About this file
This document is a combined synopsis/solicitation for a Blanket Purchase Agreement (BPA) for Crane Rental with Operator Services. The government is seeking a single contractor to provide crane rental and operator services for training events at Volk Field Air National Guard Base in Wisconsin. The anticipated period of performance is 1 September 2024 through 31 August 2029.
The solicitation is a 100% small business set-aside under NAICS code 238990 with a size standard of $19.0 million. Offers will be evaluated solely on price, with the lowest-priced, responsible offeror receiving the award. No site visits are allowed, and the government will not provide fuel for the cranes. The solicitation includes a list of applicable clauses, and questions from potential offerors are due by 19 August 2024, with offers due by 26 August 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QUESTION ANSWERS DOC - 08082024.pdf | ||
| QUESTION ANSWERS DOC - 07262024.pdf | ||
| VOLK FIELD CRANE RENTAL PRICING WORKSHEET.pdf | ||
| SOW - CDDAR CRANE SERVICE - 07232024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S9H-24-Q-A017
CRANE RENTAL BPA – QUESTIONS/ ANSWERS
Q1. What is the weight of the aircraft?
A1. 18,000 to 90,000 lbs.
Q2. What are the dimensions of the aircraft (length, width, height)?
A2. Approximately 15ft to 60ft
Q3. Are there any specific lifting points on the aircraft?
A3. Yes, but Subject Matter Experts (SME) will always be on site to direct crane operators
Q4. To determine the maximum reach required, could you provide the CenterPoint of the training aircraft and the distance (in feet) it needs to be moved?
A4. We will always provide all oversight of the operation and required information
Q5. Are there any sensitive or fragile parts of the aircraft that require special attention during the move?
A5. Yes, all areas are sensitive. SME’s will always be on site and present during any operation.
Q6. Engineered Lift Plans: Will engineered lift plans in accordance with EM385 be required for the crane operations during the training events? If so, could you please provide any specific guidelines or templates that we should follow?
A6. No engineer lift plans are required.
Q7. Rigging Provision: Are we required to provide our own rigging for the crane operations, or will rigging be supplied by the government? If we need to provide it, are there any specific specifications or standards we need to adhere to?
A7. No rigging equipment is required. Government will provide all necessary equipment aside from the crane and operator.
Q8. What type of crane is required for the work? Rough Terrain or All-terrain?
A8. 75-ton 100 ton, Either
Q9. Is there make, model or year preference for the cranes?
A9. No preference
Q10. Will the fuel for the crane be provided at the site?
A10. No Fuel provided. It is on the company to supply
Q11. Is there an opportunity for a site visit before the offer due date?
A11. No
Q12. Will the crane and operator be needed on base every day?
A12. No, only when a BPA call is placed and only for the period of performance specified on the call.
Q13. Will both cranes be needed each day?
A13. It depends on the requirement of the BPA Call. There are times when both cranes may be needed and times when they may not. Requirements vary depending on the training event.
Q14. Will both be used simultaneously?
A14. Possibly, depending on the training event.
Q15. If cranes need to be stored on base until needed, is that permissible?
A15. Storage of cranes on base is not permitted overnights or weekends. It is the vendors responsibility to find storage off base if needed.
Q16. The quote is asking for the price of one day of service. Is that all that is required, or will the cranes be required for multiple days during the training?
A16. Please review the solicitation documents in their entirety. There are times when cranes may be needed for multiple days and times when only one day of usage will be required.
Q17. Is there a way to set aside fixed costs associated with set up etc.?
A17. All costs associated should be included in the price list provided by the Government.
Q18. What is the maximum value of the equipment being hauled on the crane?
A18. The value of the equipment that is being lifted and moved varies depending on the training event.
The Government estimates that the maximum value of the equipment is approximately $1,000,000.