This document is a set of questions and answers from a site visit for a federal solicitation to install grass at the Washington Air National Guard facility at Fairchild AFB.

The key details are:

The solicitation is for a firm fixed-price contract to install grass seed or sod around Building 375 and the ANG memorial site. The grass must be drought and heat resistant, with a blend of at least 70-80% tall fescue, 10-20% perennial rye, and no more than 10% Kentucky bluegrass. The contractor is responsible for site preparation, seeding/sodding, and maintenance until July 31, 2024 when the grass must be ready for use. The contractor will also be required to remove rocks larger than 0.5 inches and provide 2 inches of topsoil prior to seeding/sodding. The solicitation is a total small business set-aside under NAICS code 561730 with an annual revenue not exceeding $9.5M. Quotes are due by 2pm PT on April 16, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Install Grass- **ADDED Q&A from site visit and SCA WD, newest first.
File Type Posted
Wage Determination 2015-5537 REV 21.pdf PDF
Grass Layout.pdf PDF
Install Grass SOW.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grass Install Questions

1) Topsoil Requirement- Washington State Department of Transportation (WSDOT) Type "A" (Black Dirt). Black Dirt shall consist of a mixture of sand, silt, and decayed plant fiber. The sand content shall not exceed 60% and 1% gravel, the organic content shall not be less than 4%, and the pH shall lie between 5.5 and 7.5.

2) What size rock will be acceptable to leave behind?

¾ inch or greater rocks must be removed.

3) Will the rock need to be removed off base.

Yes, all rock that is collected greater than ¾ inch must be removed off base.