This document contains an invitation for bid for substation repair services. The U.S. Army Contracting Command - Rock Island is seeking bids to repair two substations located at Pine Bluff Arsenal in Arkansas. Interested women-owned small businesses are invited to submit technical proposals by January 20th, 2023 and price bids by February 10th, 2023. A site visit will be held on January 4th, 2023 and contractor questions are due by January 6th. The work shall be completed in accordance with the attached scope of work. A single firm fixed price contract will be awarded. The prevailing Davis-Bacon wage determination applies to the resultant contract.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08. W519TC-23-B-2001 0001.pdf | ||
| A03. CDRL 004 - Names and Personnel Data.pdf | ||
| A03. CDRL 002 - AT Level 1 Training Certificates.pdf | ||
| A03. CDRL 005 - Contractor Manpower Reporting.pdf | ||
| Attachment 002 - Davis Bacon Wage Rate Determination.pdf | ||
| B08. W519TC-23-B-2001.pdf | ||
| A03. CDRL 006 - Submittals.pdf | ||
| Attachment 001 - Statement of Work.docx | DOCX document | |
| A03. CDRL 001 - Contractor Manpower Reporting.pdf | ||
| A03. CDRL 003 - iWatch Training Certificates.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
To answ er industries questions
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jan-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W519TC23B2001
X 9B. DATED (SEE ITEM 11)
22-Dec-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2023
CODE
ARMY CONTRACTING COMMAND - ROCK ISLAND
3055 RODMAN AVE
ROCK ISLAND IL 61299
W519TC 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W519TC23B2001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
NARRATIVE AMENDMENT 0002
1. The purpose of Amendment 0002 of solicitation W519TC23B2001 is to answer questions from the site visit. The questions and answers are as follows;
Q1. Do we need to include in our price, engineering for the most reliable point for the 3 new Voltage Regulators in Substation B? During the walk thru it was mentioned the best place might have been out on a circuit rather than inside the substation, this would require a professional load study.
A1. Cost needs to be included in the bid. This would include “engineering for the most reliable point for the 3 new Voltage Regulators in Substation B”.
Q2. Does the replacement of the first pole on the load side of Entergy’s Primary Meter Pole in substation B need to be included in our quote? The pole appeared to be in poor condition during our walk through and replacing it was mentioned, but this is not in the original quote.
A2. The first pole on the load side on Entergy’s primary meter pole needs to be replaced.
Q3. The existing 3 Phase Voltage Regulator in Substation B is a 1500 KVA, the SOW says use three 333 kva regulators, that will not have as much ampacity as the 1500 kva, just making sure this is acceptable.
A3. The contractor will utilize an engineering firm to determine the correct sizing and best location for voltage regulators to meet PBA's usage and needs. PBA will review engineering firm recommendations to determine if they are acceptable for PBA's usage and needs.
Q4. Please provide a satellite image of the Substations B and C that will be repaired.
A4. The satellite images will be provided to those who request the images
2. All other terms and conditions of this solicitation remain in effect
(End of Summary of Changes)
File details come from the government source that posted it. Updated .