Question and Answer 1.docx
DOCX document 29 KB Posted
- Attached to
- Dining Facility / Cafeteria Tables and Chairs Federal contract opportunity
- Solicitation number
- W50S9F-23-Q-0021
- Issued by
- Department of the Army National Guard
About this file
This document contains questions and answers regarding the delivery and installation of dining facility tables and chairs under solicitation number W50S9F-23-Q-0021 issued by the Department of the Army National Guard. The delivery and installation must occur between 0600 and 1630 hours Monday through Thursday, excluding federal holidays and weekends. There is no loading dock at the dining facility, but delivery vehicles can park at the rear entrance with double doors to offload products. The entrance is also the installation location so there is no distance to transport products. Stairs or elevators are not required to reach the installation site.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.01.Question and Answer 2.pdf | ||
| B.01.Combined Synopsis and Solicitation.pdf | ||
| A.02.Purchase Description.pdf | ||
| B.01.52.212-3 (DEVIATION 2023-O0002) (DEC 2022) ALTERNATE I (OCT 2014).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answer 1 Dining Facility / Cafeteria Tables and Chairs W50S9F-23-Q-0021
1)
· Question: Can we deliver and install the product during business hours?
· Answer: Delivery and install will occur Monday – Thursday between 0600 -1630. Installation will not occur on Federal holidays or Friday – Sunday.
2)
· Question: Is there a loading dock?
· Answer: Not at dining facility.
3)
· Question: If there isn’t a loading dock, where will we offload the truck?
· Answer: There is an entrance with double doors in the rear of the dining facility that allows for a delivery vehicle to parked.
4)
· Question: Approximately how far is it from the truck offload site to the install location?
· Answer: The entrance is located at the unloading site.
5)
· Question: Are there any stairs that the product will need to go up or down to reach the install location?
· Answer: No
6)
· Question: Will we use a passenger or freight elevator for delivery to the install location?
· Answer: No