Megadoors.pdf

PDF 4 MB Posted

Attached to
HI ANG Mega Door Repair B3428
Solicitation number
W50SLF24R0016
Issued by

About this file

This document appears to be a set of building plans and specifications for an F-22 Squadron Operations and Aircraft Maintenance Unit Hangar project at Hickam Air Force Base in Hawaii. The plans provide detailed drawings and construction details for the hangar facility, including structural, architectural, and electrical systems. Key elements include an upward acting fabric door system, pre-finished metal wall and roof panels, concrete floor slabs, and an access flooring system. The plans also include notes on specific construction requirements, such as insulation values, finishes, and hangar door wiring diagrams.

The related federal contract opportunity is for repair and replacement services on the Megadoor systems in Building 3428 at the Hawaii Air National Guard campus. The scope includes replacing rusted mullion chains, upgrading door switches, replacing control panel components, and assessing and repairing the overall Megadoor systems. The contract is solicited by the Department of the Army National Guard.

View the file

Other files

File Type Posted
QA Dated 20SEP24.docx DOCX document
PWS KNMD240006 Mega Door Repairs-B3428.docx DOCX document
W50SLF24R0016 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S c a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

191 1615141312111098765432 17 18

N

M

L

K

J

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

C O

P Y

R I G

H T

B

U R

N

A

D

M

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

C

HAWAII AIR NATIONAL GUARD

HICKAM AIR FORCE BASE

OAHU, HAWAII

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

52085

Project No. - KNMD069209

AUGUST 2011

09/17/10 ISSUED FOR BID0 MZ

-W9133N-04-D-0003

TFI - F-22 SQUADRON

OPERATIONS & AIRCRAFT

MAINTENANCE UNIT HANGAR

KNMD069209A-303.DWG

B. AMES

L. COLE S. PFEFFER

BUILDING SECTION G

CONTINUOUS 152x152 [6"X6"]

PRE-FINISHED METAL BOX GUTTER

CONTINUOUS 152x152 [6"X6"]

PRE-FINISHED METAL

BOX GUTTER

CMU VENEER COLUMN

EL=100'-0"

FINISH FLOOR

SECOND FLOOR SLAB

EL=116'-0"

UPWARD ACTING FABRIC

DOOR SYSTEM

SWINGING MULLION

[21'-0"]

[21'-0"]

[21'-0"]

[21'-0"]

10109

[33'-2"]

54762

[179'-8"]

123456789

[25'-8"]

[25'-0"]

P Q

EL=100'-0"

FINISH FLOOR

BUILDING SECTION-

OPTION 8 J

A-102, A-104

0.1

EAVE WP

EL=129'-10"

EAVE WP

EL=138'-1 1/2"

BUILDING SECTION-

OPTION 3 K

A-102, A-104

[15'-0"]

EAVE WP

EL=114'-6"

AG

B C D E

HANGAR FLOOR

CONCRETE SLAB SLOPED

TO APRON PAVING

CONCRETE

FLOOR SLAB

CONCRETE

FLOOR SLAB

ACCESS FLOORING

SYSTEM

SECOND FLOOR

CONCRETE SLAB

FIXED ALUMINUM SUNSHADE

SPLIT-FACED CMU

VENEER INSULATED

CMU CAVITY WALL

PRE-FINISHED STANDING SEAM

METAL ROOF OVER MIN. R-30

RIGID INSULATION OVER VAPOR

RETARDER OVER METAL

DECKING

PRE-FINISHED HORIZONTAL

INSULATED MIN. R-19 METAL

WALL PANELS

SPLIT-FACED CMU VENEER

INSULATED METAL STUD

FRAMED CAVITY WALL

BUILDING SECTION H

A-101

EL=100'-0"

FINISH FLOOR

C BDE A

CONCRETE

FLOOR SLAB

SPLIT-FACED CMU VENEER

INSULATED CMU CAVITY WALL

N

[24'-8"]

[24'-8"]

[15'-0"]

[14'-0"]

[14'-0"]

[15'-0"]

[24'-8"]

[24'-8"]

[24'-8"]

[25'-4"]

[24'-8"]

[15'-0"]

[14'-0"]

EL=100'-0"

FINISH FLOOR

EL=124'-0"

CLEAR OPENING

CONTINUOUS 152x152

[6"X6"] PRE-FINISHED

METAL BOX GUTTER

CONTINUOUS 152x152 [6"X6"]

PRE-FINISHED METAL

BOX GUTTER

CMU VENEER COLUMN

EL=100'-0"

FINISH FLOOR

SECOND FLOOR SLAB

EL=116'-0"

UPWARD ACTING FABRIC

DOOR SYSTEM

SWINGING MULLION

[21'-0"]

[21'-0"]

[21'-0"]

[21'-0"]

10109

[33'-2"]

54762

[179'-8"]

123456789

[25'-8"]

[25'-0"]

EL=100'-0"

FINISH FLOOR

0.1

EAVE WP

EL=133'-5"

EAVE WP

EL=138'-1 1/2"

[15'-0"]

EAVE WP

EL=114'-6"

HANGAR FLOOR

CONCRETE SLAB SLOPED

TO APRON PAVING

CONCRETE

FLOOR SLAB

CONCRETE

FLOOR SLAB

ACCESS FLOORING

SYSTEM

SECOND FLOOR

CONCRETE SLAB

FIXED ALUMINUM

SUNSHADE

SPLIT-FACED CMU VENEER

INSULATED METAL STUD

FRAMED CAVITY WALL

A-101, A-102 A-103, A-104

A B C D E F G H J K

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR

BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR

BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

PRE-FINISHED STANDING

SEAM METAL ROOF OVER

VAPOR BARRIER OVER MIN.

R-30 RIGID INSULATION

OVER METAL DECKING

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR

BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR

BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

PRE-FINISHED STANDING

SEAM METAL ROOF OVER

VAPOR BARRIER OVER MIN.

R-30 RIGID INSULATION

OVER METAL DECKING

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR

BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

UPWARD ACTING FABRIC

DOOR SYSTEM

CONTINUOUS METAL PANEL

DRAFT CURTAIN, ROOF DECK

TO BOTTOM OF TRUSS @

COLUMN ROWS D & G

CONTINUOUS METAL PANEL

DRAFT CURTAIN, ROOF DECK

TO BOTTOM OF TRUSS @

COLUMN ROWS D & G

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

ALUMINUM STOREFRONT SYSTEM W/ 25 [1"] INSULATED

LOW-E TINTED GLASS WITH 6 [1/4"] LAMINATED INNER

PANE PER UFC 4-010-01, TYP. ALL EXTERIOR LOCATIONS

ALUMINUM CURTAIN WALL SYSTEM W/ 25 [1"] INSULATED

LOW-E TINTED GLASS WITH 6 [1/4"] LAMINATED INNER

PANE PER UFC 4-010-01, TYP. ALL EXTERIOR LOCATIONS

T

AP

C

X

SCHEDULE OF

METRIC EQUIV. ELEVATIONS

FEET - INCHES MILLIMETERS

100'-0" 30480 mm

113'-4" 34542 mm

116'-0" 35357 mm

138'-1" 42088 mm

114'-6" 34900 mm

129'-10" 39574 mm

138'-1 1/2" 42101 mm

124'-0" 37795 mm

99'-0" 30175 mm

136'-6" 41605 mm

124'-4" 37896 mm

134'-0" 40843 mm

AH

A-518

A-108 A-109

A-111

A-109, A-111

06/01/11

ISSUED FOR

CONSTRUCTION MZ

05/22/121 RFI #140 MZ

nbrown Line nbrown Line nbrown Line nbrown Line nbrown Line nbrown Text Box F-22 Height = 16.67' at tail RFI 206 nbrown Text Box Minimum clearance = 7'-0" per UFC 3-260-01 Table 8-2 RFI 206 nbrown Cross-Out nbrown Text Box Minimum CLR OPENING = 124'-4" RFI 206 nbrown Line nbrown Line dkuntz Text Box Include additional interior framing to cover interior metal wall panels along GL 9 only per RFI 327 a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

191 1615141312111098765432 17 18

N

M

L

K

J

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing fileC O

P Y

R

IG

B U

R N

S A

N D

M cD

O N

N E

LL

E

N G

IN

E

E R

IN

G

C O

M P

A N

Y , I

N C

C

HAWAII AIR NATIONAL GUARD

HICKAM AIR FORCE BASE

OAHU, HAWAII

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

52085

Project No. - KNMD069209

JUNE 2011

09/17/10 ISSUED FOR BID0 MZ

W9133N-04-D-0003

TFI - F-22 SQUADRON

OPERATIONS & AIRCRAFT

KNMD069209A-304.DWG

BUILDING SECTION-

OPTION 3 L

A-102, A-104

BUILDING SECTION-

OPTION 3 M

A-102, A-104

EL=100'-0"

FINISH FLOOR

SECOND FLOOR SLAB

EL=116'-0"

EL=100'-0"

FINISH FLOOR

EAVE WP

EL=129'-10"

CONTINUOUS 152x152 [6"X6"]

PRE-FINISHED METAL

BOX GUTTER

UPWARD ACTING FABRIC

DOOR SYSTEM

SWINGING MULLION

CONTINUOUS 152x152 [6"X6"]

PRE-FINISHED METAL BOX GUTTER

56789

10109 [33'-2"]

54762 [179'-8"]

[25'-8"]

[25'-0"]

EAVE WP

EL=138'-1 1/2"

C BDEFGHJ AK

EL=100'-0"

FINISH FLOOR

EAVE WP

EL=114'-6"

A

CONTINUOUS 152x152 [6"X6"]

PRE-FINISHED METAL BOX GUTTER

EAVE WP

EL=129'-6"

EAVE WP

EL=114'-6"

A

B J

K

R

SPLIT-FACED CMU

VENEER INSULATED

CMU CAVITY WALL

CONTINUOUS 152x152 [6"X6"]

PRE-FINISHED METAL

BOX GUTTER

CONCRETE

FLOOR SLAB

HANGAR FLOOR

CONCRETE SLAB SLOPED

TO APRON PAVING

CONCRETE

FLOOR SLAB

CONCRETE

FLOOR SLAB

SPLIT-FACED CMU

VENEER INSULATED

CMU CAVITY WALL

SPLIT-FACED CMU

VENEER INSULATED

CMU CAVITY WALL

SPLIT-FACED CMU

VENEER INSULATED

CMU CAVITY WALL

[15'-0"]

[24'-8"]

[24'-8"]

[25'-4"]

[24'-8"]

[24'-8"]

[15'-0"]

[14'-0"]

[14'-0"]

BUILDING SECTION N

A-302, A-419

BUILDING SECTION P

A-302, A-307

3 2 2 3

12802 [42'-0"]

12802 [42'-0"]

U V

EL=100'-0"

FINISH FLOOR

SECOND FLOOR SLAB

EL=116'-0"

CONCRETE

FLOOR SLAB

CONCRETE

FLOOR SLAB

CONTINUOUS 152x152

[6"X6"] PRE-FINISHED

METAL BOX GUTTER

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR

BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR

BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR

BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR

BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR

BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

1000 LB TROLLEY HOIST

SEE STRUCTURAL FOR

DETAILS

[1 4'

-0

SCHEDULE OF

METRIC EQUIV. ELEVATIONS

FEET - INCHES MILLIMETERS

100'-0" 30480 mm 113'-4" 34542 mm

116'-0" 35357 mm

138'-1" 42088 mm

114'-6" 34900 mm

129'-10" 39574 mm

138'-1 1/2" 42101 mm

124'-0" 37795 mm

99'-0" 30175 mm

136'-6" 41605 mm

124'-4" 37896 mm

134'-0" 40843 mm

ACCESS FLOORING

SYSTEM

52 [1"] STUCCO OVER WIRE MESH OVER #15

ASPHALT FELT OVER 16 [5/8"] EXTERIOR

GYPSUM SOFFIT SHEATHING ATTACHED TO

22 [7/8"] HAT CHANNELS @ 406 [1'-4"] O.C.

ATTACHED TO 1000S200-43 METAL STUD

FRAMING @ 406 [1'-4"] O.C.

ALUMINUM STOREFRONT

SYSTEM W/ 25 [1"] INSULATED

TINTED GLASS WITH 6 [1/4"]

LAMINATED INNER PANE PER

UFC 4-010-01

STAINLESS STEEL TUBE, 76 [3"]

DIA., RAILING AND MOUNTING

FLANGES ANCHORED STEEL

TUBE, SEE STRUCUTRAL DWGS.

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

PAVER TILES AND PEDESTALS OVER FILTER

FABRIC OVER 60PSI RIGID INSULATION (R-10 MIN.

OVER 2 LAYERS OF MEMBRANE WATERPROOFING

(EXTEND UP AND OVER CONCRETE CURBS TO

TERMINATION BAR AND SEAL) OVER SLOPING (3

PER 305[1/8" PER 12"] LIGHT WEIGHT CONCRETE

TOPPING OVER STRUCTURAL CONCRETE SLAB,

SEE SHEET A-419 FOR DETAILS

BUILDING SECTION Q

A-111

Y

E F

[25'-4"]

CONCRETE

FLOOR SLAB

CONTINUOUS 152x152

[6"X6"] PRE-FINISHED

METAL BOX GUTTER

PRE-FINISHED STANDING SEAM METAL ROOF

OVER VAPOR BARRIER OVER MIN. R-30 RIGID

INSULATION OVER METAL DECKING

ACCESS FLOORING

SYSTEM

ALUMINUM STOREFRONT

SYSTEM W/ 25 [1"] INSULATED

TINTED GLASS WITH 6 [1/4"]

LAMINATED INNER PANE PER

UFC 4-010-01

PRE-FINISHED

HORIZONTAL INSULATED

(MIN. R-19) METAL WALL

PANEL SYSTEM

EL=100'-0"

FINISH FLOOR

SECOND FLOOR SLAB

EL=114'-6"

EAVE WP

PRE-FINISHED STANDING SEAM

METAL ROOF OVER VAPOR BARRIER

OVER MIN. R-30 RIGID INSULATION

OVER METAL DECKING

A-111

A-111

PRE-FINISHED HORIZONTAL

INSULATED (MIN. R-12)

METAL WALL PANEL SYSTEM

ATTACHED TO STRUCTURAL

FASCIA AS REQUIRED

A-419

06/01/11

ISSUED FOR

CONSTRUCTION MZ

a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

191 1615141312111098765432 17 18

N

M

L

K

J

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing fileC O

P Y

R

IG

B U

R N

S A

N D

M cD

O N

N E

LL

E

N G

IN

E

E R

IN

G

C O

M P

A N

Y , I

N C

C

HAWAII AIR NATIONAL GUARD

HICKAM AIR FORCE BASE

OAHU, HAWAII

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

52085

Project No. - KNMD069209

JUNE 2011

09/17/10 ISSUED FOR BID0 MZ

W9133N-04-D-0003

TFI - F-22 SQUADRON

OPERATIONS & AIRCRAFT

KNMD069209A-508.DWG

GENERAL NOTES:

(*) DOOR DIMENSIONS TO BE DETERMINED BY

VERTICAL LIFT FABRIC DOOR MANUFACTURER.

1.

DETAIL 2

A-108

METAL TUBE MULLION

AND VERTICAL LIFT

FABRIC DOOR GUIDE

BY VERTICAL LIFT

FABRIC DOOR MANUF.

VERTICAL LIFT

FABRIC DOOR

STRUCTURAL

STEEL COLUMN

BATT INSUL

(R-19 MIN)

VERTICAL LIFT FABRIC

DOOR GUIDE BY

VERTICAL LIFT FABRIC

DOOR MANUF.

VERTICAL STEEL

DOOR GUIDE

SUPPORT, SEE

STRUCTURAL

NOTE: ALL EXPOSED SCREWS

ON METAL LINER WALL AND

ROOF PANELS SHALL HAVE

GASKETS FOR MOISTURE

CONTROL

METAL LINER PANEL ATTACHED

TO 152 (6") METAL STUD

FRAMING @ 406 (1'-4") O.C. WITH

R-19 BATT INSULATION

SPLIT-FACED CMU VENEER

W/ ADJUSTABLE SEISMIC

CMU VENEER ANCHORS @

406 [16"] O.C.

PRE-CAST CONCRETE

DECORATIVE PILASTER,

TYP. OF FOUR

[6'-0"]

[2 '-6

[2'-4"]

STRUCTURAL

STEEL COLUMN

VERTICAL LIFT FABRIC

DOOR GUIDE BY

VERTICAL LIFT FABRIC

DOOR MANUF.

PRE-CAST CONCRETE

DECORATIVE PILASTER,

TYP. OF FOUR

[7'-4"]

[2 '-6

[2'-4"]

PRE-FINISHED HORIZONTAL INSULATED

(MIN. R-19) METAL WALL PANELS

ATTACHED TO PANEL MANUFACTURER

SUPPLIED SUBSTRUCTURE ATTACHED

TO MAIN BUILDING STRUCTURE

203 [8"] CMU

K

A

OPP.

K

A

OPP.

DOOR LEAF (STACKED)

STRUCTURAL

STEEL COLUMN

VERTICAL LIFT FABRIC

DOOR GUIDE BY

VERTICAL LIFT FABRIC

DOOR MANUF.

PRE-CAST CONCRETE

DECORATIVE PILASTER,

TYP. OF FOUR

[2 '-1

0"

STRUCTURAL

STEEL COLUMN

PRE-CAST CONCRETE

DECORATIVE PILASTER,

TYP. OF FOUR

[6'-0"]

K

A

OPP.

K

A

OPP.

VERTICAL LIFT FABRIC

DOOR GUIDE BY

VERTICAL LIFT FABRIC

DOOR MANUF.

SPLIT-FACED CMU

VENEER W/ ADJUSTABLE

SEISMIC CMU VENEER

ANCHORS @ 406 [16"] O.C.

[2 '-1

0"

K

A

OPP.

[2'-4"]

SCALE: 1"=1'-0"

01' 1' 2'

DETAIL 1

A-310

SCALE: 1"=1'-0"

01' 1' 2'

DETAIL 4

A108

SCALE: 1"=1'-0"

01' 1' 2'

DETAIL 3

A110

SCALE: 1"=1'-0"

01' 1' 2'

DETAIL 5

A-108

SCALE: 1"=1'-0"

01' 1' 2'

[2 '-1

0"

PRE-CAST CONCRETE

DECORATIVE PILASTER CAP

BELOW, TYP. OF FOUR

R-10 RIGID INSULATION OVER

BITUMINOUS DAMPPROOFING

PRE-CAST CONCRETE

DECORATIVE PILASTER CAP

BELOW, TYP. OF FOUR

[2 '-4

C L

[3'-10"]

[2'-2"]

[2'-4"]

[3'-10"]

[2'-2"]

METAL LINER PANEL ATTACHED

TO 152 (6") METAL STUD

FRAMING @ 406 (1'-4") O.C. WITH

R-19 BATT INSULATION

EDGE OF SECOND FLOOR SLAB

203 [8"] CMU (1-HR RATED)

[6'-0"]

[2 '-4

C L

CL CL

[4'-4"]

[1'-6"]

16 [5/8"] GYPSUM BOARD

OVER 64 [2-1/2"] METAL STUD

FRAMING @ 406 [1'-4"] O.C.

16 [5/8"] GYPSUM BOARD

OVER 102 [4"] METAL STUD

FRAMING @ 406 [1'-4"] O.C.

PRE-FINISHED HORIZONTAL

INSULATED (MIN. R-19) METAL

WALL PANELS ATTACHED TO

PANEL MANUFACTURER SUPPLIED

SUBSTRUCTURE ATTACHED TO

MAIN BUILDING STRUCTURE

MULLION PIT AND

COVER FOR VERTICAL

LIFT FABRIC DOOR

MULLION AND GUIDE

BY VERTICAL LIFT

FABRIC DOOR MANUF.

METAL LINER PANEL ATTACHED

TO 152 (6") METAL STUD

FRAMING @ 406 (1'-4") O.C.

OVERHANG ABOVE

OVERHANG ABOVE

ROOF OVERHANG

ABOVE

[2'-4"] (*)

SPLIT-FACED CMU VENEER W/

ADJUSTABLE SEISMIC CMU

VENEER ANCHORS @ 406 [16"] O.C.

R-10 RIGID INSULATION OVER

BITUMINOUS DAMPPROOFING

203 [8"] CMU

[2 '-6

[1'-4"]

[2'-4"]

[1 '-4

[2'-0"]

[4'-0"]

[6'-0"]

[2 '-4

"] 35

[1 '-2

SPLIT-FACED CMU VENEER

W/ ADJUSTABLE SEISMIC

CMU VENEER ANCHORS @

406 [16"] O.C.

203 [8"] CMU

R-10 RIGID INSULATION

OVER BITUMINOUS

DAMPPROOFING

[6'-0"]

[1 '-2

[1

'-6

[1 '-4

SPLIT-FACED CMU VENEER

RETURN TO CMU

CONTINUOUS SEALANT W/

BACKER ROD EACH SIDE

ROOF OVERHANG ABOVE

CONTINUOUS

SEALANT W/

BACKER ROD

EACH SIDE

CONTINUOUS

SEALANT W/

BACKER ROD

EACH SIDE

CONTINUOUS

SEALANT W/ BACKER

ROD EACH SIDE

DETAIL 6

SCALE: 1"=1'-0"

01' 1' 2'

DETAIL 7

SCALE: 1"=1'-0"

01' 1' 2'

ARC SWING OF MULLION

REMOVABLE ALUMINUM

COVER (BY VERTICAL LIFT

FABRIC DOOR MANUF.)

MULLION (IN VERTICAL POSITION)

MULLION (IN

VERTICAL POSITION)

ANGLE BAR FRAME (SEE

STRUCTURAL)

REMOVABLE ALUMINUM

COVER (BY VERTICAL LIFT

FABRIC DOOR MANUF.)

MULLION BASE PIN

[1 '-1

[1 '-4

[4"] (*)

[9"] (*)

[6'-0"] (*)

TOP OF CONC

AT HANGAR DOOR

[1'-6"]

STEEL GIRTS, SEE

STRUCTURAL

STEEL GIRTS, SEE

STRUCTURAL

[1'-2"]

VERTICAL STEEL DOOR GUIDE

SUPPORT, SEE STRUCTURAL

203 [8"] CMU (1-HR RATED)

[1'-4"]

203 [8"] CMU

ROOF OVERHANG

ABOVE

PRE-FINISHED VERTICAL INSULATED

(MIN. R-19) METAL WALL PANELS

ATTACHED TO PANEL MANUFACTURER

SUPPLIED SUBSTRUCTURE ATTACHED

TO MAIN BUILDING STRUCTURE

VERTICAL STEEL DOOR

GUIDE SUPPORT, SEE

STRUCTURAL

VERTICAL STEEL DOOR

GUIDE SUPPORT, SEE

STRUCTURAL

[1 '-4

[5

7' -3

CL

PRE-FINISHED VERTICAL INSULATED

(MIN. R-19) METAL WALL PANELS

ATTACHED TO PANEL MANUFACTURER

SUPPLIED SUBSTRUCTURE ATTACHED

TO MAIN BUILDING STRUCTURE

A-513

A513A-310

A513

WHERE PRE-FINISHED HORIZONTAL INSULATED

(MIN. R-19) METAL WALL PANEL SYSTEM

ATTACHES TO METAL STUDS, STUDS TO BE

DESIGNED BY PANEL MANUFACTURER.

2.

[1'-0"]

CONSTRUCTION

JOINT

[1 '-6

[2

'-4

[1 '-6

[1'-6"]

[1'-6"]

[3'-0"]

[3'-0"]

OUTLINE OF WALL

PANEL ABOVE

OUTLINE OF WALL

PANEL ABOVE

SOFFIT OVERHANG ABOVE

PAINT EXPOSED CMU WITH

HIGH PERFORMANCE

COATING, COLOR TO

MATCH HORIZONTAL WALL

PANEL COLOR 'MARBLE"

PAINT EXPOSED CMU WITH

HIGH PERFORMANCE

COATING, COLOR TO

MATCH HORIZONTAL WALL

PANEL COLOR 'MARBLE"

STEEL TUBE FOR METAL

LINER CLOSURE PANELS

STEEL TUBE FOR METAL

WALL PANELS SUPPORT

BY PANEL

MANUFACTURER

STEEL TUBE FOR METAL

WALL PANELS SUPPORT BY

PANEL MANUFACTURER

STEEL TUBE FOR METAL

WALL PANELS SUPPORT BY

PANEL MANUFACTURER

STEEL TUBE FOR METAL

LINER CLOSURE PANELS

PJ

PJ PJ PJ

PJ PJ

LEGEND

SEE A-601 FOR EXTERIOR COLORS

04/25/11 ADDENDUM NO. 4 MZ

PANEL JOINT, SEE A-522 FOR

TYPICAL PANEL JOINT DETAILS

PJ

CONTROL JOINT, SEE A-522 FOR

TYPICAL CONTROL JOINT DETAILS

CJ

CJ

A-522

CJ

A-522 1

A-522

SIM

A-522

SIM

06/01/11

ISSUED FOR

CONSTRUCTION MZ

nbrown Rectangle nbrown Callout Fire rated closure piece installed here running up to roof deck. Use wall-to-deck detail WW-D-0074 or Hilti equivalent per RFI-292R1. Note this condition occurs at Rooms 230 and 219 dkuntz Callout Marble IW metal with vertical joints are to be installed from top of CMU wall to bottom of Hangar Door Soffit per RFI 360 dkuntz Callout Area behind pilasters are to remain open, but be free of trash and construction debris per RFI 369 a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

191 1615141312111098765432 17 18

N

M

L

K

J

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

C O

P Y

R I G

B

U R

A

D

M

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

C

HAWAII AIR NATIONAL GUARD

HICKAM AIR FORCE BASE

OAHU, HAWAII

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

52085

Project No. - KNMD069209

JUNE 2011

09/17/10 ISSUED FOR BID0 MZ

-W9133N-04-D-0003

TFI - F-22 SQUADRON

OPERATIONS & AIRCRAFT

MAINTENANCE UNIT HANGAR

NOTES:

1. FOR GENERAL NOTES, LEGEND, AND

ABBREVIATIONS SEE DRAWING E-001.

KNMD069209E-606.DWG

R. KOKE

S. STRATTON J. HOGLUND

TYPICAL DAYLIGHT MANAGEMENT SYSTEM

OCCUPANCY

SENSOR

PHOTOCELL

FOR DAYLIGHT

HARVESTING

DIMABLE FLUORESCENT

BALLAST CONTROL

INDIVIDUAL

SWITCHES

DAYLIGHT MANAGMENT CONTROLLER PANEL

RED

BLU

BLK

RED

+24 VDC

COMMON

+24 VDC

BLU

BLK

RED

BLU

BLK

COMMON

OUTPUT

COMMON

+24 VDC

OUTPUT

COMMON

COMMON

LINE

RED (LOAD)

RED (LINE)

BLK

NEUTRAL

B L K

R E

D

B L U

NEUTRAL

L

O

D

A

OFF

SWITCH

A

D

O

L

TYPICAL WIRING FOR

ROOMS UTILIZING

MULTIPLE SENSORS

WALL MOUNTED TOGGLES, 1

0R 3 WAY SWITCHING AS

INDICATED ON LIGHTING

PLANS

ADDITIONAL

LIGHTING LOAD

FOR ROOMS WITH

MULTI LEVEL

SWITCHING

TYP. CEILING MOUNTED OCCUPANCY SENSOR SCHEMATIC

(VERIFY ACTUAL WIRING REQUIREMENTS WITH MANUFACTURER.)

CEILING MOUNTED

24VDC SENSOR

COMMON

OUTPUT

TRANSFORMER

RELAY MODULE

(1)

(2)

(3)

LSOT-L

(1)

(2)

LSOT-R

(3)

MTR-L

MTR-R

1LS

OPEN LEFT SIDE

2LS

(BROKEN BELT)

CLS-R

(HAND CRANK)

CLS-L

(HAND CRANK)

5LS

OPEN LEFT SIDE

3LS

OPEN RIGHT SIDE

6LS

OPEN RIGHT SIDE

4LS

(BROKEN BELT)

WLS-R WLS-L

(WIND LOCK)(WIND LOCK)

STROBE LIGHT/ALARM

RCP

NOTE: EXPLOSION PROOF WIRING IF

REQUIRED (LOCATED BELOW 1'-0")

MCP

TB-D

" " FIELD WIRING.

ONE PER DOOR SYSTEM.

IF RCP IS SPECIFIED THEN

ADDITIONAL QTY. OF WIRES

REQUIRED AS FOLLOWS TO

CONNECT FROM MCP TO RCP.

(TYP) HANGAR DOOR WIRING DIAGRAM

(1)

(2)

(3)

LSOT

MTR

1LS CLS

(BROKEN BELT)

2LS

(BROKEN ROPE)

OPEN CENTER

5LS

OPEN LEFT SIDE

3LS

(BROKEN ROPE)

WLS-R WLS-L

(WIND LOCK)(WIND LOCK)

STROBE LIGHT/ALARM

RCP

NOTE: EXPLOSION PROOF WIRING IF

REQUIRED (LOCATED BELOW 1'-0")

MCP

TB-D

" " FIELD WIRING.

ONE PER DOOR SYSTEM.

IF RCP IS SPECIFIED THEN

ADDITIONAL QTY. OF WIRES

REQUIRED AS FOLLOWS TO

CONNECT FROM MCP TO RCP.

(TYP) HANGAR DOOR WIRING DIAGRAM

4LS

OPEN RIGHT SIDE

BR

CONTROL WIRING PER

MANUFACTURER'S REQUIREMENT.

I:\USNGB\52085\CAD\ELEC\KNMD069209E-606.DWG 05-27-2011 2:46 JSWEATON

S

LV

LEGEND

LEGEND

R1 R2

R1

R2

EEW / EEW/S HORN STROBE SCHEMATIC

120V G

EEW AND EEW/S, SEE PLUMBING

DRAWING FOR LOCATIONS.

MZ6/1/11

ISSUED FOR

CONSTRUCTION

File details come from the government source that posted it. Updated .