Boiler Site Visit Q and A.pdf

PDF 201 KB Posted

Attached to
Cleaning and Servicing of Boiler Systems, Camp Murray, WA
Solicitation number
W50S9E22Q0008
Issued by

View the file

Other files

File Type Posted
B855_Mech 1st Floor.pdf PDF
B101_Mech.pdf PDF
B855_Mech 2nd Floor.pdf PDF
Boiler Site Visit 16 Aug 2022.pdf PDF
B109_M401.PDF PDF
05 SOW ETRD222608 Svc HVAC Boiler Systems.pdf PDF
Wage Determination 20220728.pdf PDF
COMBO Solicitation Boiler Camp Murray WA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Boiler Site Visit Q and A

Q1 – Do we know the amount of Glycol that will be required to service all of the systems?

A1 – No, the amount of Glycol for each system is unknown but there are mechanical plans for each building available.

File details come from the government source that posted it. Updated .