05 SOW ETRD222608 Svc HVAC Boiler Systems.pdf

PDF 356 KB Posted

Attached to
Cleaning and Servicing of Boiler Systems, Camp Murray, WA
Solicitation number
W50S9E22Q0008
Issued by

View the file

Other files

File Type Posted
B855_Mech 1st Floor.pdf PDF
Boiler Site Visit Q and A.pdf PDF
B101_Mech.pdf PDF
B855_Mech 2nd Floor.pdf PDF
Boiler Site Visit 16 Aug 2022.pdf PDF
B109_M401.PDF PDF
Wage Determination 20220728.pdf PDF
COMBO Solicitation Boiler Camp Murray WA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE CIVIL ENGINEER

WASHINGTON AIR NATIONAL GUARD

106 41st DIVISION WAY

CAMP MURRAY, WASHINGTON 98430-5022

SPECIFICATIONS

PROJECT TITLE: Service HVAC Boiler Systems

PROJECT NUMBER: ETRD 222608

LOCATION: Camp Murray, WA

DATE: 07 July 2022

FOR

UNITED STATES PROPERTY AND FISCAL OFFICER

WASHINGTON NATIONAL GUARD

32 QUARTERMASTER DRIVE

CAMP MURRAY, WASHINGTON 98430-5170

00 Index

INDEX - 001

PART 1 - GENERAL REQUIREMENTS

Section Title Page Count

01010

Statement of Work Summary of Work

01011 Summary of Project 2 01090 Reference Standards 3 01210 Hazardous Materials 4 01220 Confined Space 1 01300 Submittals 5 01400 Quality Control 5 01500 Construction Facilities and Temporary Controls 4 01505 Construction Waste Management 3 01506 Recycling Estimating 5 01600 Material and Equipment 2 01700 Contract Close-out 4

PART 2 - TECHNICAL REQUIREMENTS

Section Title Page Count

N/A

ETRD 222608, Service HVAC Boiler Systems

WASHINGTON AIR NATIONAL GUARD

106 41st Division Way

194th Wing, Civil Engineer Flight Camp Murray, WA 98430-5022

STATEMENT OF WORK

ETRD 222608

Service HVAC Boiler System

Contracting Officer (KO) SMSgt Justin Scherer

Phone: (253) 512-2178

DATE

05 Jul 2022

1 GENERAL REQUIREMENTS

1.1 PURPOSE (See detailed description of work in section 2)

The purpose of this project is to

1) Service HVAC Boiler system in building 101 (Primary)

2) Service HVAC Boiler system in building 855 (Additive/Option Bid)

3) Service HVAC Boiler system in building 109 (Additive/Option Bid)

2 DESCRIPTION OF WORK

2.1 SERVICE HVAC BOILER IN BUILDING 101 (Primary)

A. Drain and flush both the heating and chilled water systems with fresh water.

B. Flush and remove all bad glycol (until the conductivity is below 250 µmhos).

C. Clean all Strainers in both systems.

D. Add inhibited propylene glycol to achieve the desired freeze point (or a minimum of 20% by volume), E. Treat the system with Product 6426 (non-chromate, corrosion inhibitor) at a recommended industry or OEM rate as applicable; if necessary, to bring the nitrite up to 1,000 ppm.

F. After the system has circulated for several days to become homogeneous check the pH and adjust if out of range.

2.2 SERVICE HVAC BOILER IN BUILDING 855 (Additive/Option Bid)

B. Flush and remove all bad glycol (until the conductivity is below 250 µmhos).

C. Clean all Strainers in the system.

ETRD 222608, Service HVAC Boiler Systems

D. Add inhibited propylene glycol to achieve the desired freeze point (or a minimum of 20% by volume).

E. Treat the system with Product 6426 (non-chromate, corrosion inhibitor) at a recommended industry or OEM rate as applicable; if necessary, to bring the nitrite up to 1,000 ppm.

2.3 SERVICE HVAC BOILER IN BUILDING 109 (Additive/Option Bid)

B. Flush and remove all bad glycol (until the conductivity is below 250 µmhos).

C. Clean all Strainers in the system.

D. Add inhibited propylene glycol to achieve the desired freeze point (or a minimum of 20% by volume).

E. Treat the system with Product 6426 (non-chromate, corrosion inhibitor) at a recommended industry or OEM rate as applicable; if necessary, to bring the nitrite up to 1,000 ppm

2.4 NOTES

A. Contractor shall perform heating water testing by a third party qualified water treatment contractor and develop a water treatment plan. Add chemicals per the treatment plan. Provide testing results, treatment plan, and chemicals added as a submittal to the Government and place in O&M. Clean all heating system strainers after system startup by manufacturer representative but prior to chemical addition and final inspection (strainers: boiler loop, pump strainers, air separator).

B. Generally the pH will be slightly high, and in those instances the pH should be reduced by adding small amounts of Color-Guard acid solution.

C. As the glycol continues to breakdown the pH will drop further, until it eventually becomes acidic. Corrosion on system components is accelerated once the pH falls below 8, and will increase by orders of magnitude as it becomes increasingly acidic.

D. Government (Civil Engineer Flight) will submit a copy of the SDS documents prior to start of work.

E. Contractor will provide the amounts of materials added to the system.

F. All spill will be reported to the COR immediately.

G. Nothing shall be discharged to the ground.

2.5 ATTACHMENTS

N/A

SECTION 01010

SUMMARY OF WORK

PART 1: GENERAL

1.01 SECTION INCLUDES

A. Contractor Use of Site and Premises B. Permits, Fees, and Notices C. Utility Locates D. Indemnification of Government E. Number of Items F. Subcontractors G. Discrepancies in Documents H. Abbreviations/Definitions

1.02 CONTRACTOR USE OF SITE AND PREMISES

A. The Contractor will have access to the work area during normal WA ANG work hours but may have access to the following work hours with prior coordination. All Western WA ANG facilities will not be accessible during Federal holidays plus one additional day. (e.g. holiday is on a Monday, the Friday prior will be observed as a Federal holiday or holiday is on a Friday, the Monday after will be observed as a Federal holiday).

WA ANG Facilities: Monday - Friday 0700 – 1600

B. Normal working hours will be reviewed at the Pre-construction Conference. The Washington Air National Guard is on a 4-day, 10-hour schedule, Tuesday thru Friday; however, contractors may be able to work with a five-day presence after prior coordination. The Contractor shall not work outside the normal working hours without prior written approval by the Contracting Officer. Requests to work outside the normal work schedule shall be provided not later than three workdays prior to the date requested. The contractor shall not proceed with any work outside the normal schedule unless approved by the Contracting Officer. Work outside the normal work schedule approved by the Contracting Officer shall be at no additional expense to Government.

C. Utility Outages and Shutdown: The Contractor shall provide written notice to the Contracting Officer at least 7 calendar days prior to any proposed utility interruption. The Contractor shall not proceed with the interruption until authorized by the Contracting Officer.

D. Fire Prevention: The Contractor will assure that fire prevention actions are observed by all employees, including sub-contractors.

E. Full Time Tenants. The Contractor shall work so as not to disrupt the full time tenant operations of the base. This includes items such as utility outages, traffic routing, material storage locations, etc.

F. Regularly Scheduled Drill (RSD). One weekend per month is a military RSD for the Air National Guard. On these weekends, there is a surge of off base personnel that come to work and train on the base. The Contractor shall ensure that prior to these weekends the project sites are cleaned, unused materials consolidated, open trenches filled or covered, maximum parking places are available, traffic routes open, etc. The dates for the RSDs will be discussed at the Pre Construction Conference.

G. Installation Access.

1. Camp Murray is in compliance with the REAL ID Act of 2005. This means visitors presenting drivers licenses and identification cards stating “Not Valid for Federal Purposes" or "Federal

Limits May Apply” will need to provide supplemental documentation to prove identity in order to be issued a temporary installation pass.

a. The Department of Homeland Security (https://www.dhs.gov/real-id) offers a list of acceptable identification options by state and territory.

b. If you do not have an ID card listed on the Department of Defense issued ID cards website (https://www.cac.mil/), you must stop by the Visitor Control Center on Camp Murray to receive a temporary visitor pass.

b. All persons requesting unescorted access will be vetted through the National Crime Information Center, prior to being issued a visitor pass.

2. If a visitor requesting access does not have REAL ID Act compliant form of identification and cannot provide supplemental identity proofing documents, they must be escorted at all times while on the installation.

3. To expedite the screening process, visitors may complete a secure DBIDS pre-enrollment web submission using the following link: https://dbids-global-enroll.dmdc.mil/preenrollui/#!/

4. Prior to entering the installation for the first time, individuals need to pick up their pass documentation from the Visitor Control Center, located at the Main Gate. Allow sufficient time for pass issuance prior to reporting to the job site or duty location. Any questions can be directed to the Camp Murray Visitor Control Center at 253-512-2045 or 194WG.SFS.CampMurrayVCC@us.af.mil.

5. AT Level I Training. This standard language is for contractor employees with an area of performance within a Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness training is available at the following website:

http://jko.jten.mil

1.03 PERMITS, FEES AND NOTICES

A. The contractor shall secure and pay for all temporary or permanent permits, certificates, tests, inspection and "hookup" charges, and other legal fees required by government agencies and private utility-furnishing organizations having jurisdiction over the work under the contracts.

1.04 UTILITY LOCATES

A. PUBLIC UTILITIES. At least 48 hours before any excavation, the contractor shall arrange for a utility locate (Call Before You Dig, 1-800-424-5555). Most of the utilities on Air National Guard facilities are owned by the utility companies up to the meters on the buildings.

B. PRIVATE (MILITARY) UTILITIES. The Contractor shall also contact the Base Civil Engineer seven calendar days prior to the excavation to arrange for a military utility locate. Some utilities such as fiber optics and water lines are installed by military units and require separate locates from the public utilities.

1.05 INDEMNIFICATION OF GOVERNMENT

A. The Contractor shall indemnify and save the Government harmless from any loss to any other Contractor caused by any time extension.

1.06 NUMBER OF ITEMS

A. When an item is referred to in a singular number or where the number of items required is listed, the Contractor shall supply all of the items necessary to make the installation complete. The number of items, when given, is for assistance only.

1.07 SUBCONTRACTING

A. A listing of all subcontractors to be used on the project must be submitted to and approved by the Contracting Officer prior to commencement of their work. A Standard Form 1413 must be submitted in accordance with the instruction given at the Pre-Construction Conference. The Subcontractor will not be allowed on site until the SF 1413 is approved by the Contracting Officer.

1.08 DISCREPANCIES IN DOCUMENTS

A. Some of these specifications may include incomplete sentences. Omissions of words or phrases such as "the Contractor shall", "shall be", "as noted on the drawings", "a", "an", "the", and "all" shall be inferred if omitted from sentences in the specifications or on notes in the drawings.

B. The Contractor shall not be relieved of performing such omissions from drawings, specifications or details of work which are manifestly necessary to carry out the intent of the work.

C. The Contractor shall check all drawings furnished immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. Written dimensions marked on drawings shall, in general, be followed in preference to scaling dimensions from drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby. This means the Contractor is responsible for finding all discrepancies between drawings for different disciplines such as electrical and mechanical. These differences must be submitted to the Contracting Officer during the bid process. The Government will not relieve any discipline of work found on another discipline’s drawings but not on their own

1.09 ABBREVIATIONS/DEFINITIONS

A. The Drawings and Specifications use accepted standard abbreviations. The Contractor shall accept the Contracting Officer's interpretations of such abbreviations where in doubt. Certain words are used extensively throughout the documents, and are interpreted as follows:

1. "Owner" means "the Government".

2. "Architect/Engineer" means the "Contracting Officer".

3. "Approved" means "Approved by the Contracting Officer".

4. "For Approval" means "For the Contracting Officer's Approval".

5. "Required" means "Required by the Contracting Officer".

6. "Provide" means "Furnish and Install".

END OF SECTION

01011-1 01011 Summary of Project

SECTION 01011

SUMMARY OF PROJECT

PART 1 GENERAL

A. Summary of Project B. Government Furnished Property C. Work by Government D. Location E. Commencement and Completion of Work F. Requirement for Critical Path Chart

1.02 SUMMARY OF PROJECT

A. The work covered by these specifications includes furnishing all plant, labor, equipment, materials, tools and other items required to complete this project in accordance with these specifications and the contract drawings and subject to the terms of the contract.

B. Principle Features: See Statement of Work

C. Additive Bid Items (or Options): See Statement of Work

1.03 GOVERNMENT FURNISHED PROPERTY:

None

1.04 WORK BY GOVERNMENT:

None

1.05 LOCATION

A. Base: Camp Murray, WA and JBLM, WA

B. Directions to Project Site on Base: See base map for directions: From I-5 take exit 122 go to the main gate Camp Murray, approximately .50 miles, 106 Division way, find building 106.

1.06 COMMENCEMENT AND COMPLETION OF WORK

A. Preliminary Project Schedule – Within 7 calendar days from the Notice to Proceed (NTP).

B. Start Construction Work – 10 calendar days from date of Notice to Proceed (NTP).

C. Construction Work Completed – The project closeout is 30 calendar days from date of NTP.

Preliminary Closeout Inspection will be conducted on the 28th day. Majority of service shall be completed between scheduled Regularly Scheduled Drills (RSDs).

D. Complete Preliminary Closeout Inspection Items – Within 28 calendar days from Construction Work Completed.

E. No work or workers (except for training on equipment) on site after BOD. The date of acceptance of the building and systems by the Government will occur during this 30 calendar day period.

F. Warranty Management Plan – Warranty valid for 90 days from service completion.

G. Close Out Documents – 30 days from NTP.

H. Post-Construction Warranty Inspection – conducted 30 days post-service.

01011-2 01011 Summary of Project

1.07 REQUIREMENT FOR CRITICAL PATH METHOD

A. In contracts where close management of each element by the contractor is necessary to ensure timely performance, the contractor shall submit a detailed critical path chart representing the sequences of tasks needed to complete the project and set contractor’s baseline. This should help identify resource constraints, estimated duration of tasks, float or slack time, critical tasks, et cetera.

B. Additionally, contractor will be required to identify their phased or planned approach to reduce facility or customer interruptions during construction.

Section 01090, Page 1 of 3 01090 Reference Standards

SECTION 01090

REFERENCE STANDARDS

A. For products or workmanship specified by association, trade, or Federal Standards, comply with requirements of the standard, except when more stringent requirements are specified or are required by applicable codes, then comply with the more stringent requirement.

B. Conform to the most current publication at the time of construction.

AA Aluminum Association

AABC Associated Air Balance Council

AASHTO American Association of State Highway and Transportation Officials

ACI American Concrete Institute

ADC Air Diffusion Council

AGC Associated General Contractors of America

AI Asphalt Institute

AIA American Institute of Architects

AITC American Institute of Timber Construction

AISC American Institute of Steel Construction

AISI American Iron and Steel Institute

AMCA Air Movement and Control Association

ANSI American National Standards Institute

APA American Plywood Association

ARI Air-Conditioning and Refrigeration Institute

ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers

ASME American Society of Mechanical Engineers

ASPA American Sod Producers Association

ASTM American Society for Testing and Materials

Section 01090, Page 2 of 3

AWWA American Water Works Association

AWI Architectural Woodwork Institute

AWPA American Wood-Preservers' Association

AWS American Welding Society

CDA Copper Development Association

CLFMI Chain Link Fence Manufacturers Institute

CRSI Concrete Reinforcing Steel Institute

DOE Department of Ecology

EJCDC Engineers' Joint Contract Documents Committee

EJMA Expansion Joint Manufacturers Association

FGMA Flat Glass Marketing Association

FM Factory Mutual System

FS Federal Specification

GSA General Services Administration

GA Gypsum Association

IEEE Institute of Electrical and Electronics Engineers

IMIAC International Masonry Industry All-Weather Council

MFMA Maple Flooring Manufacturers Association

MIL Military Specification

ML/SFA Metal Lath/Steel Framing Association

NAAMM National Association of Architectural Metal Manufacturers

NEBB National Environmental Balancing Bureau

NEC National Electrical Code

NEMA National Electrical Manufacturers' Association

NFPA National Fire Protection Association

Section 01090, Page 3 of 3

NSWMA National Solid Wastes Management Association

NTMA National Terrazzo and Mosaic Association

PCA Portland Cement Association

PC Prestressed Concrete Institute

PS Product Standard

RIS Redwood Inspection Service

RCSHSB Red Cedar Shingle and Handsplit Shake Bureau

SDI Steel Deck Institute

SDI Steel Door Institute

SIGMA Sealed Insulating Glass Manufacturers Association

SJI Steel Joist Institute

SMACNA Sheet Metal and Air Conditioning Contractors' National Association

SSPC Steel Structures Painting Council

TAS Technical Aid Series

TCA Tile Council of America, Inc.

TMA Thermal Insulation Manufacturer's Association

UL Underwriters' Laboratories, Inc.

UBC Uniform Building Code

UMC Uniform Mechanical Code

UPC Uniform Plumbing Code

WCLIB West Coast Lumber Inspection Bureau

Section 01210, Page 1 of 4 01210 Hazardous Materials

SECTION 01210

HAZARDOUS MATERIALS

PART 1 - GENERAL

A. Hazardous Material Usage.

B. Hazardous Material Identification

1.02 RELATED SECTIONS

A. All

1.03 HAZARDOUS MATERIAL USAGE

A. The contractor shall establish a hazardous material (HM) storage and distribution system when HM is to be used. All HM required to support the contract shall be reported to the Hazardous Material Pharmacy (HMP) using the Contractor HM Identification Form. The Contractor HM Identification Form will be provided to the Contractor at or prior to the Pre-Construction meeting. Additional HM needed by the contractor shall be identified to the Contracting Officer's Representative for approval by the HMP. See Attachment X.

B. The contractor planning to use HM for the work must register with the base HMP prior to start of work in order to support the installation’s compliance with Executive Order 12856, Federal Compliance with Right-to-Know Laws and Pollution Prevention Requirements.

C. The contractor shall maintain Contractor HM Identification Form for HM on the job site for inspection/verification.

D. Contracting Officer's Representative will verify that the HM identified to HMP is the only HM in use on the job site.

E. Contractors shall provide the HMP:

1. A list of each material and quantity of material for all proposed HM. HM shall mean any item that is:

- a health hazard or physical hazard as defined in 29 CFR, 1910.1200(c).

- regulated in its disposal by EPA under 40 CFR.

- hazardous as defined by DOT regulations under 49 CFR.

- hazardous as defined by the Dangerous Goods Regulations of the International Air Transport

Association.

2. A material safety data sheet (MSDS) for each item on the list.

F. The contractor shall establish his/her own HM storage and issue location that complies with federal, state and local environmental regulations. Materials issued shall be tracked for quantities used. Unused materials shall be inventoried and removed from the ANG installation prior to close out of the contract or expiration date of the HM. Reports of materials delivered, used and removed from the installation shall be submitted to the Contracting Officer monthly and prior to contract close out. See Attachment X.

G The contractor shall comply with all federal, state and local environmental standards.

Section 01210, Page 2 of 4

H. The contractor shall accompany the Base Environmental Engineer and the COR on project close out inspection to ensure all used/unused HM was removed from the installation. This requirement shall not be a punch list item and must be accomplished prior to the Government accepting beneficial occupancy of the facility or construction item.

PART 2 PRODUCTS: Not Used.

PART 3 EXECUTION: Not Used.

Section 01210, Page 3 of 4

ATTACHMENT X

Contractor Hazardous Material Identification Form

Date: ________ Part I

This part is to be completed by Contractor prior to start date, and shall be maintained on the job site.

Contractor Company: _____________________________ Proposed work term: _____________ to ______________ Contractor Point of Contact: ________________________ 24-Hour phone/pager number: ______________________

HM to be used:

MFG./Product

M.S.D.S.

Attached

Quantity used

Disposal Procedures Used/Unused material removed from ANG installation

Note: This form is good for a one-month period and is to be submitted to the Hazardous Material Pharmacy (HMP). All HM (hazardous material) used thereafter will be identified to Contacting Officer's Representative for approval by the HMP. See Part II for Contractor close out procedures.

HMP phone number is (253) 982-3196.

Approval Signatures:

COR (Contracting Officer’s Representative ___________________

BEER (Bio-Environmental Engineering Representative) ___________________

EM (Environmental Manager) ___________________

SO (Safety Officer) ___________________

Section 01210, Page 4 of 4

Contractor HM Identification Form

(Close Out Procedures)

Part II

Attach this form to Part I

The Contractor shall accompany the Contraction Officer’s Representative and Environmental Manager on the close out inspection to ensure all used/unused HM was removed from the installation.

Close out Signatures: Date:____________

COR (Contracting Officers' Representative) _______________________

BEER (Bio-Environmental Engineering Representative _______________________

EM (Environmental Manager) _______________________

Contractor _______________________

SECTION 01220

CONFINED SPACE

A. Notification of Work in Permit-Required Confined Space.

B. Contractor Compliance with OSHA (Public Law 91-956).

1.02 NOTIFICATION OF WORK IN A PERMIT-REQUIRED CONFINED SPACE

A. The Government shall notify the contractor that work will be performed in a permit-required confined space and ensure the information is included in the statement of work (SOW) or equivalent contracting tool.

B. Notification requirements are contained in AFI 91-202, The U.S. Air Force Mishap Prevention Program and AFFARS Clause 5352.223-9001, Health and Safety on Government Installations.

C. The WA Air National Guard Facility Manager will provide details on the contents of the space and any known hazards that make the space permit-required.

1.03 CONTRACTOR COMPLIANCE WITH OSHA (PUBLIC LAW 91-956)

A. It is the Contractor’s sole responsibility for compliance with the OSHA (Public Law 91-956).

B. The Contractor shall coordinate with Joint Base Lewis-McChord Fire and Emergency Services to approve the use of the rescue team prior to work in the confined space.

C. The Contractor shall provide information regarding hazards encountered or created in the space.

D. The Contractor shall coordinate with the COR to agree upon the permit space entry system to be used when both Air Force organizational and contractor personnel will be working in a permit-required confined space. The Contractor program must meet Air Force confined space program requirements, as a minimum, before Air Force personnel may enter a contractor permit-required confined space.

Section 01300, Page 1 of 5 01300, Submittals

SECTION 01300

SUBMITTALS

A. Progress Schedule

B. Material Approval Submittals

C. Shop Drawings

D. Samples

E. Laboratories and Testing Agencies

F. Contractor Entry to McChord Air Force Base

G. Material Submittal Schedule

1.02 PROGRESS SCHEDULE

A. N/A

1.03 MATERIAL APPROVAL SUBMITTALS

A. The Contractor shall submit a Material Approval Submittal Form (AF Form 3000) for all materials, shop drawings, samples, etc as required in the specifications. A summary listing of items to be submitted to the Contracting Officer by the Contractor is included herein for convenience only. Such listing is not necessarily all inclusive. The Contractor shall examine all portions of the Contract Documents for complete submittal requirements. The submittals shall include the following information.

1. Specification Section

2. Manufacturer's Name

3. Brand Name

4. Model Name

5. Catalog Information

B. Submit the materials with an AF Form 3000 to the Contracting Officer’s Representative (COR).

At the same time, furnish a copy of just the AF 3000 to the Contracting Officer. The COR will review the submittal, then forward it to the Contracting Officer for approval. The Contracting Officer will then return the submittal to the Contractor.

Section 01300, Page 2 of 5

C. Submit the number of copies which the Contractor requires plus two copies which will be retained by the Contracting Officer.

D. Materials to be utilized within the first 10 calendar days of construction shall be scheduled and submitted within 10 calendar days of the Contract Award. Remaining submittals shall be scheduled and submitted not later than 10 calendar days prior to use to allow review/approval actions. For items with long order times, submit 10 calendar days prior to the order date to ensure on time delivery.

E. Mark by circling (do not highlight) each copy to identify applicable producers, models, options, and other data. Supplement the manufacturer's standard data to provide information unique to this project.

F. Multiple Items can be submitted using one AF Form 3000. For each AF Form 3000, list the individual submittal items under “Description of Material”. When using more than one AF Form 3000, number each form in the “Submission Number” box in chronological order of submission (The first AF Form 3000 is number 1, the second AF Form 3000 submitted is number 2, etc.) If a submittal is disapproved, resubmit using the same numerical followed by a letter (if AF Form 3000 number 3 is disapproved, resubmit the AF Form 3000 and label it number 3A)

G. Identify conflicts between manufacturer's instructions and the Contract Documents.

1.04 SHOP DRAWINGS

A. N/A

1.05 SAMPLES

1.06 LABORATORIES AND TEST AGENCIES

A. N/A

1.07 CONTRACTOR ENTRY TO DEPARTMENT OF DEFENSE INSTALLATIONS

A. For projects on active duty DoD Installations, the Contractor shall submit a letter to the Contracting Officer requesting approval for entry onto the installation to perform the work related to this project. The letter shall be on the Contractor’s letterhead and shall be in the format shown on the next page.

Section 01300, Page 3 of 5

XYZ Construction Company 123 Anystreet Road

Anywhere, WA 99999-9999

To: USPFO-PC

1. Request approval for our employees and our sub-contractor’s employees to enter ________ for the duration of Contract DAHA45-_-______, Project No. ____________, Project Name: ________________, Building ____.

2. A listing of employers, employees, and employees’ driver’s license or social security numbers is below.

General Contractor Name Last Name First Name Driver’s License No./SSN

Sub-Contractor A Name

Sub-Contractor B Name

I.M. Thebigboss President

0-

0, S ub m itt al s

EN

D

O F

SE

C

TI

O

N

Section 01400, Page 1 of 5 01400, Quality Control

SECTION 01400

QUALITY CONTROL

A. Progress Meetings

B. Requests for Information (RFI)

C. Progress Reports

D. Contractor Quality Assurance and Workmanship

E. Government Inspections

F. Testing Agency Labels

G. Energy Efficiency

H. Inspection and Testing Laboratory Services

I. Laboratory Reports

J. Manufacturers' Field Services and Reports

K. Contractor Travel on Government Aircraft

L. Project Record Documents.

1.02 PROGRESS MEETINGS

1.03 REQUESTS FOR INFORMATION (RFI)

A. Should a question arise requiring a response from the Government, the Contractor shall initiate a Request for Information using the form provided at the Pre Construction Conference. The Contractor will state the problem and list a recommended solution (for example, “The plans specify 10 feet between fence posts, but on this leg of the fence there is a span of 21 feet. I recommend extending the distance between posts to 10.5 feet, eliminating the 1 foot fence section. How should I proceed?”).

B. The Contractor will email the form to the Contracting Officer who will then email it to the Contracting Officer’s Representative. The COR will make a recommendation, and also indicate if this should be a cost or no cost change, and if a time extension is required. If there is a time extension or cost change required, the COR will attach a Statement of Work and request that the Contracting Officer request a proposal from the contractor. The COR will email it back to the Contracting Officer, who will email it back to the Contractor with an RFP if applicable.

Section 01400, Page 2 of 5

C. The Contractor will then act on the response. Should the Contractor disagree with the COR’s response, the Contractor will bring this to the attention of the Contracting Officer.

1.04 PROGRESS REPORTS

A. N/A

1.05 CONTRACTOR QUALITY ASSURANCE AND WORKMANSHIP

A. The contractor will monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality. Comply with specified standards as a minimum quality for the work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. Where a quality standard is not specified, the contractor shall provide a level of workmanship that meets a recognized industry standard. The Contracting Officer shall resolve conflicts in interpretations of quality of workmanship.

B. Comply fully with manufacturers' instructions, including each step in sequence. Should manufacturer's instructions conflict with Contract Documents, request clarification from the Contracting Officer before proceeding.

C. Perform work by persons qualified in the specified trade or specialty to ensure quality workmanship.

D. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion or disfigurement.

1.06 GOVERNMENT INSPECTIONS

A. Provide equipment to permit the Contracting Officer or his appointed representative to inspect the work in safety, such as ladders, scaffolding and gangways.

B. No underground utility or structure shall be backfilled until they are inspected and approved by the Contracting Officer. The Contractor shall give the Contracting Officer two work days notice of the intention to backfill or cover work. Work covered up without approval or required inspection shall, upon request of the Contracting Officer, be uncovered for inspection at the expense of the Contractor.

1.07 TESTING AGENCY LABELS

A. The contractor shall submit proof that the items which he/she proposes to furnish under this specification conform to the standards of the Underwriter's Laboratories (UL). The UL label shall be accepted as conforming to this requirement.

B. In lieu of the label, the Contractor may submit a written certification from any nationally recognized testing agency, adequately equipped and competent to perform such services, that the item has been tested and conforms to the standards, including methods of test, of the Underwriter's Laboratories.

C. Should specified reference standards conflict with Contract Documents, request clarification from the Contracting Officer.

1.08 ENERGY EFFICIENCY

Section 01400, Page 3 of 5

A. Energy-using products shall be energy efficient (where life-cycle cost-effective and available, as determined by the Contracting Officer). Energy efficient means the product

1. Meets Department of Energy (DOE) and Environmental Protection Agency (EPA) criteria for use of the “Energy Star” trademark label; or

2. Is in the upper 25 percent of efficiency for all similar products as designated by the Department of Energy’s (DOE) Federal Energy Management Program.

B. Information is available via the Internet at http://www.energystar.gov and http://www.eren.doe.gov/femp/procurement .

C. The Energy Star label shall be accepted as conforming to this requirement.

1.09 INSPECTION AND TESTING LABORATORY SERVICES

A. The contractor shall employ and pay for services of an independent testing laboratory to perform inspections and testing as outlined in the specifications. The Contractor will perform additional inspections and tests if required by the Contracting Officer.

B. Employment of a testing laboratory shall in no way relieve the Contractor of the obligation to perform work in accordance with the requirements of the Contract Documents.

C. Testing Agencies will:

1. Comply with requirements of the individual specification sections.

2. Be licensed by the State of Washington.

3. Maintain a full time Engineer registered by the State of Washington.

D. Testing Equipment should be calibrated at reasonable intervals with devices of an accuracy traceable to either National Bureau of Standards (NBS) or accepted values of natural physical constants.

E. The Contractor will provide incidental labor and facilities to provide access to the work to be tested, to obtain and handle samples at the site or at source of products to be tested, and to facilitate tests and inspections, storage and curing of test samples.

F. Notify the Contracting Officer and laboratory three work days prior to expected time for operations requiring inspection and testing services.

Section 01400, Page 4 of 5

1.10 LABORATORY REPORTS

A. After each inspection and test, promptly submit (using a Transmittal Letter) two copies of labora-tory report(s) to the Contracting Officer’ Representative.

B. Include:

1. Date issued.

2. Project title and number.

3. Name of inspector.

4. Date and time of sampling or inspection.

5. Identification of product and Specifications section.

6. Location in the project.

7. Type of inspection or test.

8. Date of test.

9. Results of tests.

10. Conformance with Contract Documents

C. When requested by the Contracting Officer, provide interpretation of test results.

1.11 MANUFACTURERS' FIELD SERVICES AND REPORTS

A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions of surfaces and installation, quality of workmanship, start-up, testing, adjusting, and balancing of equipment as applicable, and to initiate instructions when necessary.

B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.

C. Submit report using a Transmittal Letter within 14 calendar days of observation to the Contracting Officer’s Representative for review.

1.12 CONTRACTOR TRAVEL ON GOVERNMENT AIRCRAFT

A. At the Contracting Officer's option, the Contractor, when accompanied by a Government representative, may travel on Government aircraft to inspect the projects if it is at Paine Field or Bellingham Air National Guard Stations. Non Government personnel will complete a hold harmless agreement and other required paperwork prior to flying.

Section 01400, Page 5 of 5

1.13 PROJECT RECORD DOCUMENTS

A. Maintain on site, one set of the following record documents. The Contractor is responsible for his sub-contractors having all the required record documents on site.

1. Contact drawings

2. Specifications: Legibly mark and record at each product section the description of actual products installed, including the following:

a. Manufacturer's name and product model and number.

b. Product substitutions or alternates used.

c. Changes made by addenda and modifications.

3. Addenda

4. Change orders and other modifications to the contract.

5. Revised shop drawings, product data, and samples.

B. In progress construction documents and shop drawings: Legibly mark each item to record actual construction including:

1. Measured depths of foundations in relation to finished floor datum.

2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.

3. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the work.

4. Field changes of dimension and detail.

5. Details not on original contract drawings.

Section 01500, Page 1 of 4

01500, Constn Facilities & Temp Controls

SECTION 01500

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Temporary Utilities: electricity, lighting, heat, air conditioning, ventilation, telephone service, water, sanitary facilities, and rubbish removal.

B. Temporary Controls: Barriers, enclosures, protection of work.

C. Construction Facilities: Cleaning, temporary buildings, and removal of utilities.

1.02 TEMPORARY ELECTRICITY AND LIGHTING

A. Connect to the existing power service. Power consumption shall not disrupt the Government's need for continuous service. The Government will provide electricity at no cost to the Contractor. The Contractor will provide all equipment and services required for hook up at no expense to the Government.

B. The Contractor will exercise measures to conserve energy.

C. The Contractor will provide temporary distribution equipment, overcurrent protection, wiring, outlets, meters, lighting, and other items, as required.

1.03 TEMPORARY HEAT AND AIR CONDITIONING

A. Prior to operation of permanent equipment for temporary heating purposes, verify that installation is approved for operation, equipment is lubricated and filters are in place. Provide and pay for operation, maintenance, and regular replacement of filters and worn or consumed parts.

1.04 TEMPORARY VENTILATION

A. The Contractor will ventilate enclosed areas to assist cure of materials, dissipate humidity, and prevent accumulation of dust, fumes, vapors, or gases.

1.05 TELEPHONE SERVICE

A. The Contractor will provide, maintain, and pay for telephone service to field office.

1.06 TEMPORARY WATER

A. The Government will pay the cost of reasonable amounts of water used when taken from Government sources. The Contracting Officer shall determine what is a reasonable amount of water. The Contractor will take steps to conserve water.

B. The Contractor will provide hoses, manifolds, adapters, and other equipment required for water service.

Section 01500, Page 2 of 4

C. If taken from fire hydrants, the Contractor will contact the local fire department prior to opening the fire hydrant.

1.07 TEMPORARY SANITARY FACILITIES

A. Provide and maintain in sanitary condition, required facilities and enclosures. Place where directed by the Contracting Officer.

1.08 RUBBISH REMOVAL

A. The contractor will collect and dispose of all construction debris. Disposal shall be off site at a legal refuse collection site. Do not use Government rubbish containers.

B. See Section 1.13, Progress Cleaning, for frequency of rubbish removal.

1.09 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas and to protect existing facilities and adjacent properties from damage from construction operations.

B. Provide protection for plant life designated to remain. Replace damaged plant life.

C. Protect non contractor owned vehicular traffic, stored materials, site and structures from damage.

D. Provide detour signs to route traffic around closed work areas.

E. Notify the Contracting Officer seven calendar days prior to closing a work area. Keep building occupants informed of changes in building access, parking areas, etc.

1.10 EXTERIOR ENCLOSURES

A. Provide temporary fire retardant, weather-tight closure of exterior openings to accommodate acceptable working conditions and protection for products, to allow for temporary heating and maintenance of required ambient temperatures identified in individual specification sections, and to prevent entry of unauthorized persons. Provide access doors with self-closing hardware and locks.

1.11 INTERIOR ENCLOSURES

A. Provide temporary fire retardant partitions and ceilings, as required, to separate work areas from Government occupied areas, to prevent penetration of dust and moisture into Government occupied areas, and to prevent damage to existing materials and equipment.

B. Construction: Framing and plywood sheet materials with closed joints and sealed edges at intersections with existing surfaces.

1.12 PROTECTION OF INSTALLED WORK

A. Protect installed work and provide special protection where specified in individual specification sections.

Section 01500, Page 3 of 4

B. Provide temporary and removable protection for installed products. Control activity in immediate work area to minimize damage.

C. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.

D. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials.

E. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer.

F. Prohibit traffic from landscaped areas.

1.13 PROGRESS CLEANING

A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.

C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

D. Remove waste materials, debris, and rubbish from site weekly or as required by the Contracting Officer.

E. Remove combustible rubbish and debris from the site daily.

F. Foodstuff and related debris from workmen's lunches and coffee breaks shall be placed in galvanized metal garbage container and removed from the site daily. Containers shall be sound, watertight and shall provide a barrier to insects, rodents and other animals.

G. See Section 01700, 1.03, Final Cleaning.

1.14 FIELD OFFICES AND SHEDS

A. Provide office with lighting, electrical outlets, heating equipment, and furniture, as required, for project completion.

B. Provide sheds for tool and material storage, as required.

C. Provide appropriate fire extinguishers.

D. Locate as directed by the Contracting Officer.

1.15 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A. Remove temporary above grade or buried utilities, equipment, facilities, and materials, prior to final inspection.

Section 01500, Page 4 of 4

B. Clean and repair damage caused by installation or use of temporary work.

C. Restore existing facilities used during construction to original condition.

Section 01505, Page 1 of 3

01505, Constn Waste Management

SECTION 01505

CONSTRUCTION WASTE MANAGEMENT

A. Waste Management Goals.

B. Waste Management Plan.

C. Management Plan Implementation.

1.02 RELATED SECTIONS

All

1.03 WASTE MANAGEMENT GOALS

A. The Government has established that this Project shall generate the least amount of waste possible and that processes that ensure the generation of as little waste as possible due to error, poor planning, breakage, mishandling, contamination, or other factors shall be employed.

B. Of the inevitable waste that is generated, as many of the waste materials as economically feasible shall be recycled, reused, or salvaged. Waste disposal in landfills shall be minimized. For purposes of this section, the following definitions apply:

RECYCLE: To remove a waste material from the Project site to another site for remanufacture into a new product for reuse by others.

REUSE: To reuse a construction waste material in some manner on the Project site.

SALVAGE: To remove a waste material from the Project site to another site for resale or reuse by others.

C. With regard to these goals the Contractor shall develop, for the Contracting Officer’s review, a Waste Management Plan for this Project.

1.04 WASTE MANAGEMENT PLAN

A. Draft Waste Management Plan: Submit to the Contracting Officer within 10 calendar days after receipt of Notice of to Proceed. The Draft Plan shall contain the following:

1. Analysis of the proposed jobsite wastes to be generated, including types and quantities.

2. Landfill options: The name of the landfill(s) where trash will be disposed of, the applicable landfill tipping fee(s), and the projected cost of disposing of all Project waste in the landfill(s).

3. Alternatives to Landfilling: A list of each material proposed to be salvaged, reused, or recycled during the course of the Project, the proposed local market for each material, and the estimated net cost savings or additional costs resulting from separating and recycling (versus landfilling) each material.

“Net” means that the following have been subtracted from the cost of separating and recycling:

(a) revenue from the sale of recycled or salvaged materials and

Section 01505, Page 2 of 3

(b) landfill tipping fees saved due to diversion of materials from the landfill. The list of these materials is to include, at minimum, the following materials:

(1) Paving materials

(2) Structural and other steel

(3) Gypsum wall board

(4) CMU block

B. Resources for Development of Waste Management Plan: The following sources may be useful in developing the Draft Waste Management Plan:

1. Recycling Haulers and Markets: Local haulers and markets for recyclable materials can be obtained from the Washington Department of Ecology Recycling Assistance office at 1-800-RECYCLE (800-732- 9253) or at http://1800recycle.wa.gov. This list is provided for information only and is not necessarily comprehensive; other haulers and markets are acceptable.

2. Recycling Economics Information: Section 01506 contains information that may be useful in estimating the costs or savings of recycling options.

C. Final Waste Management Plan: Once the Contracting Officer has determined which of the recycling options addressed in the draft Waste Management Plan are acceptable, the Contractor shall submit a Final Waste Management Plan to the Contracting Officer within 10 calendar days of the receipt of the approved draft Waste Management Plan.

The Final Waste Management Plan shall contain the following:

1. Analysis of the proposed jobsite waste to be generated, including types and quantities.

2. Landfill options: The name of the landfill(s) where trash will be disposed of, the applicable landfill tipping fee(s), and the projected cost of disposing of all Project waste in the landfill(s).

3. Alternatives to Landfilling: A list of the waste materials from the Project that will be separated for reuse, salvage, or recycling.

4. Materials Handling Procedures: A description of the means by which any waste materials identified in item (3) above will be protected from contamination, and a description of the means to be employed in recycling the above materials consistent with requirements for acceptance by designated facilities.

5. Transportation: A description of the means of transportation of the recyclable materials (whether materials will be site-separated and self-hauled to designated centers, or whether mixed materials will be collected by a waste hauler and removed from the site) and destination of materials.

D. Waste Management Plan Implementation

1. Manager: The Contractor shall designate an on-site party (or parties) responsible for instructing workers and overseeing and documenting results of the Waste Management Plan for the Project.

2. Distribution: The Contractor shall distribute copies of the Waste Management Plan to the Job Site Foreman, each Subcontractor, and three copies to the Contracting Officer.

3. Instruction: The Contractor shall provide on-site instruction of appropriate separation, handling, and recycling, salvage, reuse, and return methods to be used by all parties at the appropriate stages of the Project.

4. Separation facilities: The Contractor shall lay out and label a specific area to facilitate separation of materials for potential recycling, salvage, reuse, and return. Recycling and waste bin areas are to be kept neat and clean and clearly marked in order to avoid contamination of materials.

5. Hazardous wastes: Hazardous wastes shall be separated, stored, and disposed of according to local regulations.

Section 01505, Page 3 of 3

6. Application for Progress Payments: The Contractor shall submit with each Application for Progress Payment a Summary of Waste Generated by the Project. The Summary shall be submitted on a form acceptable to the Owner and shall contain the following information:

(a). The amount (in tons or cubic yards) of material landfilled from the Project, the identity of the landfill, the total amount of tipping fees paid at the landfill, and the total disposal cost. Include manifests, weight tickets, receipt, and invoices.

(b). For each material recycled, reused, or salvaged from the Project, the amount (in tons or cubic yards), the date removed from the jobsite, the receiving party, the transportation cost, the amount of any money paid or received for the recycled or salvaged material, and the net total cost or savings of salvage or recycling each material. Attach manifests, weight tickets, receipts, and invoices.

Section 01506, Page 1 of…

This is the start of the file's text. The full file is on GovTribe.