAZMAT is not stored, treated, or disposed of on the installation unless approved by the Office of the Assistant Secretary of the Army for installations, Energy and Environment, his or her designee, or higher authority.
5.1.2.1.6 All Contractor organizations must assess the long-term resource impacts of all environmental agreements in coordination with the acquisition community.
Coordinate resource implications for agreements through command channels as appropriate prior to approval.
5.1.3 Contractors:
5.1.3.1 All Contractors must comply with installation emergency procedures as defined in the installation emergency guide and facility emergency response plans. This includes compliance with all emergency communications instructions provided through official channels to include the outdoor speaker system (Giant Voice), AtHoc alert system, building notification systems (Little Voice), or Building Marshal Warden's.
5.2 FIRE PREVENTION AND SAFETY
5.2.1 The Contractor and any associated subcontractors shall as part of this contract comply with all applicable federal laws (Title 15 USC 272) pertaining to the use of technical standards that are developed or adopted by voluntary consensus bodies such as the NFPA. Current National Fire Codes are published by the National Fire Protection Association (NFPA) www.nfpa.org. Current "International" codes are published by the International Code Council (ICC) www.iccsafe.org Additional DoD mandated standards are published as Unified Facilities Criteria (UFC's) www.wbdg.org/references/pa_dod.php.
5.2.2 Fire Prevention Program. The Contractor and any subordinate subcontractor(s) shall comply with the most current edition of the RIA Program for Fire and Emergency Services referenced as the "RIAR 420-2 RIA Program for Fire and Emergency Services" and can be obtained by contacting the installation fire department at (309) 782-6107.
5.3 ENVIRONMENTAL PROTECTION
The Contractor shall follow all environmental requirements in accordance with this SOW, and the attached specifications (Appendix D).
5.3.1 Compliance with Environmental Laws and Regulations. Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-
8 | P a g e
Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the KO/COR. The Environmental Coordinator's Office will review questions on environmental compliance, and provide guidance as needed. In case of an environmental event or disaster, the Contractor shall comply with the Government's emergency services plan. All environmental protection matters shall be coordinated with the KO/COR.
5.3.2 Compliance with Green Procurement Requirements. Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.
5.3.3 Compliance with License and Certification Requirements. Contractor shall obtain all licenses and certifications required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.
5.3.4 Notification of Federal and State Regulators. Contractor shall immediately notify the Designated Government Representative (DGR) and KO/COR of the arrival on site of any Federal, State, and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from a Federal or State environmental agency.
5.3.5 Inspections of Work Sites. Any of the facilities operated by the Contractor may be inspected by the KO/COR, the RIA Environmental Coordinator, or other Regulatory Officials on a non-notice basis. Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements.
If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.
5.3.6 Reporting Noncompliance and Citations. Citations/Fines for non-compliance with environmental standards on Government facilities operated by the Contractor are a matter for resolution through the Environmental Coordinator's Office with the KO/COR and between the RIA Garrison Commander and the issuing office of Environmental Protection Agency (EPA) or State of Illinois Regulatory
9 | P a g e
Authorities. If the citations/fines are issued due to faulty operation or maintenance practices, the KO/COR shall deduct the fine from any monies due the Contractor.
5.3.7 Verification of National Environmental Policy Act Documents. NEPA review and analysis is done in accordance with 32 CFR Part 651. The NEPA process consists of evaluating the potential environmental effects of a federal action, to include actions to be taken by contractor prior to and during commencement of contract actions. The Record of Environmental Consideration (REC) has been completed and is available upon request of the COR.
5.3.8 Assignment of Environmental Compliance Designee (ECD). Contractor shall appoint an ECD for all contract work periods exceeding 180 consecutive days.
Contractor shall appoint a primary and alternate ECD for each production, shop or work area that uses and/or stores hazardous materials and/or generates hazardous wastes. Contractor ECDs shall monitor implementation of all environmental regulatory requirements, report all environmental noncompliance to the work site supervisor, correct all environmental noncompliance, and verify implementation of directed actions to correct identified environmental noncompliance. Contractor shall have at least one ECD on duty at all times at each shop or work area.
Contractor shall require all personnel designated as ECDs to complete the initial ECD training through the installation or Major Subordinate Command (MSC) environmental compliance point of contact within 15 days of the start of contract performance. Contractor personnel appointed as ECDs may perform other duties provided they do not prevent the performance of ECD duties. Contractors may request a waiver of this requirement through the KO/COR and DGR, if using and/or storing very small quantities of hazardous materials.
5.3.9 Competency Training for Contractor Personnel. Contractor shall not allow personnel to perform any activities and/or tasks on the installation without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.
5.3.10 Generation of Solid Waste. Contractor shall remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility.
5.3.10.1 Contractor shall submit a non-hazardous solid waste disposal plan identifying methods and locations for solid waste disposal, including clearing debris. The plan shall include schedules for disposal. The Contractor shall identify any Sub- Contractors responsible for the transportation and disposal of solid waste.
Licenses or permits shall be submitted for solid waste disposal sites that are not a commercial operating facility. Evidence of the disposal facilities acceptance of the solid waste shall be attached to this plan. Submit in writing the quantities of waste removed and recycled to the DGR and/or KO/COR on a monthly basis.
The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and the quantities of materials disposed/recycled by weight.
10 | P a g e
5.3.10.2 Contractor shall submit a recycling and solid waste minimization plan. The plan shall detail the Contractor's actions to comply with and to participate in Federal, State, Regional, and local government sponsored recycling programs to reduce the volume of solid waste at the source. It is the goal to recycle and/or divert 50% of the total waste stream from this project. Prior to any work, the Contractor shall submit a preliminary Non-Hazardous Construction/Demolition Debris Disposal/Diversion/Recycling Submittal form. The COR will provide the necessary form. The form shall be annotated to depict the various non-hazardous waste streams expected during the work and the anticipated recycle and/or diversion rate.
5.3.10.3 Prior to final payment, the Contractor shall submit a final Non-Hazardous Construction/Demolition Debris Disposal/Diversion/Recycling Submittal form.
Form shall be annotated to depict the actual quantities for the various non-hazardous waste streams generated during the work and the final recycle and/or diversion rates. Copies of all certified weigh-bills shall also be provided for each load of material that was disposed, diverted, or recycled.
5.3.11 Generation of Hazardous Waste. The Contractor shall follow all hazardous/special waste disposal requirements in accordance with this SOW and the design set documents. Contractor shall assign all hazardous waste management responsibilities to the appointed ECD. Contractor shall contact the DGR and/or COR to obtain technical assistance from the Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous waste storage and disposal requirements. Contractor shall properly profile all waste generated as part of this contract to determine if any waste is hazardous waste as defined by 40 CFR. Contractor shall accumulate hazardous waste prior to disposal shipment in a satellite accumulation point at or near the point of generation or in a less-than-90-day site, in accordance with Federal, State, Army, and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement or Status-of-Forces Agreement. The Contractor shall properly package the hazardous waste and complete the hazardous waste manifest, then take the manifest to DGR for approval and signature prior to removing any hazardous waste from the installation. Contractor shall contact DGR to obtain the installation’s hazardous waste EPA ID number for the hazardous waste manifest.
The Contractor shall notify the DGR 24 hours prior to removing any hazardous waste from the installation. The contractor shall remove and dispose of manifested hazardous waste generated by contract activities from the installation, to an approved off-post permitted hazardous waste disposal facility. The DGR shall assist contractors with profiling their waste upon request. All disposal procedures will be IAW Federal and State EPA regulations. A copy of any paperwork, including manifests, shall be forwarded to the KO/COR for the Environmental Coordinator’s Office, RIA.
5.3.12 Use of Hazardous Materials: Contractor shall assign all hazardous materials management responsibilities to the appointed ECD. Contractor shall contact the KO/COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements. Contractor shall submit to the
11 | P a g e
KO/COR and/or DGR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract.
Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list without prior written approval from DGR and/or KO/COR.
5.3.13 Storm Water Management Low Impact Design/Development (LID): The Contractor shall perform, track, participate, implement, and comply with Section 438 of the Energy Independence and Security Act; Executive Order 13514; and the DOA memorandum (2010) for full implementation of low impact design/development (LID) techniques to restore predevelopment hydrology to the maximum extent technically feasible for both new and renovation construction projects. In support of LID, Contractors will adhere to installation landscape codes and the guidance found in the Installation Design Guide concerning Low Impact Design/Development for storm water management. The following LID practices include, but are not limited to:
5.3.13.1 Restoring predevelopment hydrology to the maximum extent technically feasible.
5.3.13.2 Promoting natural removal of pollutants such as nutrients, oil and grease, and sediments from storm water.
5.3.13.3 Managing rainfall at the point where it falls.
5.3.14 Prevention of Storm Water Pollution. The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the National Pollutant Discharge Elimination System (NPDES) general permit requirements. Applicable permits include:
5.3.14.1 The General NPDES Permit for Storm Water Discharges from Industrial Activities (ILR00-1154).
5.3.14.1.1 Contractors will comply with the permit when the activity is identified as a permitted industrial activity. BMPs include, but are not limited to:
5.3.14.1.2 Practicing spill prevention and good housekeeping.
5.3.14.1.3 Installing and managing erosion and sediment control.
5.3.14.2 The General NPDES Permit for Storm Water Discharges from Construction Site
Activities (ILR10). The minimum control measures for construction sites include, but are not limited to:
5.3.14.2.1 Public Education and Outreach on Storm Water Impacts
5.3.14.2.2 Public Involvement and Participation
5.3.14.2.3 Illicit Discharge Detection and Elimination
5.3.14.2.4 Construction Site Storm Water Run-off Control
12 | P a g e
5.3.14.2.5 Post Construction Storm Water Management in New Development and Redevelopment
5.3.14.2.6 Contractors will obtain permit coverage for construction activities disturbing over one acre of land (total acreage is cumulative across all portions of the project). Requirements include, but are not limited to:
5.3.14.2.6.1 Preparing a Notice of Intent (NOI)
5.3.14.2.6.2 Preparing and implementing a site-specific Storm Water Pollution Prevention
Plan (SWPPP) as outlined in the permit and prior to any soil disturbance.
5.3.14.2.6.3 Prior to submission of the Notice of Intent (NOI), Stormwater Pollution
Prevention Plan (SWPPP), Notice of Termination (NOT) and associated fees to the state of Illinois, these documents must be approved by Public Works – Environmental (PW-E) through the KO/COR.
5.3.14.2.6.4 When the on-site SWPPP binder is compiled, a copy must also be submitted to PW-E for their records. Inspection reports should be submitted to PW-E through the KO/COR on a regular basis as required by the Permit.
Contractor is responsible for:
5.3.14.2.6.4.1 All associated fees
5.3.14.2.6.4.2 Installing and managing erosion and sediment control.
5.3.14.2.6.4.3 Make available, upon request, permit associated documentation.
5.3.14.2.6.4.4 Practicing spill prevention and good housekeeping.
5.3.14.2.6.4.5 Schedule inspections and provide corrective actions for noted deficiencies.
5.3.15 Protection of Work Site Resources. Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times.
Prior to site clearing and grubbing, the Contractor shall coordinate harvesting of saleable timber with the DGR and/or KO/COR. Contractor shall notify the DGR and/or KO/COR if any trees are required to be disposed or removed. The Contractor is not authorized to remove or dispose of any tree greater than 6 inches in diameter unless permission has been granted in writing by the DGR or
KO/COR.
5.3.16 Prevention of Spills: Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department).
5.3.17 Protection of Sensitive Areas. Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, foot traffic) are
13 | P a g e prohibited. The Contractor shall also adhere to the following installation sensitive areas requirements:
5.3.17.1 Cultural Resources Sites: Do not excavate, remove, damage, or otherwise deface any archeological resource located on public lands.
5.3.17.2 Endangered Species Habitats: Do not initiate any action that may disturb, endanger, or damage to any degree the habitat of a threatened or endangered species.
5.3.17.3 Wetlands: Do not excavate or take any action that could fill or damage any wetland unless working under a project specific Corps of Engineers 404 permit.
Wetlands include streams, riparian areas, bogs, marshes, and swamps.
5.3.18 Corrective Action for Noncompliance. Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the KO/COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.
5.3.19 Noise: Contractor shall make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times. Pile-driving operations shall be coordinated through the DGR and KO/COR.
5.3.20 Mercury. Mercury is prohibited, unless specified otherwise, and with the exception of mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers is prohibited. Remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition for disposal as directed. Immediately report to the DGR and KO/COR instances of breakage or mercury spillage. Clean mercury spill area to the satisfaction of the Contracting Officer. Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal.
5.3.21 Universal Waste / e-Waste Management. Universal waste including but not limited to some mercury containing building products such florescent lamps, mercury vapor lamps, high pressure sodium lamps, CRTs, batteries, aerosol paint containers, electrical equipment containing PCBs, and consumed electronic devices, shall be managed in accordance with applicable environmental law and installation instructions.
5.3.22 Pollution Prevention/Use of hazardous materials and the generation of hazardous waste. Consult with the Environmental Office for suggestions and to obtain a copy of the installation’s pollution prevention/hazardous waste minimization plan for supporting waste minimizations.
5.4 ENERGY CONSERVATION
5.4.1 Contractor shall perform this contract in an energy efficient manner to preclude waste of Government furnished utilities and fuels.
5.4.2 Conserve energy by turning off unneeded equipment and utilities.
5.4.3 Use lights only in areas where work is actually being performed.
5.4.4 Water shall be turned off after required usage has been accomplished.
14 | P a g e
5.4.5 Complying with water bans imposed by local, State, or Federal Agencies.
5.4.6 All engines in vehicles parked for more than two (2) minutes will be shut off.
5.4.7 Provide a designated representative, for each building or area permanently occupied by Contractor personnel, who may be contacted by the COR regarding unnecessary operation of lights, machinery, or heating/cooling systems.
5.4.8 Inspection Requirements. General area inspections for energy consumption deficiencies shall be granted on request. Any of the facilities operated by the Contractor may be inspected by the DPW Energy Engineer on a non-notice basis.
5.5 HAZARDOUS/SPECIAL WASTE DISPOSAL
5.5.1 Handling or disposing of hazardous or special waste generated by the Contractor in the performance of this contract, shall be submitted to the COR for the Environmental Coordinator’s Office for turn into DLA.
5.5.2 Handling or disposing of hazardous or special waste generated by the Contractor in maintenance of Contractor owned equipment shall be the responsibility of the Contractor. Contractor shall dispose of it at an approved site off RIA.
5.5.3 All disposal procedures shall be IAW Federal and State EPA regulations. A copy of any paperwork, including manifests, shall be forwarded to the COR for the Environmental Coordinator’s Office, RIA.
5.5.4 For additional requirements for Hazardous materials see paragraphs 5.3.11 and 5.3.12.