194 IS AV Tech Refresh QnA.pdf
PDF 303 KB Posted
- Attached to
- SCIF AV Tech Refresh Federal contract opportunity
- Solicitation number
- W50S9E22Q0010
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 194 IS AV Tech Refresh - Requirements Description v2.pdf | ||
| Ops Floor Diagram.png | PNG image | |
| Service WD 2015-5539 - 21 Jul 22.pdf | ||
| Requirements Description - Building 109 SCIF AV Refresh.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
194 IS AV Tech Refresh Questions
1. What is "Waterfall Style” audio?
a. Audio that is isolated to certain square footage based on speaker direction and placement. IE each U will have its own semi-isolated audio area.
2. The eighteen drops mentioned are the red bars on the diagram; what are the sizes requested in addition to the 7 preexisting?
a. The red bars annotate where the displays are desired, should be roughly 8ft projector display screens with 4k UHD projectors.
3. What is the projector requirement?
a. Dependent upon the application intended:
i. Main Projector – 100”+ display screen 4k UHD
ii. U Displays 8ft display screen 4k UHD
4. Are there existing projector screens. If so what are the dimensions?
a. Yes, one 14ft wide projector screen.
5. What is the actual number of workstations in the SCIF?
a. 23 workstations are to be connected to the system in this requirement.
6. It seems that each workstation has two monitors. Is one to be dedicated to showing remote material or is it to be switched in some way? if so who commands the switching the sender or receiver?
a. Each workstation will have its own KVM switch operated by the user.
7. How many DirectTV inputs are there?
a. 3
8. Are the secure VTC systems existing?
a. Yes
9. Who operates the KVM switches? Do these connect to a bank of PCs somewhere?
a. See answer to question 6. No, KVM switches are display port output and there is one output at each leads computer.
10. Are there loudspeakers already in the central briefing area?
a. Yes
11. What are the overall dimensions of the SCIF – length and width, ceiling height? (Plans aren’t legible zoomed in.)
a. Approximately 170ft by 40ft, ceilings range from 12ft to 30ft with a drop ceiling scattered throughout.
12. Could we get a list clarifying which equipment should be replace, and brand/model numbers for those remaining.
a. All equipment in the AV system is to be refreshed.
13. To clarify, would you ask us to re-code on the existing platform, or start brand new with that?
a. Brand New.
| 2022-08-25T08:45:38-0700 | |
| SNOW.KEVIN.E.1513889026 |
File details come from the government source that posted it. Updated .