SOLICITATION W50S9J-21-Q-0003
FIRE ALARM INSPECTION AND TESTING AT 130TH AIRLIFT WING, CHARLESTON, WV
QUESTIONS AND ANSWERS:
1) Building 107: Sprinkler System – 1 Annual Sprinkler Riser – 1 Annual Does this mean there are 1 or 2 systems and should this be a Quarterly Inspection?
There is one sprinkler system (including riser and backflow) Inspection is annual.
2) Building 137: No Fire Alarm Panel Does not list a Fire Alarm panel in device counts BLDG 137 is tied to BLDG 136 panel
3) Building 142: Sprinkler System – 1 Annual Sprinkler Riser – 1 Annual Does this mean there are 1 or 2 systems and should this be a Quarterly Inspection?
Bldg 142: There is one sprinkler system (including riser and backflow) Inspection is annual.
4) Building 144: Special Haz/ Gas Suppression System Does Not list any devices associated with this system. Are device counts in the main quantities listed for Building 144?
Bldg 144: Two Nozzles, one fusible link, 2 Pulls and 1 cylinder *NOTE* 301 panel has a comm line that runs to BLDG 128
5) Building 302: No Fire Alarm Panel Does not list a Fire Alarm panel in device counts BLDG 302 is tied to the panel in 301
6) Building 303: No Fire Alarm Panel Does not list a Fire Alarm panel in device counts BLDG 303 is tied to the panel in 301
7) Building 408: Sprinkler System – 1 Quarterly Sprinkler Riser – 1 Annual Does this mean there are 1 or 2 systems and should this be a Quarterly Inspection?
BLDG 408 is a pump house. The fire pumps (2) are electric; there is one electric jockey pump
8) Building 421: Fire Suppression Control Panel Does this Panel control all Devices or should there be a separate Fire Alarm Panel listed in addition to the Suppression Panel? Also there are not any Audio/ Visual Devices listed 407 and 421 both have panels that control a HEF system. There is a Conventional panel that handles both 407 and 421 (fire alarms, troubles, ect)
9) Building 422: Fire Pump is Listed Is this Fire Pump Electric or Diesel and are we to include churn tests in the Proposal?
There is no fire pumps installed in 422
10) We would need clarification on Sprinkler Inspection frequencies for all Buildings listed in Appendix A All inspection criteria regarding HEF, Fire Alarms, Fire Pumps, Dry Chemical Systems, ect… are inspected in accordance with UFC 3-601-02 Operation and Maintenance: Inspection, Testing, and Maintenance of Fire Protection systems. There are various frequency benchmarks listed. This document can be found at https://www.wbdg.org/ffc/dod/unified-facilities-critera-ufc When fusible links are replaced for hood kitchen suppression systems and Dry Chem System, old fusible link must be turned in to the Fire Prevention Office.