B08 W519TC24Q2368 AMENDMENT 1.pdf
PDF 356 KB Posted
- Attached to
- ELECTRIC FORKLIFT
- Solicitation number
- W519TC24Q2368
About this file
This document is an Amendment to a Solicitation for an Electric Forklift, Solicitation Number W519TC24Q2368. The amendment provides responses to three contractor questions related to the required forklift specifications, including confirmation that three-phase 480V power and either cushion or pneumatic tires are acceptable. The purpose of the amendment is to provide the contractor questions and answers to all, and states that all other terms and conditions remain unchanged. The original Solicitation is for an Electric Forklift in accordance with the RIPD E4000 24-3-10 requirements, issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A02 CDRL.pdf | ||
| B08 W519TC24Q2368.pdf | ||
| A02 RIPD E4000-24-3-10 FINAL 06122024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W519TC24Q2368
X 9B. DATED (SEE ITEM 11)
25-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jul-2024
CODE
ARMY CONTRACTING COMMAND - ROCK ISLAND
3055 RODMAN AVE
ROCK ISLAND IL 61299
W519TC 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W519TC24Q2368
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
CONTRACTOR QUESTIONS AND ANSWE
Q1. Could you please clarify the following details regarding the facilities line phase and voltage for the electric forklift?
. Line Phase: Single phase or three phase . Line Voltage: 208, 240, or 480 A1. Three Phase 480 Volt
Q2. Question: The cited forklift Toyota model THDE4000-30 is available with cushion tires only. It is not available with pneumatic tires.
However, the RIPD states the required forklift is to have pneumatic tires, not cushion tires. Please clarify this conflicting information.
A2. Cushion tires or pneumatic are fine.
Q3. We responded to a very similar request a couple weeks ago. The Toyota THDE requested is NOT approved for outdoor use. Maybe poking it's nose out a door into a lot to unload a truck in very nice weather on flat paved surfaces is doable. But certainly, no pneumatic tires will be provided (or FULL cab).
A3. We were told Toyota could provide a forklift with a cab that has a front, top, and rear glass with vinyl doors with a heater.
SOLICITATION AMENDMENT 1
The purpose of this Solicitation Amendment 1 is to:
1. Provide contractor questions and answers to all.
2. All other terms and conditions remain unchanged.
The following have been deleted:
SOLICITATION NARRATIVE
(End of Summary of Changes)
File details come from the government source that posted it. Updated .