W50S9H‐20‐Q‐0012 – HWR PREFABRICATED BUILDING

QUESTIONS & ANSWERS

1. Can you please clarify what you are looking for as 4x4x6 skids for building to mount to? It may be simple but I am not clear on this.

A1. (4) 4” x 6” treated skids running the length of the building

2. I am assuming that skids are 4x4 and 6’ long (quantity as required) and be directly under the each I‐beam of the trailer. If I am correct will the skids be provided by the government or should I plan to provide.

A2. (4) 4” x 6” treated skids running the length of the building. Contractor provided and mounted to building

3. I am assuming we will use over the roof strapping for tie down requirement, what is the ground surface that we will insert our ground anchor ties into? Concrete, asphalt, dirt, gravel, etc.?

A3. The concrete pad extends 1 foot beyond all sides of the building. It is dirt beyond that.

4. What will be the height you will be mounting the TV, do you want the data & power behind the TV concealed or at 18”AFF?

A4. (1) Data & power at 18” AFF and (1) data & power at 70” AFF

5. Are you intending us to make the power and fiber connections to the trailer? If yes how far from the trailer will the services be?

A5. No. Just provide an access from the outside to the 200 amp circuit breaker panel and the communications cabinet